ICTNWK612 Assessment 2 (Word Version)Assessment 2 (1)
docx
keyboard_arrow_up
School
Albright Institute of Business and Language *
*We aren’t endorsed by this school
Course
MISC
Subject
Information Systems
Date
Feb 20, 2024
Type
docx
Pages
11
Uploaded by ElderMaskSkunk36
Assessment 2 – Coversheet
Students: Please fill out this cover sheet clearly and accurately. Make sure you have kept a copy
of your work.
Student and Submission Details
Student Name
Tanvirul Islam Student ID
AIBL212935
Unit Code and Name
ICTNWK612 - Plan and manage troubleshooting advanced integrated IP networks
Date of submission
00/00/0000
STUDENT DECLARATION
I declare that •
This assessment is my own work. •
None of this work has been completed by any other person.
•
I have not cheated or plagiarized the work or colluded with any other student/s. •
I have correctly referenced all resources and reference texts throughout these assessment tasks.
•
I understand that if I am found to be in breach of policy, disciplinary action may be taken against me.
Student Signature:
Assessor to complete
Assessment 2
Assessment Result
Date
Type Of Submission
Assessment 2 (Workplace project)
□
C (Competent) □
NYC (Not Yet Competent) □
DNS (Did Not Submit)
00/00/0000
First submission
First re-submission
Second re-submission
Assessor feedback
Assessor Name
Assessor Signature:
Assessment 2 – Workplace assessment
Pre-assessment checklist
Purpose The pre-assessment checklist helps students determine if they are ready for assessment. The
Trainer/Assessor must review the checklist with the student before the student attempts the
assessment task. If any items of the checklist are incomplete or not clear to the student, the
Trainer/Assessor must provide relevant information to the student to ensure they understand
the requirements of the assessment task. The student must ensure they are ready for the
assessment task before undertaking it.
Information for students •
Please make sure you have completed the necessary prior learning before attempting
this assessment. •
Please make sure your Trainer/Assessor has clearly explained the assessment process
and tasks to be completed. •
Please make sure you understand what evidence is required to be collected and how. •
Please make sure you know your rights and the complaints and appeal process. •
Please make sure you discuss any special needs or reasonable adjustments to be
considered during the assessment (refer to the Reasonable Adjustments Strategy
Matrix and negotiate these with your Trainer/Assessor). •
Please make sure that you have access to a computer and the internet (if you prefer to
type the answers).
•
Please ensure that you have all the required resources needed to complete this Unit
Assessment Task (UAT). •
Due date of this assessment task is according to your timetable. •
In exceptional (compelling and compassionate) circumstances, an extension to submit
an assessment can be granted by the Trainer/Assessor. •
Evidence of the compelling and compassionate circumstances must be provided
together with your request for an extension to submit your assessment work. •
Request for an extension to submit your assessment work must be made before the
due date of this assessment task.
Reasonable adjustments If a student requires a reasonable adjustment, then complete the reasonable adjustment form
included in the unit information pack. Student declaration I confirm that the Trainer/Assessor has provided all the information related to the assessment
task as included in the information for student section and I am ready for the assessment. Student
signature Date
Assessment task instructions
Assessment type:
Unit Project Instructions provided to the student:
Assessment task description: This is the second (2) unit assessment task that student must successfully complete to be
deemed competent in this unit of competency. The student is required to complete the following sections from the recommended template. Activity 1: Develop a Troubleshooting and Monitoring Plan
Activity 2: Implement Troubleshooting and Monitoring Plan Information for students
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
You are required to prepare a proposal for the provision of services to a case study organisation. You will then meet with the prospective client to discuss your proposal and reach agreement on this.
You are required to assess the progress of the project, providing recommendations to resolve issues that have arisen. You will then modify your proposal to reflect any new agreements that have been made.
This assessment is to be completed in the simulated work environment in the RTO.
You will need access to:
•
a suitable place to complete activities that replicates a business environment including a meeting space and computer and internet access. •
your learning resources and other information for reference •
Project Portfolio template
•
Simulation Pack.
Ensure that you:
•
review the advice to students regarding responding to written tasks in the IT Works Student User Guide
•
comply with the due date for assessment which your assessor will provide
•
adhere with your RTO’s submission guidelines
•
answer all questions completely and correctly •
submit work which is original and, where necessary, properly referenced
•
submit a completed cover sheet with your work
•
avoid sharing your answers with other students.
Assessment information
Information about how you should complete this assessment can be found in Appendix A of the IT Works Student User Guide
.
Refer to the appendix for information on:
•
where this task should be completed
•
how your assessment should be submitted.
Note
: You must complete and submit an assessment cover sheet with your work. A template is provided in Appendix B of the Student User Guide. However, if your RTO has provided you with an assessment cover sheet, please ensure that you use that.
Assessment Task 2: IP Networks Project
Task summary You are required to plan, manage and implement troubleshooting and monitoring strategies to ensure the ongoing performance and reliability of the network of your RTO. This assessment is to be completed in the simulated work environment in the RTO.
Required
•
Access to textbooks and other learning materials
•
Computer with Microsoft Office and internet access
•
A network (LAN and WAN that includes voice and voice hardware and software)
•
Simulated network software
•
Network testing and monitoring tools
Timing
Your assessor will advise you of the due date of these submissions.
Submit
•
Troubleshooting and Monitoring Plan
•
Test Report and screenshots of tests conducted.
Assessment criteria
For your performance to be deemed satisfactory in this assessment task, you must satisfactorily address
all of the assessment criteria. If part of this task is not satisfactorily completed, you will be asked to
complete further assessment to demonstrate competence.
Resubmission opportunities
You will be provided feedback on your performance by the assessor. The feedback will indicate if you
have satisfactorily addressed the requirements of each part of this task. If any parts of the task are not satisfactorily completed, the assessor will explain why, and provide you
with written feedback along with guidance on what you must undertake to demonstrate satisfactory
performance. Reassessment attempt(s) will be arranged at a later time and date. You have the right to appeal the outcome of assessment decisions if you feel that you have been dealt
with unfairly or have other appropriate grounds for an appeal.
You are encouraged to consult with the assessor prior to attempting this task if you do not understand any
part of this task or if you have any learning issues or needs that may hinder you when attempting any part
of the assessment. Assessment Task 2 Instructions as provided to students.
Complete the following activities:
•
Carefully read the following scenario
You are to assume for the purpose of this assessment have been asked to plan, manage and implement troubleshooting and monitoring strategies to ensure the ongoing performance and reliability of the network of your RTO.
Your assessor will provide you with details of your RTO network in a network diagram. •
Develop a Troubleshooting and Monitoring Plan.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Based on the RTO’s network as per the information you have been provided by your assessor, you are required to develop a Troubleshooting and Monitoring Plan so as to ensure the network is performing effectively and reliably at all times.
Use Troubleshooting and Monitoring Plan Template to document your work. Your plan should include: •
An introduction regarding the purpose of the plan.
•
A description of each segment in the IP network and how each will be isolated for testing and troubleshooting.
•
The frequency and types of testing of the network infrastructure and associated components that should be undertaken and why. •
A list and description of network testing and monitoring tools (including software applications) that will be used and why.
•
IOS device maintenance plan that can be followed for monitoring routing protocols and router configurations.
•
A plan for troubleshooting and monitoring the security of the network.
•
A plan for troubleshooting and monitoring IP V6 and IP V4 interoperability.
Submit your Troubleshooting and Monitoring Plan Template to your Assessor. •
•
Implement Troubleshooting and Monitoring Plan.
Assume that you have been given the go ahead to complete the troubleshooting and monitoring of the network as per your Plan. Set up the network in your network simulated software and then complete all of the tests documented below. You should also ensure that you isolate sub-optimal internetwork operations at the relevant open systems interconnection (OSI) model layer. Explain how you did this in your test report. Tests include:
•
Test switch to switch connectivity.
•
Test access ports and loop prevention for the VLAN
•
Test switch virtual interfaces.
•
Test switch support of advance services
•
Troubleshoot switch configuration.
•
As you complete each of the tests take a screenshot of the tests and the results that show that you have ensured that the network is performing reliably and effectively. Submit the screenshots to your assessor along with a brief report of all the tests you completed and their outcomes. Use Test Report Template to guide your work. Make sure you clearly label each screenshot so that your assessor can identify which screenshot is relevant to which test (you will also need to include this in your report).
•
Discuss at least one change that you consider would be useful for monitoring and managing troubleshooting based on the results of the test. Include this in your report. The basic instructions/templates for the following activities are shared
as follows-
Activity 1: Develop a Troubleshooting and Monitoring Plan
Activity 2: Implement Troubleshooting and Monitoring Plan Activity 1: Troubleshooti ng and Monitoring Plan
Introduction The company has five rooms that is connected via 6 switches and 2 firewalls that goes through modem and router.
Isolation of segments
Include a description of each segment in the IP network and how each will be isolated for testing and troubleshooting.
Testing
Outline the frequency and types of testing of the network infrastructure and associated components that should be undertaken and why. Network testing and monitoring tools
Include a list and description of network testing and monitoring tools (including software applications) that will be used and why.
IOS device maintenance plan
Outline an IOS device maintenance plan that can be followed for monitoring routing protocols and router configurations.
Security
Outline a plan for troubleshooting and monitoring the security of the network.
IP V6 and IP V4 interoperability
Outline a plan for troubleshooting and monitoring IP V6 and IP V4 interoperability.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Activity 2: Test Report Template
Isolation of sub-optimal internetwork operations Explain how you isolated sub-optimal internetwork operations at the relevant open systems interconnection (OSI) model layer. Identify the relevant screenshot to review.
Test switch to switch connectivity
Summarise the tests you undertook and the results. Identify the relevant screenshot to review. Test access ports and loop prevention for the VLAN
Summarise the tests you undertook and the results. Identify the relevant screenshot to review.
Test switch virtual interfaces.
Summarise the tests you undertook and the results. Identify the relevant screenshot to review.
Test switch support of advance services
Summarise the tests you undertook and the results. Identify the relevant screenshot to review.
Troubleshoot switch configuration.
Summarise the tests you undertook and the results. Identify the relevant screenshot to review.
Changes required
•
Discuss at least one change that would be useful for monitoring and managing troubleshooting based on the results of the test.