Chapter 28, Problem 28.1Q
To determine
The two different methods of floor framing.
Expert Solution & Answer
Explanation of Solution
The common methods of framing the floor system are given below.
- Conventional joist − In this method floor beam to be used is selected by the project designer. It is used in upper framing of the floor system.
- Post and beam − This method used in case where basement is not used in the lower floor. In this method more amount of concrete is required while requirement of floor joist is reduced.
Want to see more full solutions like this?
Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
3. Please describe the requirements for the removal of formwork.
Stone Cladding on Steel Trusses.
What is Glued–Laminated Timbers?
Chapter 28 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 28 - Prob. 28.1QCh. 28 - Prob. 28.2QCh. 28 - Prob. 28.3QCh. 28 - Prob. 28.4QCh. 28 - Prob. 28.5QCh. 28 - Prob. 28.6QCh. 28 - Prob. 28.7QCh. 28 - Prob. 28.8QCh. 28 - Prob. 28.9QCh. 28 - Prob. 28.10Q
Ch. 28 - Prob. 28.11QCh. 28 - Prob. 28.12QCh. 28 - Prob. 28.13QCh. 28 - Prob. 28.14QCh. 28 - Prob. 28.16QCh. 28 - Prob. 28.17QCh. 28 - Prob. 28.18QCh. 28 - Prob. 28.19QCh. 28 - Prob. 28.20QCh. 28 - Prob. 28.21QCh. 28 - Prob. 28.24QCh. 28 - Prob. 28.25QCh. 28 - Prob. 28.26QCh. 28 - Prob. 28.27QCh. 28 - Prob. 28.28QCh. 28 - Prob. 28.29QCh. 28 - Prob. 28.30QCh. 28 - Prob. 28.32QCh. 28 - Prob. 28.33QCh. 28 - Prob. 28.34QCh. 28 - Prob. 28.35QCh. 28 - Prob. 28.37QCh. 28 - Prob. 28.38QCh. 28 - Prob. 28.39Q
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Assuming all dimensional lumber framing, list all elements that will see shrinkage in the vertical direction. What is the required size and spacing of nails if used to fasten the floor sheathing to the joists – assume 7/8” osb is used for the subfloor. What is the nailing requirements between the 2 top plates of the wall? Provide a sketch of this detaarrow_forwardList all the common ways of attaching stone cladding to a building. Make a simple sketch to explain each system.arrow_forward(Please Show your complete solutions including diagrams if necessary and enclose/highlight all final answers) Given a floor framing plan, estimate the quantity and board foot of floor joist and the T&G flooring required.arrow_forward
- Discuss the procedure for erecting pre-cast concrete units and the types of connections used?arrow_forwardQuestion: Draw a plan view of a W steel beam attached to a base plate. The base plate is 1' 3" x 1' 3". There are four anchor bolts in the base plate, with a dimension of 8" between each anchor bolt. The W beam will be welded to the base plate using a 4 fillet weld. Show all dimensions and appropriate symbols.arrow_forwardThe total length of exterior walls of a residential building is 650 lf. The 8-foot long 2x4 studs are spaced 16 in. OC or less. The drawing of the building shows there are 20 corners requiring three studs. Studs are installed on single 2x4 bottom sill plates and capped by double 2x4 top plates for the entire length of the walls. Both bottom and top plates are 16-ftlong each. Prepare a list of materials for the wall studs, corner studs, sill plates, and top plates. For each of the materials, show the nominal dimension, number of pieces of each length, the length ofa lumber, and the total linear feet. Estimate the total direct cost and cost per linear foot of wall for furnishing and installing the studs and plates. Assume $0.75/bf for lumber, $30.00/hour carpenters, and $24.00/hr for laborers. Use the average value in Table 12.10 for the labor-hoursarrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningConstruction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning