Concept explainers
Arraylist:
It is a collection framework and the java package “java.util.package” is used for this. Arraylist is a dynamic list which is used to store dynamic array elements.
To use Arraylist class in a Java program, it must be imported first from the Java library files.
The statement which must be imported in order to use Arraylist class is,
import java.util.Arraylist;
Syntax for Arraylist:
ArrayList() object_name=new ArrayList();
Here,
- “ArrayList()” is the class name with no arguments. The programmer can use “ArrayList(Collection c)” and “ArrayList(int)” from “util” package.
- “object_name” describes name of the object of Arraylist.
Creation of string ArrayList:
ArrayList <String> x = new ArrayList<String>();
The above statement is an example of creation of ArrayList class. The array object “x” is used to store the list of objects.
Inserting an item at specific location in an ArrayList object:
The items can be inserted at the specified index in an Arraylist object using “add()” method,
Insertion of object at the beginning of the list is as follows:
a.add (0, object);
The “a” is an array list object and “add” is a built-in function which is used to add the objects to the list. The argument “(0, object)” means add the object at the beginning of the object.
Example:
To insert an item at index 2 for ArrayList named List which stores strings, the following statement is used,
List.add(2, “John”);
Want to see the full answer?
Check out a sample textbook solutionChapter 7 Solutions
MyLab Programming with Pearson eText -- Access Code Card -- for Starting Out with Java: From Control Structures through Objects
- Can you find the shortest path tree starting from vertex 3 to all other vertices for the graph below using BFSarrow_forwardCan you find shortest path from vertex 3 to all other vertices for the graph below.arrow_forwardcan you draw the shortest path tree using BFS for the following directed unweighted graph?arrow_forward
- What is the shortest path from vertex 3 to all other vertices:Which graph algorithm can solve the problem most efficiently(the quickest runtime)How could the same algorithm if the graph had edge weights? (create intermediate nodes)arrow_forwardThe difference between (1) a database management system (DBMS) and (2) a database, is: a. The first refers to a complete accounting system, the second refers to a subset of that b. The first is program software, the second is proprietary data and related files c. The first is hardware, the second is software d. Nothing—these terms are synonyms..arrow_forwarda) An example of the linear hash index is given below. Every time a new overflow page is added, the bucket pointed by Next is split, and Next is incremented by one. Show the index state after adding the keys 39, 25, and 29. hi ho Level=0, N=4 000 00 0*8* 001 01 17*33* 010 10 6*26* 42* 011 11 7* 11* 15* 23* 100 00 4* 12* 20* 101 01 5* 13* 21* 37* Nextarrow_forward
- What would be the runtime (big-O asymptotic notation) of Dijkstra’s algorithm if it is implemented based on an unsorted minimum priority queue in terms of vertices (v) and edges (e)? Please show all steps including the runtime of each step of the algorithm.arrow_forwarda) An extendable hashing index is given below. Present the state of the index after adding the keys 21, 25, and 29. Directory Buckets 0*8* 12* 20* 00 9* 13*33* 01 10 6*26* 42* 11 7* 11* 15*23* b) Explain the concepts of global depth and local depth of buckets. Which buckets in the index above (after inserting 21, 25 and 29) have a global depth equal to the local depth? c) Describe the bulk loading algorithm for B+ trees. What are the differences to using a simple B+ tree add operation?arrow_forwardb) Below is an example of a B+ tree. Add an element with key 19 and then delete an element with key 1. Present the final result. 1* 3* . 10 18 24 27 37 10*15* - 18 20 22 24*26* 24* 26* - 27* 30*32* 37*40*arrow_forward
- Books (bid, author, title, publisher, year, notes); Members (mid, name, surname, street, city, country, phone, notes); Borrow (rid, bid, mid, date, notes);arrow_forwardCustomer (cid, name, surname, city, address, phone) Account (aid, cid, amount, currency, created) Deposit (did, aid, cid, amount, date) Withdraw(wid, aid, cid, amount, date)arrow_forwardData environment The SPJ company manages the orders of the parts from the suppliers for the projects that run at other companies. A project is described with the project identifier, name, company where the project takes part, budget, start date, and the duration of the project. A part is presented with the part identifier, name, and price. A supplier is described by the supplier identifier, name, address, city and phone number. For each order of a product from a given supplier for a given project, we store the number of parts ordered, the price of the order, the date, and the comment. The information system SPJ includes the following tables. Parts pid, name, price ); Projects( jid, name, company, budget, start, duration ); Suppliers sid, name, address, city, phone ); Orders oid, pid, jid, sid, quantity, price, date, comment );arrow_forward
- EBK JAVA PROGRAMMINGComputer ScienceISBN:9781337671385Author:FARRELLPublisher:CENGAGE LEARNING - CONSIGNMENTProgramming Logic & Design ComprehensiveComputer ScienceISBN:9781337669405Author:FARRELLPublisher:Cengage