Chapter 33, Problem 10R
The two methods permitted for connection of a utility-interactive photovoltaic system to a service are known as ______________________ and ______________________.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
1.1 PV modules can be wired together in an array using ______ connections to increase voltage.
a. Terminating
b. Series
c. Parallel
d. AC
1.2 A PV module, also called a solar panel, is comprised of individual photovoltaic _______ wired and mounted together as an integrated unit.
a. Capsules
b. Compartments
c. Chips
d. Cells
1.3 A __________ system uses a storage system that stores the generated electricity so it can provide during times when the system’s panels are not receiving solar energy.
a. Direct coupled
b. Self regulating
c. Charge controlled
d. Indirectly connected
1. 4 __________ energy may have the potential to supply all of the world's energy needs, but at this time, it provides a very small percentage.
a. Coal
b. Natural Gas
c. Diesel
d. Solar
The process of initial start-up for a utility-interactive photovoltaic system is known as _______?
a. pre-operational test prior to inspection by AHJ
b. commissioning
c. going live
d. secundary inspection
The electrical schematic for a utility-interactive photovoltaic system is known as the_____?
a. single line diagram
b. two line diagram
c. one line diagram
d. three line diagram
Chapter 33 Solutions
EBK ELECTRICAL WIRING RESIDENTIAL
Ch. 33 - Prob. 1RCh. 33 - Prob. 2RCh. 33 - Name four electrical hazards associated with...Ch. 33 - Name five components of a utility-interactive...Ch. 33 - Which conductor types are permitted to be...Ch. 33 - To size conductors and overcurrent devices for...Ch. 33 - When is a metallic raceway required for...Ch. 33 - Photovoltaic modules that also serve as an outer...Ch. 33 - Grounding electrode system requirements for a...Ch. 33 - The two methods permitted for connection of a...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- answer the following questionsarrow_forwardPV ________ is a group of PV __________ that comprises the complete PV generating unit. Select one: Array; cell Cell; module Panel; array Array; Panelarrow_forward___________ is an Area on a device characteristic where the ratio between applied voltage and resulting current is constant.arrow_forward
- Building Service Subjectarrow_forwardWhich of the following statements about equipment grounding conductors (EGCS) is true? A. The National Electrical Code permits the EGC to also perform as a grounding electrode conductor. B. More than one EGC must be used if multiple circuits are installed in a single raceway, cable, or cable tray. C. No current should be present in the EGC during normal operation. D. EGCs are required to be decreased in size to address voltage drop.arrow_forwardHTGCR Nuclear power plant can be designed to produce _______ MW of power?arrow_forward
- - Loads, Service, and Overcurrent Protection 6.a. The general lighting load is based on a _______ per square foot basis.A. kilowattB. number of circuitsC. volt-ampereD. general illumination6.b. What's the primary disadvantage of using copper conductors?A. AvailabilityB. WeightC. CostD. Durabilityarrow_forward1. Alternating current systems of less than _______ volts are required to be grounded if they're installed outside as overhead conductors. A. 50 B. 100 C. 75 D. 120arrow_forwardWhat is the service entrance of a building electrical system and what are its components?arrow_forward
- 2. Imagine that you're asked to install an auxiliary grounding electrode at the base of a lighting pole in aparking lot. This auxiliary grounding electrode will be connected to theA. lighting pole's electrical service equipment grounding conductor.B. electrical service's grounding electrode conductor.C. next lighting pole's auxiliary grounding electrode.D. lighting pole's neutral conductor.arrow_forwardCalculate the circuit parameters of Figure. VRB=________, VRC=_______, VCE=_______, VBE=_______, VC=_______, VB=______, VRE=_______, IB=VRB/RB =__________, IC=VRC/RC =________, IE=IC+IB =_________arrow_forwardwhen calculating a dwelling lighting load on the "volt-ampere per ft2" basis, the receptacle load used for floor lamps, table lamps, and so fourtharrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Types of House Wiring - Types of Electrical Wiring - Electrical Wiring; Author: Learning Engineering;https://www.youtube.com/watch?v=A5P-buWX-dA;License: Standard Youtube License