1.2 m height highway embankment of rge lateral extent is to be placed over surface clay deposit of 10 m thickness hich is underlain by sand as shown in ne figure below. -- Compute the ultimate settlement xpected under the embankment. - If the maximum tolerable settlement f the embankment surface pavement is cm, when should the pavement be laced after completion of embankment Embankment of large extent (Y = 16.1 KN/m³): ( G.W.T Clay Y = 18.1 KN/m? P. = 50 Kpa , e, =1.01 C. = 0.17, C, = 0.04 C, = 13 m lyr lacement? - What is the average excess pore rater pressure at the completion of mbankment placement? - What is the total effective stress (at id of clay layer) at the time of paving? Sand (X = 18.1 KN/m) 10 m |1.2 m

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A 1.2 m height highway embankment of
large lateral extent is to be placed over
a surface clay deposit of 10 m thickness
which is underlain by sand as shown in
the figure below.
A- Compute the ultimate settlement
expected under the embankment.
Embankment of large extent (y = 16.1 KN/m')
B- If the maximum tolerable settlement
G.W.T
of the embankment surface pavement is
3cm, when should the pavement be
placed after completion of embankment
placement?
C- What is the average excess pore
Clay
= 18.1 KN/m
"sat
Р. 3 50 Кра , е, %3D1.01
C. = 0.17, C, = 0.04
C, = 13 m lyr
water pressure at the completion of
embankment placement?
D- What is the total effective stress (at
mid of clay layer) at the time of paving?
Sand (Y = 18.1 KN/m)
sat
10m
| 1.2 m
Transcribed Image Text:A 1.2 m height highway embankment of large lateral extent is to be placed over a surface clay deposit of 10 m thickness which is underlain by sand as shown in the figure below. A- Compute the ultimate settlement expected under the embankment. Embankment of large extent (y = 16.1 KN/m') B- If the maximum tolerable settlement G.W.T of the embankment surface pavement is 3cm, when should the pavement be placed after completion of embankment placement? C- What is the average excess pore Clay = 18.1 KN/m "sat Р. 3 50 Кра , е, %3D1.01 C. = 0.17, C, = 0.04 C, = 13 m lyr water pressure at the completion of embankment placement? D- What is the total effective stress (at mid of clay layer) at the time of paving? Sand (Y = 18.1 KN/m) sat 10m | 1.2 m
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning