HW. 1

pdf

School

Oklahoma State University *

*We aren’t endorsed by this school

Course

313

Subject

Mechanical Engineering

Date

Feb 20, 2024

Type

pdf

Pages

1

Uploaded by DeanMonkey17099

Report
Assignment # 1 PETE 4313 Drilling and Well Completions Name: __________________________ Overview of the drilling process and rig systems Due: Feb 1, 05:00 pm | worth 45 points Include additional worksheets with calculations for partial credits in the event your final answer is not correct. 1. A drill string of 5200 ft has 4500 ft of drill pipe with a weight of 25 lb/ft and 700 ft of drill collar with a weight of 99.5 lb/ft. What is the total weight of the drill string? 2. Calculate the load on the static fast line for a drill string (in an empty hole) given in question 1. The traveling block and the hook weigh 32,000lb. The block has 8 threads, and the sheave efficiency is 0.97. 3. For the same information as in questions 1 and 2. Calculate the load in the deadline. 4. For the same information as above, what is the load in the dynamic fast line? 5. The nominal strength of the 1 1/8" drilling line on the rig is 130,000lb. With a safety factor of 3.5 is the drilling line sufficient for the drill string in question 2? 6. Calculate the static weight on the derrick. 7. What will be the derrick load during lifting and lowering the drillstring? 8. What is the hoisting horsepower needed to lift the drill string in Q1 with a hook velocity of 115 ft/min? 9. Calculate the substructure load for the well in questions 1 and 2 (Assume the setback load to be 25000 lb).
Discover more documents: Sign up today!
Unlock a world of knowledge! Explore tailored content for a richer learning experience. Here's what you'll get:
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help