(1) Find an optimal assignment of trucks to routes to minimize the total cost (using the Hungarian Method). A B C 10 6 12 15 10 11 7 16 9 Truck / Route 1 2 3 4 11 9 14 Step la: Row subtraction (show your steps, e.g., see cell 1A) Truck / Route A B с D 8 14 10 13 D
(1) Find an optimal assignment of trucks to routes to minimize the total cost (using the Hungarian Method). A B C 10 6 12 15 10 11 7 16 9 Truck / Route 1 2 3 4 11 9 14 Step la: Row subtraction (show your steps, e.g., see cell 1A) Truck / Route A B с D 8 14 10 13 D
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
I need the explanation of how this answer was reached.

Transcribed Image Text:**Assignment of Trucks to Routes Using the Hungarian Method**
This exercise involves finding the optimal assignment of trucks to routes to minimize total costs. Follow the Hungarian Method step by step:
**Initial Cost Matrix:**
| Truck/Route | A | B | C | D |
|-------------|----|----|----|----|
| 1 | 10 | 6 | 12 | 8 |
| 2 | 11 | 15 | 10 | 14 |
| 3 | 9 | 12 | 7 | 10 |
| 4 | 14 | 16 | 9 | 13 |
### Step 1a: Row Subtraction
- Subtract the smallest entry in each row from all entries in that row.
- Example: For Truck 1, \(10 - 6 = 4\).
| Truck/Route | A | B | C | D |
|-------------|----|----|----|----|
| 1 | 4 | | | |
| 2 | | | | |
| 3 | | | | |
| 4 | | | | |
### Step 1b: Column Subtraction
- Subtract the smallest entry in each column from all entries in that column.
| Truck/Route | A | B | C | D |
|-------------|----|----|----|----|
| 1 | | | | |
| 2 | | | | |
| 3 | | | | |
| 4 | | | | |
### Step 2: Testing for Optimal Solution
- Draw the minimum number of lines needed to cover all zeros.
Minimum lines required: _____
### Step 3: Revise the Opportunity Cost Table
- Adjust the matrix based on the uncovered numbers.
| Truck/Route | A | B | C | D |
|-------------|----|----|----|----|
| 1 | | | | |
| 2 | | | | |
| 3 | | | | |
| 4 | |
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 3 images

Recommended textbooks for you

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education


Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning

Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.