1. create at least a 2 level (levels 0, 1, & 2) WBS that defines the work that must be done from beginning to end. From getting the requirements for what computers to buy to installing them (with the required software) and making sure they work for the first day of class. 2. Use the WBS structure format depicted in figure 5-2a where Level 0 would be “harvard LAB COMPUTER UPGRADE PROJECT”
You have been selected to plan a project to upgrade the computers in harvard computer Lab. As part of that plan you need to create a WBS to define the scope of work.
1. create at least a 2 level (levels 0, 1, & 2) WBS that defines the work that must be done from beginning to end. From getting the requirements for what computers to buy to installing them (with the required software) and making sure they work for the first day of class.
2. Use the WBS structure format depicted in figure 5-2a where Level 0 would be “harvard LAB COMPUTER UPGRADE PROJECT”.
In this WBS project of Harvard Computer Lab starts from the internal design and check as whether all the external functions are working fine or not and solve if there is an issue. When it comes to system check then it first analyze the damage system and the required change in the computer system and its parts. proceed with their changes as it comes under Level 2. Final procedure is to check system compatibility and the required updates. Finally check whether all the system are working fine or not. Please see the below picture for reference.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images