SC Quiz #3
docx
keyboard_arrow_up
School
Rutgers University *
*We aren’t endorsed by this school
Course
799:301
Subject
Industrial Engineering
Date
Dec 6, 2023
Type
docx
Pages
2
Uploaded by BrigadierStraw27455
Jack Poliviou
Intro to Supply Chain Management
10/2/23
Quiz #3
1 The goal of supply chain planning is to balance supply and demand in a way that realizes the
financial and service objectives of the company.
A. True
B. False
2 Material Requirement Planning is the system intended to develop long-range plans (more
than a year away) concerning product families manufactured by the organization.
A. True
B. False
3 The three basic production strategies for addressing the aggregate planning problem are the
chase production strategy, the level production strategy, and the mixed production strategy.
A. True
B. False
4 The Chase Production Strategy relies on a constant output rate and capacity while varying
inventory and backlog levels to handle the fluctuating demand pattern.
A. True
B. False
5 Master Production Scheduling is a process that brings all the demand and supply plans for the
business (sales, marketing, development, production, sourcing, and finance) together to provide
management with the ability to strategically direct the business to achieve a competitive
advantage
A. True
B. False
6 Which of the following is an engineering document that shows an inclusive listing of all the
component parts and assemblies making up the final product?
A. Master Production Schedule
B. Bill of Materials
C. Distribution Requirement Plan
D. Resource Requirement Plan
7 The medium-range capacity planning technique used to check the feasibility of the Master
Production Schedule (MPS) is called?
A. Resource Requirement Planning (RRP)
B. Rough-cut Capacity Planning (RCCP)
C. Capacity Requirement Planning (CRP)
D. None of the above
8 Which of the following MRP terms represents a committed order awaiting delivery for a
specific period?
A. Projected on-hand inventory
B. Time bucket
C. Net requirement
D. Scheduled receipt
9 Organizations that choose to implement one single system with all of the desired applications
from a single vendor is said to have chosen a?
A. Best-of-breed solution
B. Elite integrator solution
C. Single integrator solution
D. Premier application solution
10 The process of converting a parent item’s planned order releases into component gross
requirements is called?
A. Lot Sizing
B. MRP Explosion
C. Bill of Materials
D. Pegging