HW_Turkey Earthquake-jrh
docx
keyboard_arrow_up
School
Temple University *
*We aren’t endorsed by this school
Course
0836
Subject
Electrical Engineering
Date
Apr 3, 2024
Type
docx
Pages
4
Uploaded by DukeScorpion1501
EES 0836
Earthquakes on the North Anatolian Fault System
Disasters: Geology vs. Hollywood
Introduction
You are part of a team of scientists sent by the United States Geological Survey (USGS) to Turkey to investigate the hazard of earthquakes along the North Anatolian Fault System (NAF). As a geoscientist, your goal is to address key questions, including:
●
Where do earthquakes occur?
●
Is there some information we could use to forecast the location of the next event? ●
What should we be planning for next?
Learning Objectives
●
Analyze past events to forecast where future events occur. (1, 2, 5, a, b, c)
●
Identify locations where city planners should prepare for future earthquakes. (1, 2, 5, a)
Part 1: Forecasting earthquakes
We know where plate boundaries are, and we know that earthquakes occur at these boundaries. However, our ability to forecast when they will occur has remained a challenge for geologists.
1.
What are some methods for forecasting earthquakes?
- When understanding the probability of the next quake some Prediction methods would be foreshocks or ground deformation
2.
Of the methods you listed, what do you think is the most promising method to use in the future? Explain your thinking.
EES 0836
Part 2
: The data
People have lived in Turkey for millennia with a rich set of historical writings and records of events. These historical accounts of disasters, and in some cases, the actual destruction of towns leading to refugee migrations, provide an unusually long record of earthquake occurrence. In this part of the activity,
we will be plotting the amount of fault slip from events throughout the 1900s and trying to forecast the location of future events.
Just looking at the data included, it is difficult to see if there is any information to glean from it. To help us organize the data, we will be plotting the events from the data set into a format that would help us visualize the information more effectively. Data Set 1: Date (years)
Position (km) parallel to fault
Data source/type
1967
-410 / -330
Historical Account + Geo mapping
1957
-335 / -305
Historical Account + Geo mapping
1951
-195 / -130
Historical Account + Geo mapping
1944
-305 / -130
Historical Account + Geo mapping
1943
-130 / 140
Historical Account + Geo mapping
1942
155 / 185
Historical Account + Geo mapping
1939
95 / 440
Historical Account + Geo mapping
How to Plot: Referring to Data Set 1, the column on the left shows the years, and the middle column contains the movements during that particular earthquake. On the provided table on the next page, plot these coordinates along with their years. Accuracy matters, but don’t worry too much about precision. The information, once plotted, should be clear enough. Just make sure you work in pencil in case you need to erase. ●
Locate the approximate year on the Y-axis.
●
Then put a dot where the left coordinate is located and another where the right coordinate is located. ●
Connect the dots for that event. ●
1967’s earthquake is completed for you.
●
After plotting the data, answer the following questions.
EES 0836
Questions: 1.
How often do earthquakes occur in the same location? - There are some that overlap but they are not common
2.
Can you forecast where the next earthquake will occur?
- We can predict it but we definitely can estimate it generally the highest probability of the next earthquake in a certain location
3.
Explain why. If you can identify a possible location for this event, where do you forecast it will occur?
- Propagation of the fault is to the northwest, so we could anticipate the next quake will be in that area w/a a high probability near Izmit.
4.
How would you explain to the people living in the area you identified that they need to be earthquake-ready?
-I would have to explain the hazards and the risks and educate them on how to be prepared.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
EES 0836
Part 3
: Oh, wait, there is one more event... You might have noticed that the most recent earthquake from the table was over 50 years ago. Let’s look at one of those events. Plot this event on the same table as Part 2. Date (years)
Position (km) parallel to fault
Data source/type
1999
-460 / -280
Historical Account + Geo mapping
Questions:
1.
Did this event fit into your forecast from Part 2? Explain how. -Yes, it followed the trend to the northwest 2.
Using this new information, can you forecast where the next earthquake will occur?
-Probably to the northwest of Izmit, since it is propagating in that direction.
3.
At which point did you think you had enough data to make this forecast? Explain your thinking.
-8 events followed this trend
4.
If you were a government official tasked with public safety, what steps might you suggest to the people living in Istanbul? -Prepare, Educate, and warn them
5.
Explain how this pattern makes sense in terms of plate tectonics theory. -This is when a transform fault- so the motion is lateral and moving along the fault- in his case east to west to be exact
Related Documents
Related Questions
Ans:32.4 kV I have the solution but didnt understand.Kindly explain the solution.
arrow_forward
A synchronous generator is feeding its rated power of 250 MW to a large 60 Hz network over a double circuit transmission The maximum steady state power that can be transmitted over the line with both circuits in service is 500 MW and is 350 MW with any one out of service.
A solid three-phase fault occurring at the network-end of one of the lines causes it to trip. If inertia constant is H = 3.5 s, calculate the critical clearing angle and critical clearing time in which the circuit breakers must trip so that synchronism is preserved.
arrow_forward
A generator feeds power to an infinite bus through a double circuit transmission line. A3 phase fault
occurs at the middle point of one of the lines. The infinite bus voltage is 1 pu, the transient internal
voltage of the generator is 1.1 pu and the equivalent transfer admittance during fault is 0.8 pu. The
100 MVA generator has an inertia constant of 5MJ/MVA and it was delivering 1.0 pu power prior of
the fault with rotor power angle of 30 °. The system frequency is 50 Hz.
The initial accelerating power (in pu) will be
arrow_forward
Explain this diagram
arrow_forward
Maps
ework Part II
0/1
An article in The Journal of Data Science ["A Statistical Analysis of Well Failures in Baltimore County" (2009, Vol. 7, pp. 111-127)]
provided the following table of well failures for different geological formation groups in Baltimore County.
Question 3 of 3
H
یہ
arrow_forward
30. In the circuit of Figure P28.30, determine (a) the cur-
W rent in each resistor and (b) the potential difference
across the 200-2 resistor.
+
40.0 V
360 V
80.0 V
+
200 Ω
80.0 Ω
20.02.
Figure P28.30
70.02.
+
arrow_forward
X=2
Y=8
arrow_forward
Question 2
A generator having H = 6.0 MJ /MVA is delivering power of 1 .0 per unit to an infinite bus
through a purely reactive network when the occurrence of a fault reduces the generator output
power to zero. The maximum power that could be delivered is 2.5 per unit. When the fault is
cleared, the original network conditions again exist. Calculate:
a) The critical clearing angle.
b) The critical clearing time.
arrow_forward
2. When a large shunt capacitor is suddenly connected in parallel with the load bus in
the distribution feeder, what would happen to this bus current?
O A. Increase
B. Decrease
D. None of Above
arrow_forward
Full calculation with any assumption needed. All sub questions please as it is all related.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you

Power System Analysis and Design (MindTap Course ...
Electrical Engineering
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:Cengage Learning
Related Questions
- Ans:32.4 kV I have the solution but didnt understand.Kindly explain the solution.arrow_forwardA synchronous generator is feeding its rated power of 250 MW to a large 60 Hz network over a double circuit transmission The maximum steady state power that can be transmitted over the line with both circuits in service is 500 MW and is 350 MW with any one out of service. A solid three-phase fault occurring at the network-end of one of the lines causes it to trip. If inertia constant is H = 3.5 s, calculate the critical clearing angle and critical clearing time in which the circuit breakers must trip so that synchronism is preserved.arrow_forwardA generator feeds power to an infinite bus through a double circuit transmission line. A3 phase fault occurs at the middle point of one of the lines. The infinite bus voltage is 1 pu, the transient internal voltage of the generator is 1.1 pu and the equivalent transfer admittance during fault is 0.8 pu. The 100 MVA generator has an inertia constant of 5MJ/MVA and it was delivering 1.0 pu power prior of the fault with rotor power angle of 30 °. The system frequency is 50 Hz. The initial accelerating power (in pu) will bearrow_forward
- Explain this diagramarrow_forwardMaps ework Part II 0/1 An article in The Journal of Data Science ["A Statistical Analysis of Well Failures in Baltimore County" (2009, Vol. 7, pp. 111-127)] provided the following table of well failures for different geological formation groups in Baltimore County. Question 3 of 3 H یہarrow_forward30. In the circuit of Figure P28.30, determine (a) the cur- W rent in each resistor and (b) the potential difference across the 200-2 resistor. + 40.0 V 360 V 80.0 V + 200 Ω 80.0 Ω 20.02. Figure P28.30 70.02. +arrow_forward
- X=2 Y=8arrow_forwardQuestion 2 A generator having H = 6.0 MJ /MVA is delivering power of 1 .0 per unit to an infinite bus through a purely reactive network when the occurrence of a fault reduces the generator output power to zero. The maximum power that could be delivered is 2.5 per unit. When the fault is cleared, the original network conditions again exist. Calculate: a) The critical clearing angle. b) The critical clearing time.arrow_forward2. When a large shunt capacitor is suddenly connected in parallel with the load bus in the distribution feeder, what would happen to this bus current? O A. Increase B. Decrease D. None of Abovearrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Power System Analysis and Design (MindTap Course ...Electrical EngineeringISBN:9781305632134Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. SarmaPublisher:Cengage Learning

Power System Analysis and Design (MindTap Course ...
Electrical Engineering
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:Cengage Learning