1.The field engineer on a highway construction was left alone when the supplier of filling materials ask him on the total volume needed for the road embankment on station 10 + 040 to station 10 + 60. However the chief estimator is out for vacation and the estimate of filling materials is not yet available, therefore the engineer has no other option but compare the volume of the required material. The base width given on the plan is 12m and the height of fill at the left edge of the cross section is 1.5 m, at the centerline the fill is 2 m, and the right edge fill is 5 m. at station 10 + 060, the cross-section has centerline fill of 3 m, at the right edge the fill is 6 m, and the left edge the fill is 2.5 m. Assume even natural ground slope from left edge to the right edge of the cross section. How many trips will be ordered if the capacity of the dump truck is five cubic meters per trip? Side slope is 2:1 2. Compute the value of x from the cross section notes shown if the width of roadway is 9m. with side slope of 1:1. 5.42/40.92 + 4.25/ x/+0.60 3. Compute the side slope of the given cross-section shown 6.67/-1.84 -2.6 4.64/-0.40

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
1.The field engineer on a highway construction was left alone when the supplier of filling materials ask him on the total
volume needed for the road embankment on station 10 + 040 to station 10 + 60. However the chief estimator is out for
vacation and the estimate of filling materials is not yet available, therefore the engineer has no other option but compare
the volume of the required material. The base width given on the plan is 12m and the height of fill at the left edge of the
cross section is 1.5 m, at the centerline the fill is 2 m, and the right edge fill is 5 m. at station 10 + 060, the cross-section
has centerline fill of 3 m, at the right edge the fill is 6 m, and the left edge the fill is 2.5 m. Assume even natural ground
slope from left edge to the right edge of the cross section. How many trips will be ordered if the capacity of the dump
truck is five cubic meters per trip? Side slope is 2:1
2. Compute the value of x from the cross section notes shown if the width of roadway is 9m. with side slope of 1:1.
5.42/40.92
+ 4.25/
x/+0.60
3. Compute the side slope of the given cross-section shown
6.67/-1.84
-2.6
4.64/-0.40
Transcribed Image Text:1.The field engineer on a highway construction was left alone when the supplier of filling materials ask him on the total volume needed for the road embankment on station 10 + 040 to station 10 + 60. However the chief estimator is out for vacation and the estimate of filling materials is not yet available, therefore the engineer has no other option but compare the volume of the required material. The base width given on the plan is 12m and the height of fill at the left edge of the cross section is 1.5 m, at the centerline the fill is 2 m, and the right edge fill is 5 m. at station 10 + 060, the cross-section has centerline fill of 3 m, at the right edge the fill is 6 m, and the left edge the fill is 2.5 m. Assume even natural ground slope from left edge to the right edge of the cross section. How many trips will be ordered if the capacity of the dump truck is five cubic meters per trip? Side slope is 2:1 2. Compute the value of x from the cross section notes shown if the width of roadway is 9m. with side slope of 1:1. 5.42/40.92 + 4.25/ x/+0.60 3. Compute the side slope of the given cross-section shown 6.67/-1.84 -2.6 4.64/-0.40
Expert Solution
steps

Step by step

Solved in 4 steps with 1 images

Blurred answer
Knowledge Booster
Management of materials
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning