13. Standard accuracy for conventional surveying instruments. In triangulation for tertiary control, the triangle closure not to exceed base measurement by а. 5" b. 10" c. 20" d. 30" 14. Standard accuracy for conventional surveying instruments. In primary traverse, the Probable Error on distance measurement not to exceed a. 1:5,000 b. 1:20,000 с. 1:40,000 d. 1:50,000 15. Standard accuracy for conventional surveying instruments. In astronomical observation of primary traverse, the number of series in the evening is a. 4 b. 4 or 2 c. 2 d. 8 or 4 16. Standard accuracy for conventional surveying instruments. In astronomical observation of primary traverse, the number of series in the morning is a. 4 b. 4 or 2 C. d. 8 or 4

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Kindly give me all answers ????

13. Standard accuracy for conventional surveying instruments. In triangulation for tertiary control, the
triangle closure not to exceed base measurement by
а. 5"
b. 10"
c.
20"
d. 30"
14. Standard accuracy for conventional surveying instruments. In primary traverse, the Probable Error on
distance measurement not to exceed
а. 1:5,000
b. 1:20,000
с. 1:40,000
d. 1:50,000
15. Standard accuracy for conventional surveying instruments. In astronomical observation of primary
traverse, the number of series in the evening is
а. 4
b. 4 оr 2
с. 2
d. 8 or 4
16. Standard accuracy for conventional surveying instruments. In astronomical observation of primary
traverse, the number of series in the morning is
a. 4
b. 4 or 2
C.
2
d. 8 or 4
Transcribed Image Text:13. Standard accuracy for conventional surveying instruments. In triangulation for tertiary control, the triangle closure not to exceed base measurement by а. 5" b. 10" c. 20" d. 30" 14. Standard accuracy for conventional surveying instruments. In primary traverse, the Probable Error on distance measurement not to exceed а. 1:5,000 b. 1:20,000 с. 1:40,000 d. 1:50,000 15. Standard accuracy for conventional surveying instruments. In astronomical observation of primary traverse, the number of series in the evening is а. 4 b. 4 оr 2 с. 2 d. 8 or 4 16. Standard accuracy for conventional surveying instruments. In astronomical observation of primary traverse, the number of series in the morning is a. 4 b. 4 or 2 C. 2 d. 8 or 4
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Steel
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning