Question
Book Icon
Chapter 8, Problem 1RQ
To determine

The two stages involved in pricing of an estimate.

Expert Solution & Answer
Check Mark

Explanation of Solution

Pricing of estimate is defined as the process of approximately calculating the cost of the project after considering various factors influencing the cost of the project.

There are two stages of pricing of estimate and are given below.

Stage 1 − It is the starting phase and during this stage, a general list of all items required is prepared. This phase is also known as take off phase since take off of all items in the bid package is done.

Stage -2 − In this phase the price of all the items in the list is calculated. During this stage, the estimator focuses on one trade at a time while performing the pricing of items so it is considered as recap. This phase is known as recap. After finishing the recap, the summary of pricing for each craft is made. This makes the final bid easy.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Factor of Safety Activity The lap joint is connected by three 20-mm diameter rivets. Assuming that the applied allowable load, P=50kN is distributed equally among the three rivets and a factor of safety of 1.5, find: (a) the failure shear stress in a rivet, and (b) failure bearing stress between the plate and rivet 25 mm 25 mm
Draw the shear and moment diagrams of the beam CDE showing all calculations.  Assume the support at A is a roller and B is a pin.  There are fixed connected joints at D and E.  Assume P equals 9.6 and w equals 0.36
Find the length of the diagonal on the x-z plane (square root of square of sides). Find angle between the vector F and its projection on x-z (the diagonal defined above). Find Horizontal Projection of F on x-z plane, Fh, and vertical component, FY. Find projections of Fh, to define in-plane components Fx and Fz. Show that results match those of Problem 2(a) above. (2,0,4) F₂ 100 N (5, 1, 1)

Chapter 8 Solutions

FUND.OF CONSTRUCTION...-MINDTAP(2 TERM)

Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Text book image
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning
Text book image
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning