ENG305 Safety , Risk and Reliability
Assignment 4 :
Risk Assessment Report (Environment, Fire,
Explosion )
Background
In assignment 3, you let your imagination roam to ask as many relevant questions as you could in
order to be ahead of the game and formulate good planning which optimized safety and minimized
risks and hazards. In this assignment you will go on to the next stage and do a ‘Risk Assessment’ (RA)
report about
the solar power system manufacturing
plant
and operation situation. Please now
consider a prioritized range of operational hazards (ranked in your own order of importance)
together with any environmental, fire and explosion hazards and do a risk analysis on them.
Please make use of some of the appropriate questions you posed in assignment 3 to complete this
assignment. You must include a consideration of environment, fire and explosion hazards.
At this
stage you do not need to introduce control measures, you just need to identify and categorize risk.
We will move on to control measures and applications in assignment 5.
In this report you will identify various hazards and then discuss how and why you have given each
one a certain probability and then a consideration of consequences, to come up with a risk value.
The key to this assignment is the practice in evaluating the probabilities and consequences (now that
you have some practice in asking the right questions). Please use the posted material to help give
you some consistency across probability and consequence judgements and in keeping with industry
conventions.
Report
You need to create a report in technical report format of approx. 3,000 words together with an
appendix containing your risk analysis. Please use the conventional RA layout in a spreadsheet to
show your understanding of this technique. You may do them as either separate analyses or combine
them into one. Please make use of the material posted on learnline at weeks 6 and 7 as well as your
own research. Please use your prior work in assignment 3 to identify possible hazards.
Refer to the marking rubric for report structure and expectation to be met.