Find the seven steps involved in the design of bridge to cross a major river, in accordance with the steps shown in Figure 5.1.
Expert Solution & Answer
![Check Mark](/static/check-mark.png)
Explanation of Solution
List the steps involved in the design of bridge to cross a major river, in accordance with the steps shown in Figure 5.1 as follows:
- 1. Needs Assessment: All the information related to the construction site such as location of site, cost estimation of bridge, construction material required etc.., is collected.
- 2. Establishment of Design Goals: The design goals are established before the execution of work. The design goals decide the cost and time duration of the bridge construction, it also decides the quality standards and quantity of each and every construction material used in the bridge construction.
- 3. Generation of Prototypes: Before the construction of the actual bridge, different prototypes (small replica) of the bridge are made, considering the site condition and other dynamic parameters. Each prototype is having a unique in terms of design, cost and performance.
- 4. Evaluation of alternative solutions: These prototypes of the bridge are analysed for the structural stability and loading conditions and also under different climatic conditions.
- 5. Select a Solution, Make Recommendations: Based on the analysis of the prototypes, the best design which is most suitable in terms of performance, cost and project duration is selected.
- 6. Communicate the Solution: The designer discuss with the client about the selected design and gets the approval from the client for the execution of work. The designer communicates the approved design in the form of construction drawings to the site execution team.
- 7. Implement the Solution: The site execution team consisting of engineers and workers, who executes the construction of bridge as per the construction drawings.
After the completion of Step 7, the entire cycle is repeated starting from Step 1.
Want to see more full solutions like this?
Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Determine the vertical displacement of joint A. Each bar is made of steel and has the cross-sectional area shown. Take E = 29,000 ksi. Use the method of virtual work.
Sketch the Energy Line and the Hydraulic Grade Line through the Venturi meter. Label the contribution of each term from bernoulli equation
2. Design a storage and distribution system for the town of Waffle. The requirements are that fire protection
shall be provided, the minimum water pressure at the top of the apartments is to be 240 kPa and the
maximum system pressure is to be 550 kPa. The following assumptions may be used: Each of the four
apartment buildings is occupied by 50 residents. Each apartment building is four stories high. Each story is 3
meters high. Each house is occupied by three residents. Average daily demand for the village is 500 Lpcd and
the peak hourly demand factor is 6.2. Needed fire flow for the houses is 230 m3/h. and for apartment
building is 500 m3/h, with 2 h duration. System pressure is to be provided from the elevated storage tank.
Minor pressure losses in buildings may be ignored. The distribution system will not contain any loops. Assume
that emergency supply (ES), fire department supply (FDS) or off peak pumping are not provided (they are all
equal to zero). Provide the following…
Chapter 5 Solutions
EBK INTRODUCTION TO SUSTAINABLE CIVIL E
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- 1. The city of Ten Sleep proposes to use Crater Lake for its water supply. Water quality analysis results revealed no detectable Giardia, viruses, or Cryptosporidium in the source water (Giardia cysts <1/100 L; Viruses <1/100 L; Cryptosporidium oocysts <0.075/L). Design a disinfection system to treat 3,500 m³/d by direct filtration and chlorine dioxide (CIO2) will be used as a primary disinfectant. The filtered water has a pH of 7.5 and a temperature of 5°C. Provide the following information for your design: • Determine the total removal/inactivation required for disinfection for each pathogen group • Determine the required CT value to achieve the required inactivation for the design conditions (pH, temperature)arrow_forwardFor the beam shown, where is the peak value of the bending moment diagram? P a. Above C b. Below B c. Above A d. Above B Barrow_forwardThe plane truss shown is a. statically indeterminate b. unstable c. statically determinatearrow_forward
- A simple supported one-way slab spans 24 ft. In addition to its own weight, it supports an uniformly distributed service live load of 100 psf. A masonry wall, which has a service dead load of 1500 lb/ft, is also supported by the slab along with an uniform service floor live load (a line load) of 500 lb/ft loaded as shown below in the figure. (a) (b) Select the depth of the slab using ACI Code's minimum thickness requirements where deflections are not computed. Design the primary steel and temperature steel and show your results in a sketch. The concrete is light-weight concrete and has a unit weight of 110 lb/ft³. Assume 3/4 inch cover on the reinforcement aand that f' 3 ksi and f₁ = 60 ksi. Use #6 bars for the primary steel and #4 bars for the shrinkage and temperature steel. Assume interior exposure, and use ACI 318-19. Repeat part (a) NOT using the ACI Code's minimum thickness requirements for cases where deflections are not computed. Use #6 bars for the primary steel and #4 bars…arrow_forwardWater (at 10° C has n = 1.31 x 106 m²/s) flows from reservoir A (surface elevation 100 m) through a 2.25-m-diameter concrete pipe (e = 0.36 mm; f=0.014) to reservoir B (surface elevation 91.84 m). If the 2 reservoirs are 17 km apart, find the flow velocity V (to 2 decimal places x.xx) ignoring minor losses. 100 m A L = 17 km P₁ h₁ + = + V² 2g D=2.25 m 91.84 m B + h₂ 2g P₂ = =h₂+ + Varrow_forwardThe floor system of an apartment building consists of a 4-inch-thick reinforced concrete slab resting on three steel floor beams, which are in turn supported by two steel girders, as shown below. The areas of cross section of the floor beams and the girders are 18.3 in.2 and 32.7 in.², respectively. Determine the dead load acting on the beam CD. Steel girder (A-32.7 in.2) At I- 25 ft B I Steel column C D Steel floor beam (A =18.3 in.2) I a. 600.0 lb/ft b. 662.3 lb/ft c. 62.3 lb/ft d. 1347.3 lb/ft E 4 in. concrete slab 2 at 12 ft = 24 ftarrow_forward
- What is the classification of the structure shown below? Hinge a. Internally unstable, statically indeterminate b. Internally stable, statically determinate c. Internally stable, statically indeterminate Od. Internally unstable, statically determinatearrow_forwardship construction question. Sketch a bilge keel, garboard strake and sheer strake.arrow_forwardDraw a cross section of a cargo vessel and show the fallowing: bilge strake, sheer strake, keel plate, floor plate.arrow_forward
- Sketch and Describe a double bottom solid floor of a vesselarrow_forwardExplain the difference between a Class A and Class B bulkheadarrow_forwardBy using the yield line theory, determine the moment (m) for an isotropic reinforced concrete two-way slab shown in figure under a uniformly distributed load. Use segment Equilibrium method 2.5 A 7.0m c.g. ㄨˋ B 1 B A IA 2.5 2.0 + 2.5 5.0marrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningResidential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage Learning
- Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage LearningEngineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781337399395/9781337399395_smallCoverImage.gif)
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
![Text book image](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781285852225/9781285852225_smallCoverImage.gif)
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781305086272/9781305086272_smallCoverImage.gif)
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781305084766/9781305084766_smallCoverImage.gif)
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning