Residential Construction Academy: House Wiring (MindTap Course List)
Residential Construction Academy: House Wiring (MindTap Course List)
4th Edition
ISBN: 9781285852225
Author: Gregory W Fletcher
Publisher: Cengage Learning
bartleby

Concept explainers

Question
Book Icon
Chapter 8, Problem 1RQ
To determine

The description of the purpose of a weatherhead.

Expert Solution & Answer
Check Mark

Explanation of Solution

Weatherhead is the fitting located on the service drop end of the service entrance raceway or service entrance cable. The other name of weatherhead is a service head.

Weatherhead is designed for the reduction of the moisture amount which can access the raceway or cable.

The aim of the weatherhead is to prevent water from entering the end of a service entrance cable. Every service entrance conductor has to exit the weatherhead from a separate hole.

Service raceways at the connection point should be fitted with a weatherhead to overhead service conductors. Service entrance cables should be fitted with a weatherhead specified for use in a place that's wet. Through independently bushed openings in the weatherhead, service entrance conductors should be carried out.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
2. Using the Green-Ampt Model, compute the infiltration rate, f, and cumulative infiltration, F, after one hour of infiltration into a sandy clay loam soil. Assume initial moisture conditions are midway between the field capacity and wilting point and that water is ponded to a small but negligible depth on the surface.
Assignment 1 Q1) Determine the member end forces of the frames shown by utilizing structural symmetry and anti-symm. (Derive each member forces and show BMD,SD,AFD) 20 kN/m 40 kN/m C D Hinge Ẹ G A -3m 5m B 5 m 3 m- E, I, A constant 12 m
A1.3- Given the floor plan shown in Figure 3. The thickness of the slab is 150mm. The floor finish, ceiling and partition load is 1.8 kN/m². The live load on the floor is 2.4 kN/m². The beams cross section dimension is 300mmx600mm. Assuming the unit weight of concrete is equal to 24 kN/m². It is required to: a) Show tributary areas for all the beams on the plan; b) Calculate the load carried by beams B1 (on gridline A, between 1 and 3), B2 (on gridline B, between 1 and 3)and B3 (on gridline 3, between A and C); c) Calculate the load carried by column C1 per floor (ignore the self weight of the column). A 1 B1 2 B2 B Cl 8.0 m Figure 3 8.0 m B3 23 3 *2.0m 5.0 m 4.0 m +1.5m+
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781337402415
Author:Gregory W Fletcher
Publisher:Cengage Learning