Identify the following variables as either discrete or continuous: (a) The number of times heads comes up in 100 tosses of a coin (b) The number of accidents occurring in a specified section of a freeway (c) The weight of boxes shipped from an Amazon warehouse (d) The concentration of carbon dioxide in the air of San Diego versus time (e) Optimistic, most likely, and pessimistic estimates of salvage value
Canadian oil company is considering whether or not to develop a site it has been exploring for the past six months. One of the arguments for developing the site is that considerable time and money have already been expended. This cost should not be included in the capital budgeting decision because it is:
Unsure
A.sunk cost
B.An agency cost
C.An operating cost
D.A financing cost
E.An opportunity cost
A company planning to manufacture Webcams has to decide on the location of the production facility. Three location are being considered A, B and C. the fixed costs at the three locations are estimated to be $40000, $65000, and $32000 per year respectively. The variable costs are $4, $2.5 and $4.5 per unit, selling price in three location is $110, $180 and $90 respectively. Maximum capacity is 12000 unit/year in A, 19500 unit/year in B and 9600 unit/year in C. Find the following below:
1- Break- Even quantity in three location2- Profit or loss in location A when quantity is 400 and 300 3- Profit or loss in location B when quantity is 350 and 450 4- Profit or loss in location C when quantity is 425 and 325 5- Maximum revenues in A, B and C6- Range of profit at Demand in A, B and C
Sketch the Break – Even chart each three location
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, economics and related others by exploring similar questions and additional content below.Similar questions
- The Vera Molding company has two alternatives for meeting a customer requirement for 10,500 units of specialty molding. If done in-house, the fixed cost would be $325,000 with variable cost at $25 per unit. Alternative two is to outsource for a total cost of $60 per unit. a. What is the breakeven quantity? b. Should the firm make the 9,000 units in-house or outsource?arrow_forwardFrom the graph provided one can surmise that the number of time spent on cost estimation, the less the efficiency one attains. + 30% r Scoping/feasibility + 25% + 20% Order of magnitude estimate + 15% Partially designed + 10% Design 60–100% complete + 5% Detailed estimate 10 minutes 1 hour Time Spent on Estimate A) True B) False Accuracy of Estimate 1 day´ 1 week 3 weeksarrow_forwardState how the opportunity cost sets the MARR when, because of limited capital, only one alternative can be selected from two or more.arrow_forward
- Which of the following would be considered noneconomic factors in deciding which type of power plant to build: (a) equipment cost; (b) morale; (c) goodwill; (d) salvage value; (e) public acceptance; and (f) aesthetics?arrow_forwardplease answer first four subpartsarrow_forwardPlease do not give solution in image format ? And Fast Answering Please And Explain Proper Step by Step.arrow_forward
- FEMA (Federal Emergency Management Agency) has ordered 25 specialized test units capable of field checking 15 separate elements in potable water inemergency situations. Thompson Water Works, Inc., the contractor, took 200hours to build the first unit. If direct and indirect labor costs average $50 perhour, and an 80% learning rate is assumed, estimate (a) the time needed to complete units 5 and 25, and (b) the total labor cost for the 25 units.arrow_forwardThe best alternative given up when we make a decision is called the Rational cost b) Marginal cost c) Opportunity cost The process of analyzing the additional cost or hopofite rice from of that decision. d) Dollar costarrow_forwardWhich is the most efficient analysis method we can use for determining project acceptability on an economic basis?arrow_forward
- An engineering student has only 45 minutes before the final exam in her Engineering Economy class. She needs help in understanding cost-effectiveness analysis because she knows from the instructor’s review session that a CEA problem will be on the exam. There is time for using only one method of assistance before the exam; she must select well. In a rapid process of estimation, she determines how many minutes it would take for each method of assistance and how many points it might gain for her on the final. The method and estimates follow. Where should she seek help to be most effective? Assistance from Minutes for Assistance Points Gained Teaching assistant (TA) 15 20 Slides on web 20 10 Friend in class 10 5 Instructor 20 15arrow_forwardSuppose for a project the following estimates are given as: Investment cost 1,000,000 TL (Deterministic value) 150,000 TL (Most likely estimate (probabilistic value) None Net annual benefits Salvage value Annual interest rate 8% (Deterministic value) Study Period 10 years Investigate the present worth at most likely estimate, - 10% and + 10% changes in net annual benefits and determine the decision reversal point.arrow_forwardIs it possible or even desirable for strategic planning for project management to include ways to improve cooperation and working relationships, or is this beyond the scope of strategic planning for project management?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education
Valuation Analysis in Project Finance Models - DCF & IRR; Author: Financial modeling;https://www.youtube.com/watch?v=xDlQPJaFtCw;License: Standard Youtube License