LGMT 420 Module 8 Quiz
pdf
keyboard_arrow_up
School
Embry-Riddle Aeronautical University *
*We aren’t endorsed by this school
Course
420
Subject
Industrial Engineering
Date
Jan 9, 2024
Type
Pages
3
Uploaded by cmckee82
10/1/23, 10:09 AM
8.4 - Quiz: Short-Term Scheduling and Lean Operations: LGMT 420 Mgmnt of Production & Oprtns - Aug 2023 - Online
https://erau.instructure.com/courses/161958/quizzes/554099
1/3
Due
Oct 1 at 10:59pm
Points
100
Questions
5
Available
Aug 7 at 12am - Oct 7 at 11:59pm
Time Limit
20 Minutes
Instructions
Attempt History
Attempt
Time
Score
LATEST
Attempt 1
5 minutes
100 out of 100
8.4
Short-Term Scheduling and Lean Operations
Quiz
In this module, we have covered short-term scheduling and
lean operations. This quiz will cover lean processes and near
or short term scheduling of production operations.
Quiz Details:
In this 5-question quiz, you will be tested on the
lean methods that can be used in production operations.
Time limit:
There is a 20-minute time limit, and at the end of
the 20 minutes, the quiz will close and be automatically
submitted for grading. You will get a notification pop-up approximately 10 seconds before time
expires. If you leave the quiz for any reason, the timer will continue, and the quiz will automatically
submit when time is up. If you lose your Internet connection, you may reconnect and return to the
quiz where you left off as long as time has not expired. If you encounter technical difficulties, please
contact your instructor.
Grading:
This quiz is automatically graded so you will see your score right away. Please contact
your instructor if you have any questions.
This activity supports
Module Objective 3, and Learning Outcome 5.
(https://erau.instructure.com/courses/161958/pages/module-8-overview-and-objectives)
10/1/23, 10:09 AM
8.4 - Quiz: Short-Term Scheduling and Lean Operations: LGMT 420 Mgmnt of Production & Oprtns - Aug 2023 - Online
https://erau.instructure.com/courses/161958/quizzes/554099
2/3
Correct answers are hidden.
Score for this quiz:
100
out of 100
Submitted Oct 1 at 10:09am
This attempt took 5 minutes.
20 / 20 pts
Question 1
In a Kanban system containers are typically very large, enough to support
the production line for long periods of time to ensure that no stock out
occurs which could shut down the production line.
True
False
20 / 20 pts
Question 2
Lean operations can be defined as giving the customer exactly what they
want, when they want it and without waste.
True
False
20 / 20 pts
Question 3
The three fundamental issues with lean operations are to eliminate waste,
add variability, and improve throughput.
10/1/23, 10:09 AM
8.4 - Quiz: Short-Term Scheduling and Lean Operations: LGMT 420 Mgmnt of Production & Oprtns - Aug 2023 - Online
https://erau.instructure.com/courses/161958/quizzes/554099
3/3
True
False
20 / 20 pts
Question 4
High levels of inventory hide problems within a production system. Some of
the problems that high inventory hide are quality problems, process
downtime, scrap, and late deliveries.
True
False
20 / 20 pts
Question 5
Kanban systems use many different size containers to ensure that every
part has the exact size container.
True
False
Quiz Score:
100
out of 100
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help