9/1/22, 2:24 PM
Unit 6 - Create Risks and Mitigation Measures for a Project Scenario
https://harrisburgu.instructure.com/courses/8908/assignments/177742?module_item_id=615454
2/2
Total Points: 100
Criteria
Ratings
Pts
25 pts 25 pts 30 pts 20 pts Completion
A total of three risks have been identified. The
risks are relevant to the project scenario.
25 pts
Full
points
18.75 pts
3 points
12.5 pts
2 points
6.25 pts
1 point
0 pts
No
points
Relevance
A risk category has been identified for each
risk. The category is relevant to the risk.
25 pts
Full
points
18.75 pts
3 points
12.5 pts
2 points
6.25 pts
1 point
0 pts
No
points
Mitigation
At least one risk mitigation measure has been
identified for each risk. The mitigation strategy
presented is logical, clearly described, and is
relevant to the risk presented.
30 pts
Full
points
22.5 pts
7.5
points
15 pts
5
points
7.5 pts
2.5
points
0 pts
No
points
Spelling & Grammar
The text is grammatically correct and there are
no spelling or punctuation errors.
20 pts
Full points
10 pts
1 point
0 pts
No points