Traffic and Highway Engineering - With Mindtap
5th Edition
ISBN: 9781305360990
Author: Garber
Publisher: CENGAGE L
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 20, Problem 16P
To determine
A suitable thickness of the concrete pavement if the working stress of the concrete is
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Need type answer
The T-intersection has 2,400 collision incidents over the last three years. The annual daily traffic is shown in the figure below
Determine the accident rate of the intersection.
Question 4
One stretch of two-lane two-way roadway that traverses through level terrain is expected
to carry 1400 vehicle per hour. Determine the Level of Service (LOS) in the peak
direction for the road based on average travel speed (ATS) if the characteristics of the
roadway are as follows:
Table Q4-1
Percentage of Trucks
Percentage of Recreational Vehicle
Peak Hour Factor
10
0.97
60:40
60
Percent Directional Split
Percent no-passing Zone
Lane Widths
Shoulder Widths
Design Speed
Road Length
Access Points
3.35 m
1.2 m
96 km/h
8 km
10 access points per km
State all assumption (if any) used in calculation..
with central reserve the current traffic in 2019 expressed by AADT is 3000
vehicle in both direction. the improved road with design life traffic 20 years
will be opened to traffic in 2024. The estimated annual growth rate of traffic
is 5%.
1000pcu/hr
12% f ADT
60% of total volume
16% of hourly volume
Lane capacity
K
D
Th
Q1-B:1-How are travel time and delay studies used?
Chapter 20 Solutions
Traffic and Highway Engineering - With Mindtap
Ch. 20 - Portland cement concrete consists of what four...Ch. 20 - List and briefly describe the five main types of...Ch. 20 - What is the main requirement for the water used in...Ch. 20 - Prob. 4PCh. 20 - Prob. 5PCh. 20 - Prob. 6PCh. 20 - Prob. 7PCh. 20 - Prob. 8PCh. 20 - Prob. 9PCh. 20 - Prob. 10P
Ch. 20 - Prob. 11PCh. 20 - Prob. 12PCh. 20 - Repeat Problem 20-12, with the slab containing...Ch. 20 - Prob. 14PCh. 20 - Prob. 15PCh. 20 - Prob. 16PCh. 20 - Prob. 17PCh. 20 - Prob. 18PCh. 20 - An existing rural 4-lane highway is to be replaced...Ch. 20 - Prob. 20PCh. 20 - Prob. 21PCh. 20 - Prob. 22PCh. 20 - Prob. 23PCh. 20 - Prob. 24PCh. 20 - Prob. 25PCh. 20 - Prob. 26PCh. 20 - Prob. 27P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- The T-intersection has 1,539 collision incidents over the last 7 years. The annual daily traffic is 53,155 veh/day. Determine the accident rate of the intersection per MEV Express your answer in 2 decimal places.arrow_forwardConsider the freeway and traffic conditions described in Problem 6.3. If 180 of the 1800 vehicles observed in the peak hour were large trucks and buses, what would the level of service of this freeway be on a 5-mi, 6% downgrade?arrow_forwardIt is estimated that after 25 years in a section of highway, the average daily traffic will be 15000 vehicles. It is found that ratio of design hourly volume to the average daily traffic was 15%. The one way traffic volume in the predominant direction is 60% of the two way design hourly volume. Determine the directional ?design hourly volume after 25 years **arrow_forward
- Scheduled maintenance will close two of the four westbound lanes of a freeway during one weekday for the period from 9:00 AM to 4:00 PM. The demand on the two lanes are as follows: Time Demand, vph 9:00-10:00 AM 4000 10:00-11:00 AM 3500 11:00-12:00 NN 2500 12:00-1:00 PM 2000 1:00-2:00 PM 2000 2:00-3:00 PM 2000 3:00-4:00 PM 2000 If the estimated capacity of the 4 lanes with 2 lanes open is 2960 vph, a. compute the time when maximum queue occurs. 11:00 AM b. compute the maximum queue formed. 1580 vehicles c. compute the maximum length of queue if the average length of cars is equal to 5 meters. 1975 m Show all necessary diagrams and solutions.arrow_forwardA) The following traffic counts were taken on a rural highway during the morning peak hour at (9:00-10:00 am) on Saturday of a week. Time periods (minute) Number of vehicles Find: 9:00-9:30 AM 412 9:30-9:45 AM 702 9:45-10:00 AM 254 1. The hourly volume, the peak rate of flow within the hour, and the peak hour factor. 2. The daily volume for Saturday if the hourly expansion factor (HEF) is 14. B) At a highway segment, six vehicles travel the same distance of 20 miles during 21, 25, 30, 29, 31, and 25 minutes, respectively. These vehicles have stopped at a check points for about 5 minutes. Find the average running and overall travel speeds. C) A parking garage located in Misan city center opens its doors to serve 350 vehicles from 8 am to 3 pm. An analysis of data collected at the parking site indicates that these vehicles are parked for an average of 1.5 hours. If parking efficiency is 0.9, determine the number of additional spaces needs when the number of space-hours increases by 16%.arrow_forwardIt is estimated that after 25 years in a section of highway, the average daily traffic will be 5000 vehicles. It is found that ratio of design hourly volume to the average daily traffic was 15%. The one way traffic volume in the predominant direction is 60% of the two way design hourly volume. Determine the directional design hourly volume after 25 years?arrow_forward
- Q2b.arrow_forwardi need the answer quicklyarrow_forward3. Determine the LOS for pedestrians at two-phase signalised intersection with a cycle length of 90 s. the phase serving the major street vehicular traffic gets 50s of green whereas the phase serving the minor street vehicular traffic gets 30 s of green. Useful formula: dp Table for assessing the LOS LOS A B C D E F 0.5(C-g)² C Average delay/pedestrian (s) >5 ≥ 5-10 > 10-20 >20-30 ≥ 30-45 > 45arrow_forward
- A Four Lane freeway is located on rolling terrain with a free flow speed of 70 mph,12ft lanes, and no lateral obstructions within 8 ft of the pavement edges. the traffic stream consists of cars, buses and large trucks (no recreational vehicles) . A weekend directional peak hour volume of 1800 vehicles (*regular users*)is observed ,with 700 arriving in the mostly congested 15 minutes period . if a level of service no worse than C is required ,determine the maximum number of large trucks and buses that can be present in the peak hour traffic stream.. Dislike for wrong answersarrow_forwardB- A traffic count was conducted to a rural highway if the peak 15 mints 800 vehicles and peak hourly factor (PHF) 0.95 the directional distribution (35:65)% and traffic composition is 75%p.c and 25%truck, 1-Estimate the number of lanes required ? (capacity = 2000 PC/hr/1 lane) 2- Estimate Level of service if the free flow speed 110 km/hr.arrow_forwardNEED NEED ANSWER ASAP !!!arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning