1. The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 130 hours of drilling time may be used. Each air conditioner sold yields a profit of $15. Each heater assembled may be sold for a $19 profit. 200 160- 120- The aim of the objective function for Attaran Corporation should be to (1) value, the objective 80- Decision variables: X = number of air conditioners to be produced Y= number of heaters to be produced 40- Objective function: Z = 0- Subject to: 60 80 100 120 140 160 180 200 20 40 X 3X +2Y (2) 2X + 1Y (3) X, Y 20 On the graph on right, constraints C, and C, have been drawn. Using the point drawing tool, plot all the corner points for the feasible area. The optimum solution is: X = (round your response to two decimal places). Y = (round your response to two decimal places). Optimal solution value Z = (round your response to two decimal places). (1) O Minimize O Maximize (2) O (3) O
1. The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 130 hours of drilling time may be used. Each air conditioner sold yields a profit of $15. Each heater assembled may be sold for a $19 profit. 200 160- 120- The aim of the objective function for Attaran Corporation should be to (1) value, the objective 80- Decision variables: X = number of air conditioners to be produced Y= number of heaters to be produced 40- Objective function: Z = 0- Subject to: 60 80 100 120 140 160 180 200 20 40 X 3X +2Y (2) 2X + 1Y (3) X, Y 20 On the graph on right, constraints C, and C, have been drawn. Using the point drawing tool, plot all the corner points for the feasible area. The optimum solution is: X = (round your response to two decimal places). Y = (round your response to two decimal places). Optimal solution value Z = (round your response to two decimal places). (1) O Minimize O Maximize (2) O (3) O
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question

Transcribed Image Text:1. The Attaran Corporation manufactures two electrical
products: portable air conditioners and portable heaters. The assembly process for each is similar in that
both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2
hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next
production period, 240 hours of wiring time are available and up to 130 hours of drilling time may be
used. Each air conditioner sold yields a profit of $15. Each heater assembled may be sold for a $19
profit.
200-
160-
120-
The aim of the objective function for Attaran Corporation should be to (1)
the objective
value.
80-
Decision variables:
X = number of air conditioners to be produced
Y = number of heaters to be produced
40-
Objective function:
Z=
X+
Y
0-
Subject to:
20
40
60
80
100 120 140 160 180 200
3X + 2Y
(2)
2X + 1Y
(3)
X, Y 20
On the graph on right, constraints C, and C, have been drawn.
Using the point drawing tool, plot all the corner points for the feasible area.
The optimum solution is:
X =
(round your response to two decimal places).
Y =
(round your response to two decimal places).
Optimal solution value Z =
(round your response to two decimal places).
(1) O Minimize
O Maximize
(2)
AI VI
AI VI
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 1 images

Recommended textbooks for you

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education


Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning

Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.