(a)
The surveyor’s authority if the line established is agreeable to both clients.
It is the surveyor’s responsibility to resolve any dispute that exists between the parties involved. Disputes between two neighborsregarding their boundary line should be at first tried to be solved by l cooperation if parties are not ready to set any compromise then the surveyor should act asthe witness ofthe legal proceedings.
The surveyor’s authority or responsibility if the line established is agreeable to both clients is to go for the written agreement of acompromise between the parties involved.
(b)
The surveyor’s authority if the line established is not accepted by one or both clients.
It is the surveyor’s responsibility to resolve any dispute that exists between the parties involved. Disputes between two neighbors regarding their boundary line should be at first tried to be solved by cooperation if parties are not ready to set any compromise then the surveyor should act as witness of the legal proceedings.
The surveyor’s authority if the line established is not accepted by one or both clients then the disputes can’t be solved by mutual compromise. Here boundaries must be established by legal proceedings of the court where surveyor will be an expert witness.

Want to see the full answer?
Check out a sample textbook solution
Chapter 21 Solutions
ELEMENTARY SURVEYING LL W/MASTERING ENGR
- : The 6-cm-diameter pipe in Fig. contains glycerin [specific gravity 0.95], flowing at a rate of 6 m³/h. Verify that the flow is laminar. For the pressure measurements shown, is the flow up or down? What is the indicated head loss for these pressures? 3.7 atm B 2.1 atm 12 m Aarrow_forwardFind the discharge if K entrance =0.1, Kvalve-1, e=0.26mm, U= 1× 10-6m² ? sec 5 m Water at 20°C 6 cm D=5cm, L 2 m Open jet Butterfly valve DC 107 at 30°arrow_forwardWhat level (h) must be maintained in Fig to deliver a flow rate of Q=0.425L/sec in commercial-steel pipe e=0.1mm, U= 1 * 10-6m²/sec? Water at 20°C h L=24m D=120mmarrow_forward
- 17-24. Design a water distribution system for the Village of Waffle (Figure P-17-24). The specific de- sign requirements of the client are as follows: 128 m Figure P-17-24 Village of Waffle. -120 m 120 m Open in new tab 00 N ☐ Pancake Road D Apartments ☐ DD. D ☐ 128 m Coffee Creek DODQ00000 Eggs Road State Road 00000 ㅁㅁㅁㅁㅁㅁ Syrup River _128 m 136 m 120 m ㅁㅁㅁ Syrup River 112 m 104 m 100-Year flood -112 m 120 m- 128 m Water tower Grd El 137 m 100 m Share a. Fire protection to be provided by the water distribution system. b. Minimum water pressure at top of apartment building is to be 240 kPa. c. Maximum system pressure is to be 550 kPa. The following assumptions may be used in the design: a. Each of the four apartment buildings is occupied by 50 residents. Each apartment building is four stories high. Each story is 3 m high. b. Each house is occupied by three residents. c. Average daily demand for the village is 500 Lpcd. d. Peaking factor is 6.2 for peak hour demand. e. Needed fire flow…arrow_forwardTwo group of students are collecting traffic data at the two sections A and B 200 meters apartalong a highway. Group A shows that 5 vehicles pass those sections at interval of 8, 9, 10, 11and 13 sections respectively. If the speeds of the vehicles were 80, 72, 64, 56 and 48 kmph.Compute : (i) the time mean speed (ii) space mean speed, and (b)what will be the averagedensity of the above traffic streamarrow_forwardA person entering public transport center to purchase intercity Bus ticket. There is two ticket line to purchase tickets. Each ticket purchase takes an average of 12 seconds. The average arrival rate is 3 persons/minute. Find (a) Probability of having one traveler in the system, (b) the average length of queue, (c)average waiting time in queue, (d) average time spend in system. Arrival follows Poisson distribution and service time follows negative exponential distribution.arrow_forward
- Use recommended referencing style (APA) for all materials you used in the presentation of the report. Question 1 Ivan Institute has secured funds to construct an oval-like lecture hall at their new campus at a cost of 3 million United States Dollars. As a consultant of the project, you have a mandate to package the project for the most qualified contractor. Carry out the procurement process from advertisement to awardarrow_forwardThe calibrated Greenberg model is of the form, v = 32ln(295/k),where k is in veh/mile and v is in mile/hr.(a)Sketch the v-k relationship and discuss the obviousdisadvantage of the model. b)Determine (i) the jam density, (ii) the capacity or maximum flowand (iii) the values of speed and density at capacity. (c)Sketch the q-k and v-q relationshipsand indicate the points obtained in (b) above.arrow_forwardVehicles begin to arrive at an amusement park entrance at 8:00 A.M. at a rate of 1000veh/h. Some of these vehicles have electronic identifiers that allow them to enter the park immediately, beginning at 8:00 A.M., without stopping (they are billed remotely). All vehicles without such identifiers stop at a single processing booth, but they wait in line until it opens at 8:10 A.M. Once open, the operator processes vehicles at μ(t) = 8 + 0.5t [where μ(t) is in vehicles per minute and t is in minutes after 8:10 A.M.]. An observer notes that at 8:25 there are exactly 20 vehicles in the queue. What percent of arriving vehicles have electronic identifiers and what is the total delay (from the 8:00 A.M. until the queue clears) for those vehicles without the electronic identifiers (assume D/D/1 queuing)?arrow_forward
- 1. For truss given in a figure below, determine reactions, and forces in all truss members. De- termine forces using two methods independently: (a) method of joints, and (b) method of sections. Compare your results and verify that your solutions are accurate. Assume that force F = 10kN. 2m 2m 2m ▼F ▼F 4m ▼F 4marrow_forward1) Determine if the existing sedimentation basins are sufficient to accommodate the projected future capacity. If not, design upgrades to the sedimentation basins. A) Current Capacity: 22.5 MGD B) Future Capacity: 34.5 MGD for 110,000 residents C) If not, design upgrades to the sedimentation basins. 2) Specify the design flow rate, the type of basin (circular vs. rectangular) 3) Specify the basin dimensions (length, width, water depth or diameter and water depth). 4) Specify the dimensions of the launders (if applicable) and the length of the weir.arrow_forwardThe capacity of a freeway lane with free-flow speed of 70mph and jam density average vehicle spacing 40ft assuming greenshields’s model applies. Please explain step by step and show formulaarrow_forward
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning