Chapter 3, Problem 39P
a)
Summary Introduction
To determine: The way the company can decrease the cost of meeting the month’s requirement.
Introduction: In linear programming, unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.
b)
Summary Introduction
To investigate: The influence on total cost of two simultaneous changes.
Introduction: In linear programming, unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints then it is said to be unfeasible solution.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A manufacturing plant produces a product 'A' that requires one unit of 'B' and ½ unit of 'C'. Each unit of 'B' is comprised of one unit of 'D', two units of 'E', and one unit of 'F'. Each unit of 'C' requires ½ unit of 'G' and three units of 'H'. The manufacturing lead times for the components are as follows: 'A' - two weeks, 'B' - one week, 'C' - two weeks, 'D' - two weeks, 'E' - three weeks, 'F' - one week, 'G' - two weeks, 'H' - one week. There are 20 units in stock for each of these components. 100 units of 'A' are needed for delivery in seven weeks: a) Develop the product structure and indexed bill of materials for the product. b) Create a gross and net requirements plan for the manufacturer of the product.
Company ZWZ manufactures three products in a serial system; Product XA is manufactured in Stage 1, Product XB in Stage 2, and XC in Stage 3. Product XB has a sales potential in the market; hence, some of it can be sold at the end of Stage 2, and
the remaining can be moved to Stage 3. The third stage produces Product XC, and then delivers it to customers. Two units of Product XA produced in Stage 1 are required for each unit of Product XB in Stage 2. In addition, four units of Product XB
produced in Stage 2 are required for each unit of Product XC in Stage 3.
Stage 1 can only use regular time; however, Stage 2 has the options of using regular time and overtime in manufacturing. On the other hand, Stage 3 has only one alternative, which is subcontracting. The pertinent data are provided below:
Stage 2
Stage 1
11
No overtime
No
subcontracting
No sales
0.07
Unit regular time cost (TL)
Unit overtime cost (TL)
Unit subcontracting cost (TL)
Unit selling price (TL)
Unit processing time (hrs)…
Because of its labor contract, a company must hire enough labor for 100 units ofproduction per week on one shift or 200 units per week on two shifts. It cannot hire,lay off, or assign overtime. During the fourth week, workers will be available fromanother department to work part or all of an extra shift (up to 100 units). There is aplanned shutdown for maintenance in the second week, which will cut production tohalf. Develop a production plan. The opening inventory is 200 units, and the desiredending inventory is 300 units
Chapter 3 Solutions
Practical Management Science
Ch. 3.6 - Prob. 1PCh. 3.6 - Prob. 2PCh. 3.6 - Prob. 3PCh. 3.6 - Prob. 4PCh. 3.6 - Prob. 5PCh. 3.6 - Prob. 6PCh. 3.6 - Prob. 7PCh. 3.6 - Prob. 8PCh. 3.6 - Prob. 9PCh. 3.7 - Prob. 10P
Ch. 3.7 - Prob. 11PCh. 3.7 - Prob. 12PCh. 3.7 - Prob. 13PCh. 3.7 - Prob. 14PCh. 3.7 - Prob. 15PCh. 3.7 - Prob. 16PCh. 3.7 - Prob. 17PCh. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - Prob. 21PCh. 3.8 - Prob. 22PCh. 3.8 - Prob. 23PCh. 3.8 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 31PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 35PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Prob. 41PCh. 3 - Prob. 42PCh. 3 - Prob. 43PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Prob. 48PCh. 3 - Prob. 49PCh. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - Prob. 52PCh. 3 - Prob. 1CCh. 3 - Prob. 2.1CCh. 3 - Prob. 2.2CCh. 3 - Prob. 2.3CCh. 3 - Prob. 2.4CCh. 3 - Prob. 2.5CCh. 3 - Prob. 2.6CCh. 3 - Prob. 2.7CCh. 3 - Prob. 2.8C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Production and Materials Purchases Budgets White Corporation’s budget calls for the following sales for next year:Quarter 1 90,000 units Quarter 3 68,000 unitsQuarter 2 76,000 units Quarter 4 96,000 unitsEach unit of the product requires 3 pounds of direct materials. The company’s policy is to begineach quarter with an inventory of product equal to 5% of that quarter’s estimated sales requirementsand an inventory of direct materials equal to 20% of that quarter’s estimated direct materials requirements for production.Required Determine the production and materials purchases budgets for the second quarter.arrow_forward) The following data have been prepared for master production scheduling purposes in IKEA Australia: End product A: Beginning inventory of 60, Period forecast of 10, Lot size of 30, and 30 hours in lot size. End product B: Beginning inventory of 20, Period forecast of 5, Lot size of 20, and 20 hours in lot size. End product C: Beginning inventory of 30, Period forecast of 15, Lot size of 50, and 50 hours in lot size. Capacity: 38 hours/ week (i) Prepare the master production schedule for these items during the next four periods using the Ethan Allen master production scheduling method. (ii) Suppose that the master production schedule is frozen for the next three periods. What specific impact would the policy have on the IKEA's performance?arrow_forwardThe Fly-Right Airplane Company builds small jet airplanes to sell to corporations for use by their executives. To meet the needs of these executives, the company's customers sometimes order a custom design of the airplanes being purchased. When this occurs, a substantial start-up cost is incurred to initiate the production of these airplanes. Fly-Right has recently received purchase requests from three customers with short deadlines. However, because the company's production facilities already are almost completely tied up filling previous orders, it will not be able to accept all three orders. Therefore, a decision now needs to be made on the number of airplanes the company will agree to produce (if any) for each of the three customers. The relevant data are given in the next table. The first row gives the start-up cost required to initiate the production of the airplanes for each customer. Once production is under way. the marginal net revenue (which is the purchase price minus the…arrow_forward
- A manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 How many supply nodes are present in this problem? Multiple Choice: 4 3 1 8 16arrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 Note: This question requires Solver.Formulate the problem in Solver and find the optimal solution. What is the optimal quantity to ship from Factory B to Customer 3? Multiple Choice 25 units 50 units 75 units 100 units 125 unitsarrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 How many arcs will the network have?arrow_forward
- A machine tool company conducts a job-training programme at a ratio of one for everyten trainees. The training programme lasts for one month. From past experience it has been found thatout of 10 trainees hired, only seven complete the programme successfully. (The unsuccessful traineesare released). Trained machinists are also needed for machining. The company's requirement for thenext three months is as follows:January: 100 machinists, February: 150 machinists and March: 200 machinists.In addition, the company requires 250 trained machinists by April. There are 130 trained machinistsavailable at the beginning of the year. Pay roll cost per month is:Each trainee Rs. 400/- per month.Each trained machinist (machining or teaching): Rs. 700/- p.m.Each trained machinist who is idle: Rs.500/- p.m.(Labour union forbids ousting trained machinists). Build a l.p.p. for produce the minimum costhiring and training schedule and meet the company’s requirement.arrow_forwardIn order to produce 1000 units of X in a week units X is scheduled weekly for Operation B (due to 5% scrap ratio) units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000 units of X per week. The total time required to perform Operation B = minutes per week The total time required to perform Operation A = minutes per week H= Available Time in a week = minutes /week Thus FA = . FB = . Since both of the operations A and B are performed on the same machine machines are requiredarrow_forwardKofi Abebrese runs a small industrial company that specialize in the production of high standard windows for housing estates. A worker is paid GHC0.9 per hour and can produce two window with an hour. Each window uses a frame costing GHC1 and incur a variable overheads of GHC0.7. Each window sells for GH¢3. Currently, due to the economic condition, work is rather slack and three employees are occupied in carrying out extensive repairs to Kofi Abebrese's own house. Kofi owns a warehouse next to the factory, which had been used as a factory store, in the past. It is now let out on a renewable annual lease of GHC600. A new building company, Allied Consult, which specializes in the production of prefabricated houses has asked Kofi if he would be interested in accepting a contract for GHC30,000 which will be for a year initially, to produced molded internal building sections. Kofi estimates that, the contract will take 13,200 hours of works, or the work of five men for a year, and that…arrow_forward
- Green Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/40 of a day and 1/75 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $275 and $225, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. The optimum solution is: Number of trucks to be produced per day = nothing (round your response to two decimal places).arrow_forwardGreen Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/25 of a day and 1/75 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/50 of a day to assemble either type of vehicle in the assembly shop. AT1 truck and a C1 car yield profits of $325 and $250, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. The optimum solution is: Number of trucks to be produced per day = 12.50 (round your response to two decimal places). Number of cars to be produced per day = 37.50 (round your response to two decimal places). Optimal solution value =(round your response to two decimal places).arrow_forwardGreen Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/40 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/50 of a day to assemble either type of vehicle in the assembly shop. AT1 truck and a C1 car yield profits of $325 and $220, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. The optimum solution is: Number of trucks to be produced per day = 240 (round your response to two decimal places).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,