Concept explainers
a)
To determine: The standard time for the operation.
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
b)
To determine: The number of observations for element A
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
c)
To determine: The number of observations for element C.
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
Want to see the full answer?
Check out a sample textbook solutionChapter 7 Solutions
OPERATIONS MANAGEMENT -CONNECT
- 5. The manager of Asombrado Bounty Office, Charles Badillo, estimates his employees are idle 25%of the time. With that problem, how many work samples are needed to consider within 3%accuracy and have 95.45% confidence level. 6. At ASP Micro Manufacturing, Inc. workers press semiconductor into predrilled slots on printed-circuit boards. Determine the normal time of the operation in seconds. The elemental motions for normal time used by the company are as follows:• Reach 6 inches for semiconductors 10.5 TMU• Grasp the semiconductors 8.0 TMU• Move semiconductor to printed-circuit board 9.5 TMU• Position semiconductor 20.1 TMU• Press semiconductor into slots 20.3 TMU• Move board aside 15.8 TMU 7. The semiconductor used in Costin Calculator has 5 components with the consistency of 90%, 95%,98%, 90%, and 99%, respectively. How reliable is one product of calculator?arrow_forward. Given the following information, determine the sample sizeneeded if the standard time estimate is to be within 5 percent ofthe true mean 97 percent of the time. Work Element Standard Deviation (minutes) Mean Observed Time (minutes)l 0.20 1.102 0.10 0.803 0.15 0.904 0.10 1.00arrow_forwardA time study of an employee assembling peanut valves resulted in the following set of observations. What is the standard time, given a performance rating of 109 percent and an allowance of 21 percent of the total normal time? Average Time (seconds) 15 Observations 16 16 18 23 12 The standard time is seconds. (Enter your response rounded to two decimal places.)arrow_forward
- Q2 (a) A time study analyst timed an assembly operation for 30 cycles, and then computed the average time per cycle, which was 18.75 minutes. The analyst assigned a performance rating of 0.96 and decided that an appropriate allowance was 15 percent. Assume the allowance factor is based on the workday. Determine the following: (i) Observed time (OT) (ii) The Normal times (NT) (iii) The standard time (ST) (b) If the analyst wants to estimate the number of observations that will be needed to achieve a specified maximum error, with a confidence of 95.5 %. A preliminary study yielded a mean of 5.2 minutes and a standard deviation of 1.1 minutes. Determine the total number of observation needed for these two cases: (a) A maximum error of + or - 6 % (b) A maximum error of 40 minutesarrow_forwardEach year, Lord & Taylor, Ltd., sets up a giftwrapping station to assist its customers with holiday shopping. Preliminary observations of one worker at the stationproduced the following sample time (in minutes per package):3.5, 3.2, 4.1, 3.6, 3.9. Based on this small sample, what number of observations would be necessary to determine the truecycle time with a 95% confidence level and an accuracy of{5%?arrow_forwardK Claudine Soosay recorded the following times assembling a watch: Observation No. 1234567co 8 Time (minutes) 0.12 0.10 0.11 0.11 0.15 0.10 0.10 0.10 Observation No. 9 10 11 12 13 14 15 16 Time (minutes) 0.11 0.08 0.11 0.10 0.10 0.11 0.14 0.08arrow_forward
- help pleasearrow_forwardThe results of a time study to perform a quality control test are shown in the following table: *Disregard employee is smoking a cigarette (included in personal time). The allowance factor is given to be 25%. a) The normal time for the complete operation = b) The standard time for this process = Performance Observation (minutes per cycle) Element Rating 1 2 3 4 5 1 95% 1.5 1.8 23 2 110% 0.8 0.5 90% 0.5 0.4 4 85% 0.6 0.9 8549 1.8 1.9 1.4 0.6 3.7* 0.6 0.6 0.4 0.4 0.7 0.7 0.7 minutes (round your response to two decimal places). minutes (round your response to two decimal places).arrow_forward(a) What is a technique for estimating the percent of the time a worker spends on various tasks? A) stopwatch time study B) simultaneous motion study C) work sampling D) standard elemental (historical) times E) predetermined (published) time standards (b) A bank manager wants to determine the percent of the time the bank's tellers are working and idle. He decides to use work sampling, and his initial estimate is that the tellers are idle 22% of the time. Approximately how many observations should be taken to be 95% confident that the results will not be more than 5% away from the true result? A)6 B) 16 C) 203 D) 264 E) 246arrow_forward
- 8. A teller at a drive-up window at a bank had the following service times (in minutes) for 20 randomly selected customers: SAMPLE 1 2 3 4 4.5 4.6 4.5 4.7 4.2 4.5 4.6 4.6 4.2 4.4 4.4 4.8 4.3 4.7 4.4 4.5 4.3 4.3 4.6 4.9 Select a chart to monitor the central tendency of the process, what are the 3-sigma control limits using a mean chart? Keep 3 decimal places. Select one: a. LCL = 4.212, UCL = 4.788 b. LCL = 4.414, UCL = 4.586 c. LCL = 4.245, UCL = 4.755 d. None of the other options. e. LCL = 4.385, UCL = 4.615arrow_forwarderations Management Spring21 Time left 1:09:19 stion In a fabric manufacturing factory, the quality control process using control charts from SPC. In an hour there are a total of 5 samples are taken each having 5 observations regarding the thickness of fabric in measured in millimeters. In a particular hour, the sample means (X-bar) are noted to be: 156.46, 199.62, 189.31, 102.22, and112.09 respectively. In the same sample, the corresponding ranges are: 11.97, 12.17, 13.94, 11.86, and 11.83 respectively. What are the lower and upper control limits for the X-bar chart? et ered ed out of O a. None is correct lag O b. 156.55, 170.47 tion O C. 144.77, 159.11 O d. 145.40, 190.72 O e. 143.55, 165.47 Of. 142.92, 160.66 Fi PREVIOUS PAGE NEXT PAGE O Type here to search %23arrow_forwardFor a time study of a health insurance claims-adjusting process, the analyst uses the continuous method of recording times. The job is divided into four work elements. Shown in Figure are the performance rating factors, RF, and the continuous method recorded times, r, for each work element.a. Calculate the normal time for this job. b. Calculate the standard time for this job, assuming that the allowance is 20 percent of the normal time. c. What is the appropriate sample size for estimating the time for element 2 within {10 percent of the true mean with 95 percent confidence?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.