EBK PRACTICAL MANAGEMENT SCIENCE
5th Edition
ISBN: 9780100655065
Author: ALBRIGHT
Publisher: YUZU
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6.5, Problem 28P
Summary Introduction
To determine: The optimal solution using solver.
Introduction: The variation between the present value of the
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
For the following problem, provide an objective in words, data
definition, variable definition, and algebraic formulation (using
summation notation when possible). You do not need to implement
and solve.
Submit your solution as an attached file. You may type up your work
using Microsoft Word.
Hire-a-Car System rents three types of cars at two different locations. The profit
contribution made per day for each car type at each location is listed below.
Car Type
Location
Economy
Mid-size
Luxury
A
$25
$40
$10
$30
$35
$45
The management forecasts the demand per day by car type as follows:
125 rentals for Economy cars, 55 rentals for Mid-size cars, and 40
rentals for Luxury cars. The vehicle capacity of each location is 100 cars
in location A and 120 cars in location B.
A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load meter moved. An analyst has prepared the following flow and distance matrices:
Distances (meters) Flows (Loads per week)
From/To I II III From/To X Y Z
I - 10 20 X - 0 80
II - - 10 Y 30 - 150
III - Z 100 130 -If the company were to locate departments X, Y, and Z in areas 1, 2, and 3, respectively, what would be the total distance (in meters) loads would be moved each week?A. 3,100B. 3,600C. 6,200D. 7,200E. 8,200
Work must…
Create spreadsheets and use Solver to determine the correct volumes to be produced to minimize cost for the following problem. Your company has two trucks that it wishes to use on a specific contract. One is a new truck the company is making payments on, and one is an old truck that is fully paid for. The new truck’s costs per mile are as follows: 54₵ (fuel/additives), 24₵ (truck payments), 36₵ (driver), 12₵ (repairs), and 1₵ (misc.). The old truck’s costs are 60₵ (fuel/additives), 0₵ (truck payments), 32₵ (rookie driver), 24₵ (repairs), and 1₵ (misc.). The company knows that truck breakdowns lose customers, so it has capped estimated repair costs at $14,000. The total distance involved is 90,000 miles (to be divided between the two trucks).
Chapter 6 Solutions
EBK PRACTICAL MANAGEMENT SCIENCE
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Seas Beginning sells clothing by mail order. An important question is when to strike a customer from the companys mailing list. At present, the company strikes a customer from its mailing list if a customer fails to order from six consecutive catalogs. The company wants to know whether striking a customer from its list after a customer fails to order from four consecutive catalogs results in a higher profit per customer. The following data are available: If a customer placed an order the last time she received a catalog, then there is a 20% chance she will order from the next catalog. If a customer last placed an order one catalog ago, there is a 16% chance she will order from the next catalog she receives. If a customer last placed an order two catalogs ago, there is a 12% chance she will order from the next catalog she receives. If a customer last placed an order three catalogs ago, there is an 8% chance she will order from the next catalog she receives. If a customer last placed an order four catalogs ago, there is a 4% chance she will order from the next catalog she receives. If a customer last placed an order five catalogs ago, there is a 2% chance she will order from the next catalog she receives. It costs 2 to send a catalog, and the average profit per order is 30. Assume a customer has just placed an order. To maximize expected profit per customer, would Seas Beginning make more money canceling such a customer after six nonorders or four nonorders?arrow_forwardA transport company engaged in carying parcels has three branches to serve five customers. This distance (km) from each branch to each of the customers is given below: Branches Customers Number of C trucks available I 10 12 6. 15 II 4. 4. 6. 6. 7. 12 III 15 7. 11 13 8. 16 Number of 4. 6. trucks required i. Find out using Vogel's Approximation Method (VAM) the allocation of trucks from branches to customers in order to minimize the total cost of transportation assuming that the cost is proportional to distance. What is the minimum required distance (km) to be run by the trucks? i. If an amival of a V.V.I.P. blocks the traffic from branch II to customers D and E, what should be the optimal allocation in order to minimize the total transportation cost? 111. 8.arrow_forwardConsider the following linear programming model: maximize Z = 3x1 + 2x2 subject to : x1 +x2 ≤ 1 x1 + x2 ≥ 2 x1,x2 ≥ 0 a) Write this model in a standard (augmented) form. (i.e. Introduce slack/surplus, artificial etc.)b) Constract the initial simplex tableau and carry on your calculations to solve this model using the simplex method. Interpret your result.arrow_forward
- Cox Electric makes electronic components and has estimated the following for a new design of one of its products: Fixed Cost = $7,000 Material cost per unit = $0.15 Labor cost per unit = $0.10 Revenue per unit = $0.65 Production Volume = 12,000 Per-unit material and labor cost together make up the variable cost per unit. Assuming that Cox Electric sells all it produces, build a spreadsheet model that calculates the profit by subtracting the fixed cost and total variable cost from total revenue, and answer the following questions. (a) Construct a one-way data table with production volume as the column input and profit as the output. Breakeven occurs when profit goes from a negative to a positive value; that is, breakeven is when total revenue = total cost, yielding a profit of zero. Vary production volume from 5,000 to 50,000 in increments of 5,000. In which interval of production volume does breakeven occur? to units (b) Use Goal Seek to find the exact breakeven point.…arrow_forwardFacility Location. A paper products manufacturer has enough capital to build and manage some additional manufacturing plants in the United States in order to meet increased demand in three cities: New York City, NY; Los Angeles, CA; and Topeka, KS. The company is considering building in Denver, CO; Seattle, WA; and St. Louis, MO. Max Operating Capacity 400 tons/day 700 tons/day Denver Seattle $10/ton $17/tor $5/ton $11/ton.... $18/ton.... $28/ton Los Angeles Topeka New York City Figure 1: Graphical representation of the given data = • The cost fi of building plants in these cities is fi $10,000,000 in Seattle. Unmet Demand 300 tons/day 100 tons/day 500 tons/day • Due to geographic constraints, plants in Denver and Seattle would have a maximum operating capacity kį of 400 tons/day and 700 tons/day respectively. $5,000,000 in Denver and f2 = • The cost cij per ton of transporting paper from city i to city j is outlined in Figure 1. • The unmet demand d, for Los Angeles, Topeka, and New…arrow_forwardA company needs to locate three departments (I, II, and III) in the three areas (A, B, and C) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.40 per load per meter moved. An analyst has prepared the following distances and flow matrices: Distance (meters) Flows (loads per week) From/To A B C From/To I II III A - 30 40 I - 30 110 B - 60 II 90 - 70 C - III 70 60 - In what areas, A, B, and C, should departments I, II, and III be located that minimize the total cost of moving loads over…arrow_forward
- Due to increased sales, a company is considering building three new distribution centers (DCs) to serve four regional sales areas. The annual cost to operate DC 1 is $500 (in thousands of dollars). The cost to operate DC 2 is $600 (in thousands of dollars.). The cost to operate DC 3 is $525 (in thousands of dollars). Assume that the variable cost of operating at each location is the same, and therefore not a consideration in making the location decision. The table below shows the cost ($ per item) for shipping from each DC to each region. Region DC A B C D 1 1 3 3 2 2 2 4 1 3 3 3 2 2 3 The demand for region A is 70,000 units; for region B, 100,000 units; for region C, 50,000 units; and for region D, 80,000 units. Assume that the minimum capacity for the distribution center will be 500,000 units. Write the constraints for the three distribution centers.arrow_forwardVogel's Approximation Method The three blood banks in Franklin County are coordinated through a central office that facilitates blood delivery to four hospitals in the region. The cost to ship a standard container of blood from each bank to each hospital is shown in the table below. Also given are the biweekly number of containers available at each bank and the biweekly number of containers of blood needed at each hospital. Find an initial solution to the table below using the Vogel’s Approximation Method. How many shipment should be made from Bank 3 to Hospital 4? O 20 O 30 O 40 O 50 How many shipment should be made from Bank 1 to Hospital 1? * O 90 O 40 O 50 O 30arrow_forwardVogel's Approximation Method The three blood banks in Franklin County are coordinated through a central office that facilitates blood delivery to four hospitals in the region. The cost to ship a standard container of blood from each bank to each hospital is shown in the table below. Also given are the biweekly number of containers available at each bank and the biweekly number of containers of blood needed at each hospital. Find an initial solution to the table below using the Vogel’s Approximation Method. How many shipment should be made from Bank 3 to Hospital 1? * a. 90 b. 30 c. 50 d. 40 How many shipment should be made from Bank 2 to Hospital 3? * a. 10 b. 20 c. 40 d. 30arrow_forward
- The High-Price Oil Company owns a pipeline network that is used to convey oil from its source to several storage locations. A portion of the network is as follows: Due to the varying pipe sizes, the flow capacities vary. By selectively opening and closing sections of the pipeline network, the firm can supply any of the storage locations. a. If the firm wants to fully utilize the system capacity to supply storage location 7, how long will it take to satisfy a location 7 demand of 100,000 gallons? What is the maximal flow for this pipeline system? b. If a break occurs on line 2–3 and that line is closed down, what is the maximal flow for the system? How long will it take to transmit 100,000 gallons to location 7?arrow_forwardHeller Manufacturing has two production facilities that manufacture baseball gloves. Production costs at the two facilities differ because of varying labor rates, local property taxes, type of equipment, capacity, and so on. The Dayton plant has weekly costs that can be expressed as a function of the number of gloves produced TCD(X) = x2 - X + 3 where X is the weekly production volume in thousands of units and TCD(X) is the cost in thousands of dollars. The Hamilton plant's weekly production costs are given by TCH(Y) = y2 + 2Y + 2 where Y is the weekly production volume in thousands of units and TCH(Y) is the cost in thousands of dollars. Heller Manufacturing would like to produce 5,000 gloves per week at the lowest possible cost. (a) Formulate a mathematical model that can be used to determine the optimal number of gloves to produce each week at each facility. min s.t. = 5 X, Y 2 0 (b) Use Excel Solver or LINGO to find the solution to your mathematical model to determine the optimal…arrow_forwardSuppose you are planning a road trip (by car) from San Francisco to New York City. You will need to do some research to review distances between the nodes (stops) and the fact that on the way there, you are required to stop in Nashville, Tennessee. Here are other factors to consider when developing your shortest-route: You can only drive at the average speed of 65 MPH The actual driving limit is 9-hour per day You are only allowed to drive during daylight hours Based on your shortest-route model: How many total one-way miles from San Francisco to New York by way of Nashville? How many hours of driving and how many total days? Share a significant take-a-way from this exercise.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,