![Traffic And Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781133605157/9781133605157_largeCoverImage.gif)
The LOS,
![Check Mark](/static/check-mark.png)
Answer to Problem 18P
The level of service is
Explanation of Solution
Given:
Base free flow speed is
Lane width is
Shoulder width is
Access points per mile is
Formula used:
Write the expression to calculate the value of
Here,
Write the expression for peak
Here,
Write the expression to calculate the base percent time spent following.
Here,
Write the expression to calculate the percent time following.
Here,
Write the expression to calculate the free flow speed.
Here,
Write the expression to calculate the average travel speed.
Here,
Write the expression to calculate the volume to capacity ratio.
Here,
Write the expression to calculate the total number of vehicle miles during
Here,
Write the expression to calculate the number of vehicle miles during the peak hour.
Write the expression to calculate the total travel time in peak
Calculation:
Refer table 9.5, "Passenger car equivalents for trucks and RV's to determine the percent time spent following on two way and directional segments.
The value of
The value of
Substitute
Substitute
Substitute
Refer table 9.3, "Adjustment for combined effect of directional distribution of traffic and percentage of no passing zones on percent time spent following on two way segments.
The value of
Substitute
Substitute
Refer table 9.6, "Adjustment for effect of no passing zones on average travel speed on two way segments".
The value of
Substitute
Refer table 9.1, "Level of service criteria for two lane highways in class I.
The value of
Substitute
Substitute
Substitute
Substitute
Conclusion:
Therefore, the level of service is
Want to see more full solutions like this?
Chapter 9 Solutions
Traffic And Highway Engineering
- Consider the three cases shown below, in which a soil column is subjected to different water heads (similar set-upDarby’s experiment in the reader). Using the tables provided, establish the pressure, elevation, and total heads ateach location, considering that the datum is:a) at the headwater, andb) at the tailwater.c) What was the effect of assuming a different datum on the i) pressure, ii) elevation, and iii) total heads?d) In the schematic for each case, draw an arrow indicating the direction of water flow inside the soil.e) What is the hydraulic gradient across the soil in each case?f) If the soil permeability and cross-sectional area of the cylinder remains constant across the different cases, whichone leads to the largest flow rate q? Which one has the lowest flow rate?g) What assumptions were necessary for you to answer these questions?arrow_forwardFor given distributed loads, see figures below, determine resultant and moments around load ends (points A and B). Assume p = 2kN/m.arrow_forwardA permeability test apparatus of diameter 82.5 mm contains a column of fine sand 460 mm long. When water flows through it under a constant head at a rate of 191 cm3/minute, the loss of head between two points 250 mm apart is 380 mm. Calculate the coefficient of permeability of the fine sand. If falling head test is made on the same sample using a standpipe of diameter of 30 mm, in what time will the water level in standpipe fall from 1560 mm to 1066 mm above outflow level.arrow_forward
- Computation must be completeFor the given cantilever beam shown in the figure below,a. Draw the shear and moment diagram using service loads.b. Determine the critical design moment using Working Stress Design (Ma) load combinations.c. Draw the shear and moment diagram using factored loads.d. Determine the critical design moment using Strength Design (Mu) load combinations, use NSCP2015.e. For the given cross-section of the beam, give the reason why the reinforcement is at the topportion of the beam section?arrow_forwardLAB: FORCE AND FORCE-RELATED VARIABLES ASSIGNMENT INSTRUCTIONS INSTRUCTIONS Lab assignments are intended to give you some ‘hands on' experience in applying the concepts introduced in the course text. They are designed to get you out of your classroom or office and develop the skills of designing experiments and collecting data, and then performing calculations, evaluating the results, and communicating your findings. Labs are more than just number crunching - they are about reflecting on what is both practical and technically sound engineering problem-solving. For each problem below, address the scenario presented and develop engineering solutions. Communicate your results using drawings, pictures, and discussion, supported by calculations developed using the Microsoft Equation Editor or similar tool. Submit your lab report in a single pdf file uploaded to the location provided in Canvas before the due date/time indicated. Each problem should be treated as a micro-report with a problem…arrow_forwardHow can a construction estimator gain experience to better judge appropriate contingency amounts?arrow_forward
- What are the potential risks and rewards of including a higher or lower contingency amount in a construction estimate?arrow_forwardDraw moment and shear diagramsarrow_forwardFIND THE INTERNAL MISSING ANGLES AND MISSING SIDESOF A 90° RIGHT TRIANGLE WITH A HEIGHT OF 96 AND A BASE OF 48.DRAW A PROPORTIONAL SKETCH OF THE TRIANGLE, IDENTIFY GIVEN INFORMATIONAND LABEL MISSING INFORMATION. WHAT IS AREA TO THE NEAREST SQ. FT.?arrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)