Operations Management (Comp. Instructor's Edition)
Operations Management (Comp. Instructor's Edition)
13th Edition
ISBN: 9781259948237
Author: Stevenson
Publisher: MCG
Question
Book Icon
Chapter 6, Problem 15P
Summary Introduction

To determine: The new placement of departments that will minimize the total transportation costs.

Introduction:

Product layouts:

Product layout is a production system where the equipment and workstations are placed along the production and assembly lines.  A conveyor is used to move the production units along the line. Product layouts have specialized labor to perform specific functions with the help of equipment (programmed to do a specific tasks in a repetitive manner). The layout is mostly based on the processing sequence.

Process layouts:

Process layout is a production system where the equipment is placed in a system based on their functions. The production line is planned to eliminate wastes.  In certain process layouts, the machineries and work settings are not arranged as per the standardized production sequence. However, there would be an assembly having similar machineries and operational activities depending on the requirement. For example, paint department.

Expert Solution & Answer
Check Mark

Answer to Problem 15P

Arrangement:

Operations Management (Comp. Instructor's Edition), Chapter 6, Problem 15P , additional homework tip  1

The total transportation cost for the arrangement is $143, 650 per day.

Explanation of Solution

Given information:

  • Work centers 1 and 3 are assigned in two locations and cannot be moved.
  • There are 8 work centers.
  • Cost is $1 per load per meter.
  • The departments are 1, 2, 3, 4, 5, 6, 7, and 8.
  • The locations are A, B, C, D, E, F, G, and H.

Distances between locations (meters):

To A B C D E F G H
From
A 40 40 60 120 80 100 110
B 60 40 60 140 120 130
C 45 85 40 70 90
D 40 50 40 45
E 90 50 40
F 40 60
G 40
H

Number of load per day between departments:

To 1 2 3 4 5 6 7 8
From
1 10 5 90 370 135 125 0
2 360 120 40 115 45 120
3 350 110 40 20 190
4 190 70 50 200
5 10 40 10
6 50 20
7 20
8

Locations:

Operations Management (Comp. Instructor's Edition), Chapter 6, Problem 15P , additional homework tip  2

Arrangement of departments:

The numbers of trips between work centers is shown and are ranked from high to low.

Work centers pair Number of loads Ranking
1–2 10
1–3 5
1–4 90 11
1–5 370 1
1–6 135 6
1–7 125 7
1–8 0
2–3 360 2
2–4 120 8 (Tied)
2–5 40
2–6 115 9
2–7 45
2–8 120 8 (Tied)
3–4 350 3
3–5 110 10
3–6 40
3–7 20
3–8 200 4
4–5 190 5 (Tied)
4–6 70 12
4–7 50
4–8 190 5 (Tied)
5–6 10
5–7 40
5–8 10
6–7 50
6–8 20
7–8 20

The table clearly indicates that work centers 1-5 have the highest number of trips between them. After that the following work centers have the most number of trips: 2-3, 3-4, 3-8, 4-5, 4-8, 1-6, 1-7, 2-4, 2-8 and others. After continuous trial and error method the following assignment is reached. It is to be noted that, except the pre assigned work centers, slight variations are reasonable in the assignment as long as work centers 2,4 and 8 are nearer to 3, 4 is nearer to 5 and 5 is nearer to 1.

Operations Management (Comp. Instructor's Edition), Chapter 6, Problem 15P , additional homework tip  3

Calculation of cost for each work center pair:

The cost for each department pair is calculated by multiplying the number of loads with the distance with the cost per load per meter.

Department 1-2:

Cost=10×100×1=$1,000

Department 1-3:

Cost=5×120×1=$600

Department 1-4:

Cost=90×60×1=$5,400

Department 1-5:

Cost=370×40×1=$14,800

Department 1-6:

Cost=135×80×1=$10,800

Department 1-7:

Cost=125×40×1=$5,000

Department 2-3:

Cost=360×50×1=$18,000

Department 2-4:

Cost=120×40×1=$4,800

Department 2-5:

Cost=40×120×1=$4,800

Department 2-6:

Cost=115×40×1=$4,600

Department 2-7:

Cost=45×70×1=$3,150

Department 2-8:

Cost=120×40×1=$4,800

Department 3-4:

Cost=350×40×1=$14,000

Department 3-5:

Cost=110×60×1=$6,600

Department 3-6:

Cost=40×90×1=$3,600

Department 3-7:

Cost=20×85×1=$1,700

Department 3-8:

Cost=200×40×1=$8,000

Department 4-5:

Cost=190×40×1=$7,600

Department 4-6:

Cost=70×50×1=$3,500

Department 4-7:

Cost=50×45×1=$2,250

Department 4-8:

Cost=190×45×1=$8,550

Department 5-6:

Cost=10×140×1=$1,400

Department 5-7:

Cost=40×60×1=$2,400

Department 5-8:

Cost=10×130×1=$1,300

Department 6-7:

Cost=50×40×1=$2,000

Department 6-8:

Cost=20×60×1=$1,200

Department 7-8:

Cost=20×90×1=$1,800

Calculation of total cost:

The total cost is calculated by adding the cost of individual work center pairs.

Cost=1,000+600+5,400+14,800+10,800+5,000+18,000+4,800+4,800+4,600+3,150+4,800+14,000+6,600+3,600+1,700+8,000+7,600+3,500+2,250+8,550+1,400+2,400+1,300+2,000+1,200+1,800=$143,650

The total transportation cost for the arrangement is $143,650.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Discuss the principle reasons that employee benefits have risen over the past 20 years, along with how best an organization can provide employees with a fair wage yet also provide some level of employee benefit coverage.
Please assist with the Case Study below as attached. Read the case study below and answer the questions that follow. The Importance of the Planning Phase to Project Success.  Traditional wisdom is that planning and analysis are very important and the more there is in a project, the more successful the project will be. Time spent on these activities will reduce risk and increase project success. On the other hand, inadequate analysis and planning will lead to a failed project. If poor planning has led to failed projects, then perhaps billions of dollars have been lost. But how much is too much? “Light weight” project management techniques such as agile are gaining popularity. Part of their ethos is that less initial planning is better and an evolutionary process is more efficient. QUESTION 1 The article above states: “Traditional wisdom is that planning and analysis are very important and the more there is in a project, the more successful the project will be”.  Describe FIVE (5) ways…
On a daily basis, the van is dispatched from Maplewood Hospital to pickup blood and platelet donations made at its local donation centers. The distances in miles between all locations may be found in the table below. Click the icon to view mileage data for Vampire Van. a. The van travels from the Hospital (A) to (B) to (C) to (D) to (E) and then returns to the Hospital (A). What is the total number of miles that the van must travel using this route? Route ABCDEA requires a total distance of 20.4 miles. (Enter your response rounded to one decimal place.) b. Using Maplewood Hospital as the beginning location, create a route using the Nearest Neighbor heuristic. What is the total number of miles that the van must travel using this route? The new route is A A and requires a total distance of miles. (Enter your response rounded to one decimal place.) More Info Maplewood City Center Westbrook Hospital (A) Donation Site (B) Donation Site (C) Municipal Park Donation Site (D) Valley Hills…

Chapter 6 Solutions

Operations Management (Comp. Instructor's Edition)

Ch. 6.5 - Prob. 1.1RQCh. 6.5 - Prob. 1.2RQCh. 6 - Explain the importance of process selection in...Ch. 6 - Briefly describe the five process types, and...Ch. 6 - Prob. 3DRQCh. 6 - Briefly describe computer-assisted approaches to...Ch. 6 - What is a flexible manufacturing system, and under...Ch. 6 - Prob. 6DRQCh. 6 - Why might the choice of equipment that provides...Ch. 6 - Prob. 8DRQCh. 6 - Prob. 9DRQCh. 6 - Briefly describe the two main layout types.Ch. 6 - Prob. 11DRQCh. 6 - Prob. 12DRQCh. 6 - What is the goal of Line balancing? What happens...Ch. 6 - Why are routing and scheduling continual problems...Ch. 6 - Prob. 15DRQCh. 6 - Prob. 16DRQCh. 6 - The City Transportation Planning Committee must...Ch. 6 - Identify the fixed-path and variable-path...Ch. 6 - Prob. 19DRQCh. 6 - Prob. 20DRQCh. 6 - Prob. 21DRQCh. 6 - Prob. 22DRQCh. 6 - What is cellular manufacturing? What are its main...Ch. 6 - Prob. 24DRQCh. 6 - Prob. 25DRQCh. 6 - Prob. 1TSCh. 6 - What trade-offs are involved when deciding how...Ch. 6 - Who needs to be involved in process selection?Ch. 6 - Prob. 4TSCh. 6 - Prob. 5TSCh. 6 - Prob. 1CTECh. 6 - Prob. 2CTECh. 6 - What are the risks of automating a production...Ch. 6 - Consider an assembly line such as the burrito...Ch. 6 - Prob. 1PCh. 6 - A manager wants to assign tasks to workstations as...Ch. 6 - A manager wants to assign tasks to workstations as...Ch. 6 - A producer of inkjet printer is planning to add a...Ch. 6 - As part of a major plant renovation project, the...Ch. 6 - Twelve tasks, with times and precedence...Ch. 6 - For the given set of tasks, do the following: a....Ch. 6 - A shop works a 400-minute day. The manager of the...Ch. 6 - Arrange six departments into a 2 3 grid so that...Ch. 6 - Using the information given in the preceding...Ch. 6 - Using the information in the following grid,...Ch. 6 - Arrange the eight departments shown in the...Ch. 6 - Arrange the departments so they satisfy the...Ch. 6 - a. Determine the placement of departments fix a...Ch. 6 - Prob. 15PCh. 6 - Develop a process layout that will minimize the...Ch. 6 - Prob. 17PCh. 6 - Rebalance the assembly line in Problem 7. This...
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
MARKETING 2018
Marketing
ISBN:9780357033753
Author:Pride
Publisher:CENGAGE L