Mid-Term Exam

docx

School

Wayne State University *

*We aren’t endorsed by this school

Course

5800

Subject

Civil Engineering

Date

Apr 3, 2024

Type

docx

Pages

3

Uploaded by UltraWolverine3668

Report
1 Construction Quality Management Department of Civil Engineering MID-TERM EXAM STUDENT NAME: 100 Points Possible Make sure you read the entire question BEFORE and AFTER you write your answer. Clearly mark what question you are answering. Make sure you put your answer IN CONTEXT (i.e., please answer the question I asked). Please provide your answers by uploading them to Canvas. For questions that require several parts to answer, clearly delineate the information with headings, separate paragraphs, etc. You will lose credit if I have to figure out where the different parts of your answers start and end. 1) (20 points) Scenario 1 : You are the project engineer of a construction project; the project superintend of the project informed you that the mechanical subcontractor has an issue in the field while trying to install an air duct; he found out that his proposed air duct path interferes with a structural concrete beam. A. Q1/ in your opinion what could you’ve done earlier to avoid this conflict? B. Q2/ at what project phase these issues can be identified and resolved to avoid such a conflict? C. Q3/ what steps should you do to help find a solution to assist your team to address and resolve this issue? Construction Quality Management - Mid-Term Exam
2 2) (40 points) Scenario 2 (see attached documents) : You are the project manager assigned to build the Taubman building in LTU. You have a meeting with the LTU construction board next week. You are required to create a logistics plan for the attached “proposed” Taubman building construction project. Using the drawings attached (Taubman Building Drawings). a. List what items you need to address in the logistics plan (i.e. safety of students, etc.) b. You will have an opportunity to ask the LTU board any questions (any missing information) that you need to know that help you developing the logistics plan. Generate a list of questions to the board. c. Develop a logistic plan by laying out the proposed Logistics plan features (i.e. construction trailer, lay down area, etc) needed for this job. (Use the attached logistics plan) Construction Quality Management - Mid-Term Exam
3 3) (10 points) Explain how applying a Quality Control program in a construction project can be used as a construction Risk management tool? Give two examples on how a QC program can manage construction Risk. 4) (10 points) How early involvement of a contractor in the design phase of a project helps having less construction issues in the field? What processes/tools can be used to achieve that? 5) (10 points) What is the difference between “design peer review team” and “design quality assurance/quality control review team”? 6) (10 points) Give two examples of: 1) Design assist subcontractor, 2) Design-Build specialty subcontractor. Elaborate on how using these subcontractors improve the quality of the project. Construction Quality Management - Mid-Term Exam
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help