1.283 BM-1 1.284 (а) 1.285 0.675 0.674 BM-2 0.677 (b) 0.674 0.677 0.678 Sum Mean INSTRUMENT SET UP NEAR BM-2 Station FS BS 1.478 BM-2 1.480 (b') 1.476 2.143 2.140 BM-1 2.145 (a') 2.142 2.143 2.146 Sum Mean

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

My subject is Fundamentals of Surveying.

1.283
BM-1
1.284
(а)
1.285
0.675
0.674
BM-2
0.677
(b)
0.674
0.677
0.678
Sum
Mean
INSTRUMENT SET UP NEAR BM-2
Station
FS
BS
1.478
BM-2
1.480
(b')
1.476
2.143
2.140
BM-1
2.145
(a')
2.142
2.143
2.146
Sum
Mean
Transcribed Image Text:1.283 BM-1 1.284 (а) 1.285 0.675 0.674 BM-2 0.677 (b) 0.674 0.677 0.678 Sum Mean INSTRUMENT SET UP NEAR BM-2 Station FS BS 1.478 BM-2 1.480 (b') 1.476 2.143 2.140 BM-1 2.145 (a') 2.142 2.143 2.146 Sum Mean
II.
PROCEDURE
a. Mark off points on pavement with chalk about 150 to 200 meters apart and call
these BM-1 and BM-2. The elevation of BM-2 is to be determined while the
elevation of BM-1 is known or assumed. Also, imagine that there is an intervening
deep ravine or wide river between these two points.
b. Set up and level very carefully the instrument at a point (A) near BM-1.
c. Take and record a series of three consecutive backsight rod readings on BM-1 and
six consecutive foresight rod readings on BM-2.
d. Move the instrument to point B (on the opposite side of the imaginary ravine and
near BM-2, set up, and level the instrument carefully.
e. From the new set up, take and record three consecutive foresight rod readings on
BM-2 and six consecutive backsight rod readings on BM-1.
f.
Tabulate observed and computed values accordingly.
INSTRUMENT SET UP NEAR BM-1
Station
BS
FS
1
Transcribed Image Text:II. PROCEDURE a. Mark off points on pavement with chalk about 150 to 200 meters apart and call these BM-1 and BM-2. The elevation of BM-2 is to be determined while the elevation of BM-1 is known or assumed. Also, imagine that there is an intervening deep ravine or wide river between these two points. b. Set up and level very carefully the instrument at a point (A) near BM-1. c. Take and record a series of three consecutive backsight rod readings on BM-1 and six consecutive foresight rod readings on BM-2. d. Move the instrument to point B (on the opposite side of the imaginary ravine and near BM-2, set up, and level the instrument carefully. e. From the new set up, take and record three consecutive foresight rod readings on BM-2 and six consecutive backsight rod readings on BM-1. f. Tabulate observed and computed values accordingly. INSTRUMENT SET UP NEAR BM-1 Station BS FS 1
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning