Freezing and Boiling Points The following table lists the freezing and boiling points of several substances. Write a program that asks the user to enter a temperature then shows all the substances that will freeze at that temperature, and all that will boil at that temperature. For example, if the user enters −20, the program should report that water will freeze and oxygen will boil at that temperature. Substance Freezing Point (°F) Boiling Point (°F) Ethyl alcohol -173 172 Mercury -38 676 Oxygen -362 -306 Water 32 212
Freezing and Boiling Points The following table lists the freezing and boiling points of several substances. Write a program that asks the user to enter a temperature then shows all the substances that will freeze at that temperature, and all that will boil at that temperature. For example, if the user enters −20, the program should report that water will freeze and oxygen will boil at that temperature. Substance Freezing Point (°F) Boiling Point (°F) Ethyl alcohol -173 172 Mercury -38 676 Oxygen -362 -306 Water 32 212
The following table lists the freezing and boiling points of several substances. Write a program that asks the user to enter a temperature then shows all the substances that will freeze at that temperature, and all that will boil at that temperature. For example, if the user enters −20, the program should report that water will freeze and oxygen will boil at that temperature.
Substance
Freezing Point (°F)
Boiling Point (°F)
Ethyl alcohol
-173
172
Mercury
-38
676
Oxygen
-362
-306
Water
32
212
Process by which instructions are given to a computer, software program, or application using code.
5. Here is a tree corresponding to T(64) for an unknown recurrence relation:
32 + lg 64
8+ lg 16
2+ lg 4
2+lg4
2+lg4
8+ lg 16
2+lg4
7
7
7
7
7
7
7
7
Fill in the details for the corresponding recurrence relation:
T(n) =
T(n/4)+
T(1)=
Put scratch work below. Scratch work is not graded but may be used for regrade
partial credit.
Top screenshot is question, the rest are examples and explinations.
Activity Time (days) Predecessors
Earliest Expected
Completion Time
(TE)
Latest Expected
Completion Time
(TE)
1
4
2
5
1
3456782222
6
1
7
1
4
4
6
2,3
5
3
5
5,7
9
4
7
10
3
6,9
11
5
8,9,10
12
4
11
Slack
Critical Path?
Yes or No