1.The field engineer on a highway construction was left alone when the supplier of filling materials ask him on the total volume needed for the road embankment on station 10 + 040 to station 10 + 60. However the chief estimator is out for vacation and the estimate of filling materials is not yet available, therefore the engineer has no other option but compare the volume of the required material. The base width given on the plan is 12m and the height of fill at the left edge of the cross section is 1.5 m, at the centerline the fill is 2 m, and the right edge fill is 5 m. at station 10 + 060, the cross-section has centerline fill of 3 m, at the right edge the fill is 6 m, and the left edge the fill is 2.5 m. Assume even natural ground slope from left edge to the right edge of the cross section. How many trips will be ordered if the capacity of the dump truck is five cubic meters per trip? Side slope is 2:1 2. Compute the value of x from the cross section notes shown if the width of roadway is 9m. with side slope of 1:1. 5.42/40.92 + 4.25/ x/+0.60 3. Compute the side slope of the given cross-section shown 6.67/-1.84 -2.6 4.64/-0.40
1.The field engineer on a highway construction was left alone when the supplier of filling materials ask him on the total volume needed for the road embankment on station 10 + 040 to station 10 + 60. However the chief estimator is out for vacation and the estimate of filling materials is not yet available, therefore the engineer has no other option but compare the volume of the required material. The base width given on the plan is 12m and the height of fill at the left edge of the cross section is 1.5 m, at the centerline the fill is 2 m, and the right edge fill is 5 m. at station 10 + 060, the cross-section has centerline fill of 3 m, at the right edge the fill is 6 m, and the left edge the fill is 2.5 m. Assume even natural ground slope from left edge to the right edge of the cross section. How many trips will be ordered if the capacity of the dump truck is five cubic meters per trip? Side slope is 2:1 2. Compute the value of x from the cross section notes shown if the width of roadway is 9m. with side slope of 1:1. 5.42/40.92 + 4.25/ x/+0.60 3. Compute the side slope of the given cross-section shown 6.67/-1.84 -2.6 4.64/-0.40
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 4 steps with 1 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning