CMGT 3311: Construction Estimating
SAMPLE EXAM (20%)
Dr. Zain Al-Houri
Fall 2023
Page
1
of
4
Name: _____________________
This is a CLOSED BOOK, CLOSED NOTES exam; Be neat and organized in your work; your
answers should be clear.
QUESTION #
GRADE
Q.1 (3 pts.)
Q.2 (6 pts.)
Q.3 (11 pts.)
Total (20 pts.)
CMGT 3311: Construction Estimating
SAMPLE EXAM (20%)
Dr. Zain Al-Houri
Fall 2023
Page
2
of
4
Question 1. True or False (Select one correct answer)
1.
(
1 pt.
)
TRUE
or
FALSE
.
The price included in the design-build contractor’s proposal
will have to come from a detailed estimate.
2.
(
1 pt.
)
TRUE
or
FALSE
.
A Rough order of magnitude (ROM) estimate are often based
upon a cost per primary unit for the facility.
3.
(
1 pt.
)
TRUE
or
FALSE
. Fixed cost
contracts are based on a pricing schedule that consists
of a breakdown of the work and estimated quantities for each of the items on the
breakdown.
Question 2. Choose the Correct Answer (Select one answer!) (2 pts. each
)
1.
Sheet piling is measured in _____.
a.
square feet
b.
cubic feet
c.
cubic meters
d.
square yards
2.
Soils ________as they are compacted.
a.
often decrease in volume
b.
becomes less dense.
c.
often increase in volume
d.
becomes more wet.
3.
Private owners often directly invite contractors to bid on their construction projects in a
system known as a(n) ____ system.
a.
open bid
b.
limited bid
c.
blind bid
d.
closed bid
CMGT 3311: Construction Estimating
SAMPLE EXAM (20%)
Dr. Zain Al-Houri
Fall 2023
Page
3
of
4
Question 3 (11 pts.)
Answer of each of the following questions (Show your calculation)
a)
Convert the following units. (2 pts)
I.
Convert 12’ 5’’
to ____________ ft
II.
Convert 734 mm to ____________m
b)
Calculate the perimeter and the area of the circle with the following dimensions. (2 pts)
c)
Calculate the centerline perimeter in both US and metric units from the wall plan shown
below. Show The full calculation. (2 pts)
d)
Complete a takeoff of the pit and backfilling work required for the structure shown in the
Figure below. (5 pts)
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
CMGT 3311: Construction Estimating
SAMPLE EXAM (20%)
Dr. Zain Al-Houri
Fall 2023
Page
4
of
4