1. For the rectangular beam shown here, calculate the development lengths of top No. 7 bars and bottom No. 9 bars. No. 4 bars are used for stirrups. The spacing of stirrups is 6 in. The clear side cover depth is 1.5 4 No. 9 (No. 29) inch. (Clear cover depth means the distance from the beam face to the outer surface of a bar). Normalweight concrete is used. 2 No. 7 (No. 22) 14 Equation (6.5) and (6.6) will be used respectively. And the results shall be compared. 20"
1. For the rectangular beam shown here, calculate the development lengths of top No. 7 bars and bottom No. 9 bars. No. 4 bars are used for stirrups. The spacing of stirrups is 6 in. The clear side cover depth is 1.5 4 No. 9 (No. 29) inch. (Clear cover depth means the distance from the beam face to the outer surface of a bar). Normalweight concrete is used. 2 No. 7 (No. 22) 14 Equation (6.5) and (6.6) will be used respectively. And the results shall be compared. 20"
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
For the rectangular beam shown here, calculate the development lengths of top No. 7 bars and bottom No. 9 bars. No. 4 bars are used for stirrups. The spacing of stirrups is 6 in. The clear side cover depth is 1.5 inch. (Clear cover depth means the distance from the beam face to the outer surface of a bar).
Normalweight concrete is used.
, .
Equation (6.5) and (6.6) will be used respectively. And the results shall be compared.

Transcribed Image Text:1. For the rectangular beam shown here, calculate the development lengths of top No. 7 bars and bottom No. 9 bars. No. 4 bars are used for stirrups. The spacing of stirrups is 6 in. The clear side cover depth is 1.5 inch. (Clear cover depth means the distance from the beam face to the outer surface of a bar).
Normal weight concrete is used.
Therefore, Equation (6.5) and (6.6) will be used respectively. And the results shall be compared.
**Diagram Explanation:**
The diagram shows a cross-section of a rectangular concrete beam with dimensions labeled.
- **Top Reinforcement:** 2 No. 7 bars (indicated as No. 22, typically referring to a specific diameter or type of bar).
- **Bottom Reinforcement:** 4 No. 9 bars (indicated as No. 29).
- **Stirrups:** No. 4 bars are used, placed around the perimeter of the reinforcement.
The beam's dimensions are:
- Width: 10 inches
- Total height: 20 inches
- Height from the bottom to the top reinforcement: 14 3/4 inches
The diagram also shows the following additional measurements:
- A side cover of 2 1/2 inches on both left and right sides.
- Center-line spacing around the reinforcement and stirrups.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 3 images

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning