Chapter 29, Problem 11R
(a)
To determine
Mention the Code which covers an optional method to find the residential service-entrance loads.
(b)
To determine
Does the section of the Code is appropriate to a two-family residence?
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
- Loads, Service, and Overcurrent Protection
6.a. The general lighting load is based on a _______ per square foot basis.A. kilowattB. number of circuitsC. volt-ampereD. general illumination6.b. What's the primary disadvantage of using copper conductors?A. AvailabilityB. WeightC. CostD. Durability
All of the following are NOT included when calculating the usable area of a dwelling to compute the required lighting load, EXCEPT for ____.
Select one:
a. open porches
b. crawl spaces
c. unfinished basements
d. garages
27.
In addition to installation rules, the NEC® is concerned with the ____.
Select one:
A. TYPES OF INSTALLATION METHODS
B. ELECTRICAL CONTRACTOR LICENSING REQUIREMENTS
C. SUPERVISING AGENCY
D. TYPE AND QUALITY OF ELECTRICAL WIRING SYSTEM MATERIALS
Chapter 29 Solutions
EBK ELECTRICAL WIRING RESIDENTIAL
Ch. 29 - Prob. 1RCh. 29 - a. What is the unit load per ft2 for the general...Ch. 29 - a. What is the ampere rating of the circuits that...Ch. 29 - Why is the air-conditioning load for this...Ch. 29 - What demand factor may be applied when four or...Ch. 29 - What load may be used for an electric range rated...Ch. 29 - What is the calculated load for an electric range...Ch. 29 - What is the calculated load when fixed electric...Ch. 29 - On what basis is the neutral conductor of a...Ch. 29 - Why is it permissible to omit an electric space...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- A residential air-conditioning unit is installed in the attic. a. Is a lighting outlet required? __________ b. What Code section applies? __________ c. If a lighting outlet is required, how shall it be controlled? __________ d. What Code section applies? __________ e. Is a receptacle outlet required? __________ f. What Code section applies? __________arrow_forward16. A complete circuit is often referred to as a(n) _____ circuit. Select one: A. OPEN B. SHORTED C. GROUNDED D. CLOSEDarrow_forwardOn site plans, all evevations are referenced from_. A. The centerline of a street B. Ground level C. A bench mark D. A test boringarrow_forward
- The ________parameters may not reflect the actual operating conditions but simply provide an indication of the level of each parameter to expect for general use. a.hybrid-pi b.hybrid c.pi d.rearrow_forwardElectric metal tubing (EMT) provides protection from ____. Select one: A. INADVERTENT GROUNDING B. LIGHTENING C. WATER DAMAGE D. ALL BUT SEVERE PHYSICAL DAMAGEarrow_forwardWhich of the following sub-station have lesser clearance between equipments. a. Underground sub-station O b. All the answers c. Indoor sub-station O d. Outdoor sub-stationarrow_forward
- Explain each option & Choose the correct option. 4) The _ calculated load is rarely placed on an electrical system.A. optionalB. standardC. total 5) What's the primary disadvantage of using copper conductors?A. CostB. AvailabilityC. Weight 6) You're evaluating the components of a multioccupancy building that won't have an on-site employee. To be compliant with the NEC, each occupant will need to have access to their ownA. service-disconnecting means.B. service conductor.C. cable attachment point.D. emergency fire water pump disconnect ..arrow_forwardAccording to the NEC, the term _______ means "recognized as suitable for a specific purpose described in the code." A. labeled B. listed C. approved D. identifiedarrow_forwardRaceway fill calculations are a prerequisite in ____ needed for particular circuits. Select one: A. MATERIAL REQUIREMENTS B. SCHEMATIC REQUIREMENTS C. DETERMINING THE SIZE OF RACEWAY D. CIRCUIT LOADSarrow_forward
- ____ current occurs when the system neutral is grounded improperly downstream from the service equipment. Select one: A. PHASED B. OBJECTIONABLE C. POSITIVE D. NEGATIVEarrow_forward[Fill-in-the-blank] in dwelling units shall supply only loads within that dwelling unit or no loads associated only with that dwelling unit. Select one: a. None of these b. Ground-fault protection c. Service-entrance conductors d. Branch circuitsarrow_forward1._____ must not be installed beneath openings through which materials may be moved, such as openings in farm and commercial buildings, and must not be installed where they will obstruct entrance to these buildings. A. Overcurrent protection devices. B. Overhead-service conductors C. Grounding conductors D. Wiring systemsarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Types of House Wiring - Types of Electrical Wiring - Electrical Wiring; Author: Learning Engineering;https://www.youtube.com/watch?v=A5P-buWX-dA;License: Standard Youtube License