ACL:

  • ACLs stands for Access Control Lists are a network filter utilized by switches and routers to allow and restrict data flows into and out of network interface.
  • After configured ACL on an interface, data passing through an interface is analyzed by the network device and compare it to the conditions described in the ACL, and either allow the data to flow or bans it.
  • On most router, every interface must be assigned a separate ACL, and different ACLs may be associated with outbound and inbound traffic. After ACLs are installed on routers, every ACL is assigned a name or number.
  • The command “access-list” is used to assign a statement to a pre-installed ACL. This command must identify the ACL and include a deny or permit argument.
  • For example, to permit ICMP traffic from any IP address to any other IP address is “access-list acl_2 permit icmp any any”.
    • Here, “access-list” command is used to assign a statement to a pre-installed ACL.
    • The “acl_2” is a name.
    • The “permit” is used to allow the data flow.
    • The “icmp any any” means allow the data flow traffic from any IP address to any IP address.

Blurred answer
Students have asked these similar questions
A customer has requested a quotation for a machining job consisting of 80 parts. The starting work part is a casting that will cost $17.00 per casting. The average production time of the job is 13.80 min on an automatic machine whose equipment cost rate is $66.00/hr. This rate does not include any overhead costs. Tooling cost is $0.35 per part. The factory overhead rate is 128% and the corporate overhead rate is 230%. These rates are applied only to time and tooling costs, not starting material costs. The company uses a 15% markup on total cost for its price quotes. What is the quoted price for this job?
Timing Diagram for Memory Read Bus Cycle: Clock- பட I T1 I T₂ T₂ 1 Tw IT I ALE Add/Status BHE, Ag A Sy- Sg Add/Data A15 Ag Bus reserved for data in Dis-Do RD' DEN'. DT/R'. How do I adjust the drawing correctly and how does the question come on it and on what size do I solve Timing Diagram for Memory Write Bus Cycle: Clock I T₁ I T₂ T3 ITW T4 1 ALE Add/Status BHE, Ag Ag S7- 53 Add/Data A15 Ag Valid data Dis- Do WR DEN DT/R 5:18
Okay I want to draw a plan for me how to start from zero to the stage of development with some books that help me and complete the natural concept 11:24 ص
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Computer Networking: A Top-Down Approach (7th Edi...
Computer Engineering
ISBN:9780133594140
Author:James Kurose, Keith Ross
Publisher:PEARSON
Text book image
Computer Organization and Design MIPS Edition, Fi...
Computer Engineering
ISBN:9780124077263
Author:David A. Patterson, John L. Hennessy
Publisher:Elsevier Science
Text book image
Network+ Guide to Networks (MindTap Course List)
Computer Engineering
ISBN:9781337569330
Author:Jill West, Tamara Dean, Jean Andrews
Publisher:Cengage Learning
Text book image
Concepts of Database Management
Computer Engineering
ISBN:9781337093422
Author:Joy L. Starks, Philip J. Pratt, Mary Z. Last
Publisher:Cengage Learning
Text book image
Prelude to Programming
Computer Engineering
ISBN:9780133750423
Author:VENIT, Stewart
Publisher:Pearson Education
Text book image
Sc Business Data Communications and Networking, T...
Computer Engineering
ISBN:9781119368830
Author:FITZGERALD
Publisher:WILEY