Question
Chapter 9, Problem 9.4P
To determine
The factors that would lead to the disqualification from bidding.
Expert Solution & Answer

Want to see the full answer?
Check out a sample textbook solution
Students have asked these similar questions
A cantilever flexural member is
fabricated by bolting two identical C-
section steel shapes back to back as
shown in the figure. The beam has a
span of L = 1300 mm and supports a
concentrated load of P = 800 N. The
cross-sectional dimensions of the built-
up shape are shown in the figure.
Assume the section has a constant
thickness of t = 2.5 mm. Bolts of 3.5
mm diameter are installed at intervals of
s = 65 mm.[b = 100 mm, a = 25 mm]
b
T
Determine the shear flow in the
sections connected by the fasteners.
Calculate the shear force in each bolt.
Calculate the shear stress in the bolts.
Five wood boards are bolted together to
form the built-up beam shown in the
figure. The beam is subjected to a
shear force of V = 14 kips. Each bolt
has a shear strength of V bolt = 6 kips.
[h₁4 in., t₁ = 0.75 in., h₂ = 6.5 in., t₂ =
1.25 in.]
hi/2
h/2
h2
h:/2
hi/2
+
h2
Determine the moment of inertia of the
section.
Determine the shear flow in the section
connected by fasteners.
Determine the maximum allowable
spacing of the bolts.
Two built-up beams shown in the figure
below have the same dimensions and
are connected by the same types of
nails with the same spacing. Which
beam could carry more shear force if
the controlling factor is the shear flow in
the fasteners?
Nails
Beam (1)
Z
Beam (2)
Beam (2)
Beam (1)
Both are the same
Cannot answer without
knowing the shear diagram
Cannot answer without
knowing the modulus of
rigidity
Nails
Knowledge Booster
Similar questions
- Two built-up beams shown in the figure below have the same dimensions and are connected by the same types of nails with the same spacing. Which beam could carry more shear force if the controlling factor is the shear flow in the fasteners? Nails Beam (1) Beam (2) Cannot answer without knowing the shear diagram Beam (1) Cannot answer without knowing the modulus of Nailsarrow_forward8-51. Determine the horizontal displacement at C. Take E = 29(10³) ksi, I = 150 in for each member. Use the method of virtual work. 8ft 10 ft Barrow_forward5. Problem 8-46 on Page 374. 8-46. The L-shaped frame is made from two fixed-connected segments. Determine the vertical displacement of the end C. Use the method of virtual work. El is constant. -9 ft- 2 k/ft 12 ftarrow_forward
- HOMEWORK (1) For the plan and section of the wall shown below, calculate the following: - 1. the length of footing excavation 2, the length of bricks work under D.P.C for each step by using: a) Centre line method b) Long wall-short wall method عرف الحق Im D.P.C 1.00 m Section 0.24 m 0.36 m 0.48 m 15 m r N 8 m 5 m Plan Farrow_forwardfollowing: 1. the length of footing excavation 2. the length of bricks work under D.P.C for each step by using: a) Centre line method b) Long wall-short wall method D.P.C 1.00 m 0.24 m 0.36 m y0.48 m 15 m Section. N A k W 8 m 5 m زف الحو 不 Z Plan ate the Larrow_forwardPage 3 3.5) Using the Method of Components, determine the magnitude, the direction, and the sense of the resultant for the coplanar concurrent force system shown below. Y 76 lbs 10 kips 4 3 0 Y 12 kips 5 12 > x 60 lbsarrow_forward
- REINFORCED CONCRETE DESIGNFLEXURAL ANALYSIS OF BEAMS (CRACKED SECTION)Solution must be completeUse ballpen/inkpenAnswer in two decimal placesBox your final answerarrow_forwardA vertical parabolic curve has a back tangent of -5% and a forward tangent of +3% intersecting at station 1 + 240 at an elevation of 100m. If the stationing of PC is at 1 + 120, Evaluate the elevation at the third quarter point.arrow_forwardREINFORCED CONCRETE DESIGNFLEXURAL ANALYSIS OF BEAMS (CRACKED SECTION)Solution must be completeUse ballpen/inkpenAnswer in two decimal placesBox your final answerarrow_forward
- What is the volume of the earth's mantle in cubic kilometers? (tute problem 4d) Note: enter the number without units. For large (or small) numbers, use E notation, e.g. three million is equivalent to 3*10^6 which is 3E6 in E notation.arrow_forwardH.W: From an in-out survey conducted for a parking area consisting of 40 bays, the initial count was found to be 20 vehicles. Table gives the result of the survey. The number of vehicles coming in and out of the parking lot for a time interval of 5 minutes is as shown in the table below. Find the accumulation, total parking load, average occupancy and efficiency of the parking lot. Table: In-out survey data Time (minutes) In Out 5 3 2 10 6 2 15 3 1 20 6 7 25 6 4 30 8 6arrow_forwardcan you show me step for step? Autocad has me irritated.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage Learning
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningEngineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning

Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,

Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,

Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning

Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning

Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning

Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning