MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
5th Edition
ISBN: 9781305577398
Author: Nicholas J. Garber; Lester A. Hoel
Publisher: Cengage Learning US
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6, Problem 18P
To determine
(a)
The maximum queue length that will be formed.
To determine
(b)
The total delay.
To determine
(c)
The number of vehicles that will be affected by the incident.
To determine
(d)
The average individual delay.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Consider the problem of traffic flow on a three-lane (one direction) freeway which can be described by the Greenshields model. One lane of the three lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take several hours. It is estimated that the capacity at the work zone will be reduced by 28 percent of that of the section just upstream of the work zone. The mean free flow speed of the highway is 60 mi/h and the jam density is 140 veh/mi/ln. It is estimated that the demand flow on the highway during the emergency repairs is 86 percent of the capacity.
Using the deterministic approach, determine the following for the expected repair periods of 1 h,1.5 h,2.5 h,2.75 h, and 3 h.
(a)
the maximum queue length (in veh) that will be formed
(b)
the total delay (in h)
(c)
the number of vehicles that will be affected by the incident
(d)
the average individual delay (in min)
(e)
Plot a graph of average individual delay…
Consider the problem of traffic flow on a three-lane (one direction) freeway which can be described by the Greenshields model. One lane of the three lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take several hours. It is estimated that the capacity at the work zone will be reduced by 30 percent of that of the section just upstream of the work zone. The mean free flow speed of the highway is 60 mi/h and the jam density is 130 veh/mi/ln. It is estimated that the demand flow on the highway during the emergency repairs is 86 percent of the capacity.
Using the deterministic approach, determine the following for the expected repair periods of 1 h, 1.5 h, 2.5 h, 2.75 h, and 3 h.
(a)
the maximum queue length (in veh) that will be formed
1 h veh1.5 h veh2.5 h veh2.75 h veh3 h veh
(b)
the total delay (in h)
1 h h1.5 h h2.5 h h2.75 h h3 h h
(c)
the number of vehicles that will…
Consider the problem of traffic flow on a three-lane (one direction) freeway which can be described by the Greenshields model. One lane of the three lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take several hours. It is estimated that the capacity at the work zone will be reduced by 29 percent of that of the section just upstream of the work zone. The mean free flow speed of the highway is 55 mi/h and the jam density is 130 veh/mi/ln. It is estimated that the demand flow on the highway during the emergency repairs is 84 percent of the capacity.
Using the deterministic approach, determine the following for the expected repair periods of 1 h, 1.5 h, 2.5 h, 2.75 h, and 3 h.
(a)
the maximum queue length (in veh) that will be formed
(b)
the total delay (in h)
(c)
the number of vehicles that will be affected by the incident
(d)
the average individual delay (in min)
Chapter 6 Solutions
MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
Ch. 6 - Prob. 1PCh. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Prob. 5PCh. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10P
Ch. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 22PCh. 6 - Prob. 23PCh. 6 - Prob. 24PCh. 6 - Prob. 25PCh. 6 - The arrival times of vehicles at the ticket gate...Ch. 6 - Prob. 27P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Traffic flow on a three-lane (one direction) freeway can be described by the Greenshields model. One lane of the three lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take 2 hours. It is estimated that the capacity at the work zone will be reduced by 35 percent of that of the section just upstream of the work zone. The mean free flow speed of the highway is 60 mi/h and the jam density is 125 veh/mi/ln. If it is estimated that the demand flow on the highway during the emergency repairs is 90 percent of the capacity, using the deterministic approach, determine the following. (a) the maximum queue length (in veh) that will be formed Your response is within 10% of the correct value. This may be due to roundoff error, or you could have a mistake in your calculation. Carry out all intermediate results to at least four-digit accuracy to minimize roundoff error. veh (b) the total delay (in h) Your response differs…arrow_forwardTraffic flow on a three-lane (one direction) freeway can be described by the Greenshields model. One lane of the three lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take 2 hours. It is estimated that the capacity at the work zone will be reduced by 25 percent of that of the section just upstream of the work zone. The mean free flow speed of the highway is 60 mi/h and the jam density is 140 veh/mi/ln. If it is estimated that the demand flow on the highway during the emergency repairs is 85 percent of the capacity, using the deterministic approach, determine the following. the maximum queue length (in veh) that will be formed the total delay (in h) the number of vehicles that will be affected by the incident the average individual delay (in min)arrow_forwardTraffic flow on a three-lane (one direction) freeway can be described by the Greenshields model. One lane of the three lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take 2 hours. It is estimated that the capacity at the work zone will be reduced by 35 percent of that of the section just upstream of the work zone. The mean free flow speed of the highway is 50 mi/h and the jam density is 115 veh/mi/In. If it is estimated that the demand flow on the highway during the emergency repairs is 85 percent of the capacity, using the deterministic approach, determine the following. (a) the maximum queue length (in veh) that will be formed Your response differs from the correct answer by more than 10%. Double check your calculations. veh (b) the total delay (in h) h (c) the number of vehicles that will be affected by the incident veh (d) the average individual delay (in min) minarrow_forward
- Traffic flow on a three-lane (one direction) freeway can be described by the Greenshields model. One lane of the three lanes on a section of this freeway will have to be closed to undertake an emergency bridge repair that is expected to take 2 hours. It is estimated that the capacity at the work zone will be reduced by 25 percent of that of the section just upstream of the work zone. The mean free flow speed of the highway is 65 mi/h and the jam density is 125 veh/mi/In. If it is estimated that the demand flow on the highway during the emergency repairs is 85 percent of the capacity, using the deterministic approach, determine the following. (a) the maximum queue length (in veh) that will be formed veh (b) the total delay (in h) h (c) the number of vehicles that will be affected by the incident veh (d) the average individual delay (in min) minarrow_forwardTraffic & Highway Engineering Chapter 6 question 6-18arrow_forwardA six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak hour traffic volume is 3900 vehicles, compute for the driver population factor used?arrow_forward
- An old urban four-lane freeway has the following characteristics: Lane width: 11 feet Interchange density: 1 per mile Peak Hour Factor (PHF): 0.9 Commuters only No lateral clearance 5% trucks, no RVs Rolling terrain a) What is the capacity of this freeway? b) The present peak-hour volume on this facility is 3,650 vehicles per hour (veh/h). The anticipated growth in traffic is expected to be 0.5% per year. To avoid breakdown (Level of Service F), in how many years will substantial improvements be needed to this facility?arrow_forwardA 6-lane new urban freeway is suggested to be designed with the following data: F.ADT = 45000 vpd, design hour factor= 0.12 and directional split = 65%. Rolling terrain, 10% trucks, 5% buses, 6% Rvs, PHF is 0.91 and all traffic are commuters. Then based on the HCM 2000 procedure, the equivalent passenger-car hourly flow rate is about ..... .... ..... .. а. 1410 b. 2105 O C. none d. 1650 е. 1255arrow_forwardA six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak-hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak-hour traffic volume is 3900 vehicles, what value for the driver population factor was used?arrow_forward
- 4. The AADT of a freeway is observed to be 35,000 veh/day, its K factor is 0.15, and its directional distribution factor is 0.6. (a) What is the directional design-hour volume (DDHV) of this freeway? (b) Suppose that the free-flow speed of this freeway is 60 mph, all traffic are passenger cars driven by commuters, PHF = 1, and it is currently operating at LOS D (max flow of D). How many lanes does the freeway have?arrow_forwardA freeway is being designed for a location in mountainous terrain. The expected free-flow speed is 55 mi/h. Lane widths will be 12 ft and shoulder widths will be 6 ft. During the peak hour, it is expected there will be a directional peak-hour volume of 2700 vehicles, 12% large trucks and buses and 6% recreational vehicles. The PHF and driver population adjustment are expected to be 0.88 and 0.90, respectively. If a level of service no worse than D is desired, determine the necessary number of lanes.arrow_forwardA six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak-hour traffic volume is 3900 vehicles, b.) Determine vparrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning