HW#03 Construction Plans Reading_Spring copy

docx

School

California Polytechnic State University, San Luis Obispo *

*We aren’t endorsed by this school

Course

371-01

Subject

Civil Engineering

Date

Dec 6, 2023

Type

docx

Pages

3

Uploaded by BrigadierOtterPerson3402

Report
CALIFORNIA POLYTECHNIC STATE UNIVERSITY Department of Civil and Environmental Engineering Course: CE-371-Construction Management and Project Planning Instructor: Hani Alzraiee Homework #03: Construction Plans Reading Total Points: 30 Individual Assignment Purpose Every engineer is required to develop or read construction drawings during the professional career. The ability to understand and read the drawings is one of the most important skills an engineer should have. This homework gives you an opportunity to practice how to read construction drawings and locate certain information in the construction documents. Answers Use the construction plans of the Baseball Clubhouse Facility (file is attached) to answer the following questions: 1. What are the actual area, the height, and the number of stories of the clubhouse facility? Answer: 10,679 SF, 2 stories, 37 ft high Page Number: Page 5 Sheet Number: CP1.01 2. Name the following players of the project: a. Architect Answer: DLR Group Page Number: Page 1 Sheet Number: 0.00 b. Structural Engineer Answer: DLR Group Page Number: Page 1 Sheet Number: 0.00 Civil Engineer Answer: Rick Engineering Page Number: Page 1 Sheet Number: 0.00 Electrical Engineer Answer: The Engineering Enterprise Page Number: Page 1 Sheet Number: 0.00 Mechanical and Plumbing Engineer Answer: Capital Engineering Page Number: Page 1 HW #03 Page 1 of 3
Sheet Number: 0.00 3. Are there any new ADA parking spaces? If so, how many spaces are there and what are the dimensions of the parking space(s)? Answer: No new accessible parking; 2 existing accessible parking (18’x8’-11” and 18’x9’-11”, 8’-0” apart) Page Number: Page 7 Sheet Number: CP1.03 4. What is the proposed minimum cover for the water mains and laterals supplying the building? Answer: 3.0’ Page Number: Page 38 Sheet Number: C4.01 5. What is the existing water line's size that must be removed within the demolition area? Answer: 1.5” Page Number: Page 35 Sheet Number: C2.01 6. What is the distance between Gridlines 5 & 6? And the distance between gridlines A & B? Answer: 5-6: 30’-11 5/8” A-B: 22’-8” Page Number: Page 46 Sheet Number: A1.02 7. What is the finish floor elevation of level 1 (FF1) ? Answer: 344.2 Page Number: Page 36 Sheet Number: C3.01 8. On what sheet would you find the section cut-through facing project east between gridlines 5 and 6? Answer: A6.01 Page Number: Page 45, 55 Sheet Number: A1.01, A6.01 9. What is the size of the window installed at the women’s restroom on the second level? Answer: 7’-0” x 2’-0” Page Number: Page 64 Sheet Number: Sheet A9.01 10. Who is the BOD (Basis of Design) manufacturer for the operable wall system shown on the south elevation? Answer: NANAWALL Page Number: Page 54 Sheet Number: A5.01 11. What is the pitch of the roof on the north side of the building? HW #03 Page 2 of 3
Answer: 1 1/2 : 12 Page Number: Page 52 Sheet Number: A4.01 12. What type of flooring is used in the following rooms: a. Multipurpose room Answer: Porcelain Tile Page Number: Page 74 Sheet Number: A13.01 b. Mechanical Room Answer: Sealed Concrete Page Number: Page 74 Sheet Number: A13.01 c. Video Room Answer: Carpet Tile Page Number: Page 74 Sheet Number: A13.01 13. On the foundation plan, what are the size, depth, and reinforcement required for the spread footing on the southwest corner of the building? Answer: 8’-3” x 8’-3” x 2’-0” DEEP; #7 @ 12”oc EACH WAY, TOP & BOT Page Number: Page 79 Sheet Number: S1.1 14. On the foundation plan, what is the depth of the Slab On Grade (SOG) ? Answer: 5” Page Number: Page 79 Sheet Number: S1.1 HW #03 Page 3 of 3
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help