To determine

The difference in measuring the excavation and the measurement of other trade work.

Expert Solution & Answer
Check Mark

Explanation of Solution

Measurement of the excavation work is different from many of the trade works because of the following reasons:

  1. The bid drawings do not offer the proper specifications of the site work operations. The drawings only provide the details regarding the new construction of the project and not the current status of the site.
  2. The most important point is that the dimensions of the foundations are well defined in the drawing but absolutely nothing is disclosed regarding the dimensions of the excavation work.
  3. It is advised in the "Instruction to Bidders" that the contractors should be knowledgeable about the present situation of the site.
  4. The estimator must make an assessment report of the excavation, from data in specifications and drawings; from site visit information, etc. The estimator is advised to make a checklist of the items to be considered on a site visit as the site conditions would influence the pricing of many things in the estimate.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
For the gravity concrete dam shown in the figure, (the vertical stresses at toe and heel ((Pmax & Pmin) are and 52 ton/m respectively. following data are available :- -Unit weight of concrete (yconc) 2.4 ton/m³ -Neglect Wave pressure, silt pressure, ice force and earth quake force. #=0.65 Find factor of safety against sliding and overturning (F.Sslid & F.Sover) A36 115 m m 120 m
A horizontal cantilever of effective length 3a, carries two concentrated loads W at a distance a from the fixed end and W' at a distance a from the free end. Obtain a formula for the maximum deflection due to this loading using Mohr's method. If the cantilever is 250 mm by 150mm steel I beam, 3 m long having a second moment of area I as 8500 cm4, determine W and W'to give a maximum deflection of 6 mm when the maximum stress due to bending is 90 Mpa. Take Young's modulus of material E as 185 Gpa.
For the gravity concrete dam shown in the figure, (the vertical stresses at toe and heel ((Pmax & Pmin) are and 52 ton/m respectively. following data are available :- -Unit weight of concrete (yconc) 2.4 ton/m² -Neglect Wave pressure, silt pressure, ice force and earth quake force. #=0.65 Find factor of safety against sliding and overturning (F.Sslid & F.Sover) AS 115 m Sm 120 m
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Text book image
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Text book image
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Text book image
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning