Software Engineering (10th Edition)
10th Edition
ISBN: 9780133943030
Author: Ian Sommerville
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 8, Problem 8.9E
Program Plan Intro
Testing:
Testing is a study conducted to provide information about the quality of the system. Testing is an important phase of the development process.
Role of user in system testing:
- System testing is influenced by the experience of the users during the acceptance testing. User plays an important role.
- System must test in depth to ensure that the end product produces the high quality of system.
- The user reactions and feedback is essential for the system testing.
- Every system must have to pass through the acceptance testing.
- If the system meets the requirements of the business but is not accepted by the users, then it will be considered as the system failure.
- User feedback shapes the system and its acceptance.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
What are the differences between Feature Testing, System Testing, and Release Testing? What things are important about each one? Can one level of testing be skipped??
What is the significance of a post-implementation evaluation? What's the best way to go about it?
Mr. Collins, head of the software development department, claims that beta site tests should always be carried out as early as possible in the development process, as there are no disadvantages to this method. Are beta site tests really a “disadvantage-free” method? If not, what are the main disadvantages and risks of beta site tests?
Knowledge Booster
Similar questions
- What is the difference between an operational environment and a test environment?arrow_forwarddocumentation should be emphasized is not true of the conversion phase of the development life cycle? explain?arrow_forwardHow does one go about developing a brand new release of a software package? Examine the software version documentation online to learn about the versioning specifics and practices that were implemented. Please use proper citations in the future.arrow_forward
- What is the central limitation of testing and how do we cope with it in practice?arrow_forwardIn other words, what is the definition of a test plan? Which elements should make up a test plan, if one is necessary?arrow_forwardEvaluate the following action taken by the team during the validation. For each scenario, identify its appropriateness (of action taken) by writing ‘appropriate’ or ‘not appropriate’ then map the case with the related validation principles. 1. The requirements engineer conducts an inspection of the requirements as mandated in the process and invites system architect, a programmer, a tester, and a legal compliance expert as inspectors. 2. Since no other project member was suitable to moderate the inspection meeting, the requirements engineer decides to be the moderator of the moderator meeting. 3. The requirements engineer decides to conduct the validation only once due to budget constraint. 4. Before the validation session begins, the requirements engineer reminds all reviewers to immediately correct the errors found in the document. 5. The inspection team requests for additional development artifact directly from the author. 6. The inspection team…arrow_forward
- In K. Wieger’s paper, “Validating Requirements”, he wrote: “On many projects, testing is a late-stage activity. Requirements-related problems linger in the product until they’re finally revealed through time-consuming system testing or by the customer.” Based on what we discussed recently in the peer reviews module, how can we address this problem and reduce requirements-related problems?arrow_forwardYour team leader has asked you to write the test plan for the project. A test plan is used to document the testing and verification process of a project. It will contain test cases covering different levels of testing and serve as a record to show that all parts of the project passed the necessary testing. Discuss why it is important to perform different levels of testing. In your answer, make sure to give examples for each level, based on any feature/s of the case provided.arrow_forwardThis might result in either feature creep or scope creep, both of which are undesirable. Explain to everyone how the two concepts are distinct from one another so that they may comprehend your explanation. In what ways do you believe these two problems stem from the same source? In the event that these two unpleasant events take place while working on this project, how disastrous may the situation become?arrow_forward
- Briefly write about any three Testing Goals Based on Test Process Maturity.arrow_forwardYou have been given the task of delivering the project ahead of time while maintaining the same level of resources at the software company where you are the lead developer (i.e. neither the salary nor the practitioners are added). In this situation: Where exactly are the risks? What kind of action would you take to address this issue if you were the leader of the team?arrow_forward1)Write a possible scenario that could be used to help design tests for the MHC-PMS case. Then create a test plan for the Scenario Testing. 2)What are the strategic options for legacy system evolution? When would you normally replace all part of a system rather than continue maintenance of the software?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Information Technology Project ManagementComputer ScienceISBN:9781337101356Author:Kathy SchwalbePublisher:Cengage Learning
Information Technology Project Management
Computer Science
ISBN:9781337101356
Author:Kathy Schwalbe
Publisher:Cengage Learning