1. Using PERT, create a graphical representation based on this Table. 2. Determine the Critical Path Method using the graphical presentation of number 1. M1 M2 M3 M4 ACTIVITY Footing + Starter Wall Slab On Grade (SOG) CHB Laying Concrete Roof Beam Roof Framing + Roofing Sheet M5 M6 Plastering Works M7 M.E.P Pipes & Fixtures Installation M8 Waterproofing + Windows Installation M9 Ceilings & Partitions M10 Interior & Exterior Painting M11 Functionality Test M12 Land Scaping DURATION (Days) 12 10 14 4 692 10 12 5 12 14 1 1

Computer Networking: A Top-Down Approach (7th Edition)
7th Edition
ISBN:9780133594140
Author:James Kurose, Keith Ross
Publisher:James Kurose, Keith Ross
Chapter1: Computer Networks And The Internet
Section: Chapter Questions
Problem R1RQ: What is the difference between a host and an end system? List several different types of end...
icon
Related questions
Question
1. Using PERT, create a graphical representation based on this Table.
2. Determine the Critical Path Method using the graphical presentation of number 1.
M1
M2
M3
M4
M5
M6
M7
ACTIVITY
Footing + Starter Wall
Slab On Grade (SOG)
CHB Laying
Concrete Roof Beam
Roof Framing + Roofing Sheet
Plastering Works
M.E.P Pipes & Fixtures Installation
M8 Waterproofing + Windows Installation
M9
Ceilings & Partitions
M10
Interior & Exterior Painting
M11
Functionality Test
M12 Land Scaping
DURATION
(Days)
12
10
14
4
6
10
12
5
12
14
1
1
Transcribed Image Text:1. Using PERT, create a graphical representation based on this Table. 2. Determine the Critical Path Method using the graphical presentation of number 1. M1 M2 M3 M4 M5 M6 M7 ACTIVITY Footing + Starter Wall Slab On Grade (SOG) CHB Laying Concrete Roof Beam Roof Framing + Roofing Sheet Plastering Works M.E.P Pipes & Fixtures Installation M8 Waterproofing + Windows Installation M9 Ceilings & Partitions M10 Interior & Exterior Painting M11 Functionality Test M12 Land Scaping DURATION (Days) 12 10 14 4 6 10 12 5 12 14 1 1
Expert Solution
steps

Step by step

Solved in 6 steps with 2 images

Blurred answer
Recommended textbooks for you
Computer Networking: A Top-Down Approach (7th Edi…
Computer Networking: A Top-Down Approach (7th Edi…
Computer Engineering
ISBN:
9780133594140
Author:
James Kurose, Keith Ross
Publisher:
PEARSON
Computer Organization and Design MIPS Edition, Fi…
Computer Organization and Design MIPS Edition, Fi…
Computer Engineering
ISBN:
9780124077263
Author:
David A. Patterson, John L. Hennessy
Publisher:
Elsevier Science
Network+ Guide to Networks (MindTap Course List)
Network+ Guide to Networks (MindTap Course List)
Computer Engineering
ISBN:
9781337569330
Author:
Jill West, Tamara Dean, Jean Andrews
Publisher:
Cengage Learning
Concepts of Database Management
Concepts of Database Management
Computer Engineering
ISBN:
9781337093422
Author:
Joy L. Starks, Philip J. Pratt, Mary Z. Last
Publisher:
Cengage Learning
Prelude to Programming
Prelude to Programming
Computer Engineering
ISBN:
9780133750423
Author:
VENIT, Stewart
Publisher:
Pearson Education
Sc Business Data Communications and Networking, T…
Sc Business Data Communications and Networking, T…
Computer Engineering
ISBN:
9781119368830
Author:
FITZGERALD
Publisher:
WILEY