Quality%20Assingment%20question%201%20%26%202 - Copy

docx

School

Confederation College *

*We aren’t endorsed by this school

Course

MISC

Subject

Information Systems

Date

Apr 3, 2024

Type

docx

Pages

3

Uploaded by ProfEaglePerson1083

Report
1 Assignment: 1 Prakash Dhamala IP - 211 - Quality, Strategy, and Value Creation Professor: Marc Oppedisano March 29, 2023
Operator Load Part into Fixture Incoming raw Material Operator Receives Part Operator Pumps press out Carry Out Stamping process Forklift delivers Part to Process Remove finish part from the press Loading part onto pin check fixture Do rework or Scrap Moving materials into Finished goods Inventory Deliver Finished Part Contact Forklift driver for Pickup 2 1. Create a process map showing the manufacturing process from the incoming raw material (wip) to the completed part leaving the process. Press Process Mapping Yes No No Satisfy No Quality Standard Yes Material check Pass Return to Supplier Store in Warehouse duck
3 2) Create a “5 Why Analysis” to determine the provided root cause of an issue causing the middle hole of the bracket to be out of hole size tolerance: a) Why analysis: Why is the middle hole of the bracket out of hole size tolerance? The middle hole of the bracket is out of tolerance because die punch did not create a hole within the required size tolerance. Why is the hole too large? The hole is too large because the die punch material was too soft. Why is the die punch material too soft? The die punch material is too soft because the material was not as per standard. Why did the supplier provide the wrong material? The supplier provided the wrong material because the purchase order specified the wrong material grade. Why did the purchase order specify the incorrect material? The purchase order specified the incorrect material due to a miscommunication between the purchasing and engineering departments. b. Appropriate Corrective action to the tooling : Material which is as per standard needs to be substituted for the die punch material. Thus, die punch will produce holes that are within the required size tolerance. c. Appropriate corrective action to the process : Develop a quality control procedure that guarantees accurate specification of materials in purchase orders, while also ensuring that there is effective communication between the purchasing and engineering departments. 3) Checklist for the equipment has been presented in excel in the next file.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help