Question
Book Icon
Chapter 2, Problem 7P

a)

Summary Introduction

To compute: The labor productivity and multifactor productivity for each unit.

Introduction: Labor productivity is the measure of productivity of a worker during a period of time. It the ratio of total output to the total productivity hours.

a)

Expert Solution
Check Mark

Answer to Problem 7P

Multifactor productivity has dropped from 0.020 to 0.015.

Explanation of Solution

Given information:

Unit Employees Customer processed/day
A 4 36
B 5 40
C 8 60
D 3 20

Hourlywage=$25Overhead=1.0×LaborcostMaterialcost=$5percustomer

Formula:

MultifactorProductivity=OutputTotalcostLaborProductivity=CustomersperdayEmployeesTotalcost=Laborcost+Overheadcost+Materialcost

Laborcost=Numberofworkers×8hours×$25/hourOverheadcost=Laborcost×1.00Materialcost=Customers×$5/customer

Calculation of multifactor productivity:

Unit Employees Customer processed/day Labor cost Overhead cost Material cost Total cost Labor productivity MFP (2decimal) MFP (3decimal)
A 4 36 800 800 180 1780 9 0.02 0.020
B 5 40 1000 1000 200 2200 8 0.02 0.018
C 8 60 1600 1600 300 3500 7.5 0.02 0.017
D 3 20 600 600 100 1300 6.6666667 0.02 0.015

Table 1

Excel Worksheet:

OPERATIONS MANAGEMENT(LL)-W/CONNECT, Chapter 2, Problem 7P , additional homework tip  1

Calculation of multifactor productivity:

Unit A:

Labor cost is calculated by multiplying number of workers (4) with 8working hours and 25 hourly wages which gives 800.

Overhead cost is calculated by multiplying Labor cost of 800 with 1.0 which gives 800.

Material cost is calculated by multiplying 36 with 5 which gives 180.

Total cost is calculated by adding labor cost of 800, overhead cost of 800 and material cost of 180 which yields 1780.

Labor productivity is calculated by dividing 36 with 4 which yields 9.

Multifactor productivity is calculated by dividing 36 with the total cost of 1,780 which yields 0.02 (2-decimal) and 0.020 (3 decimal).

Same procedure is followed for unit B, C and D the result is shown in table 1.

Hence, multifactor productivity has dropped from 0.020 to 0.015.

b)

Summary Introduction

To compute: The labor productivity and multifactor productivity for each unit.

Introduction: Multifactor productivity is also referred as total factor productivity. It is the measure of economic performance by comparing the amount of goods and services produced to the total input used to produce the output.

b)

Expert Solution
Check Mark

Answer to Problem 7P

Multifactor productivity has dropped from 0.022to 0.017.

Explanation of Solution

Given information:

Every employee process on additional customers.

Unit Employees Customer processed/day
A 4 40
B 5 45
C 8 68
D 3 23

Hourlywage=$25Overhead=1.0×LaborcostMaterialcost=$5percustomer

Formula:

MultifactorProductivity=OutputTotalcostLaborProductivity=CustomersperdayEmployeesTotalcost=Laborcost+Overheadcost+Materialcost

Laborcost=Numberofworkers×8hours×$25/hourOverheadcost=Laborcost×1.00Materialcost=Customers×$5/customer

Calculation of multifactor productivity:

Unit Employees Customer processed/day Labor cost Overhead cost Material cost Total cost Labor productivity MFP (2decimal) MFP (3decimal)
A 4 40 800 800 200 1800 10 0.02 0.022
B 5 45 1000 1000 225 2225 9 0.02 0.020
C 8 68 1600 1600 340 3540 8.5 0.02 0.019
D 3 23 600 600 115 1315 7.6666667 0.02 0.017

Table 2

Excel Worksheet:

OPERATIONS MANAGEMENT(LL)-W/CONNECT, Chapter 2, Problem 7P , additional homework tip  2

Calculation of multifactor productivity:

Unit A:

Labor cost is calculated by multiplying number of workers (4) with 8 working hours and 25 hourly wages which gives 800.

Overhead cost is calculated by multiplying Labor cost of 800 with 1.0 which gives 800.

Material cost is calculated by multiplying 40 with 5 which gives 200.

Total cost is calculated by adding labor cost of 800, overhead cost of 800 and material cost of 200 which yields 1800.

Labor productivity is calculated by dividing 40 with 4 which yields 10.

Multifactor productivity is calculated by dividing 40 with the total cost of 1,800 which yields 0.02 (2-decimal) and 0.022 (3 decimal).

Same procedure is followed for unit B, C and D the result is shown in table 2.

Hence, multifactor productivity has dropped from 0.022to 0.017.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Question 6. An electrical engineering company is designing two types of solar panel systems: Standard Panels (S) and High-Efficiency Panels (H). The company has certain constraints regarding the hours of labor and material available for production each week. Each Standard Panel requires 4 hours of labor and 2 units of material and each High-Efficiency Panel requires 3 hours of labor and 5 units of material. The company has a maximum of 60 hours of labor and 40 units of material available per week. The profit from each Standard Panel is GH¢80, and the profit from each High-Efficiency Panel is GH¢100. The company wants to determine how many of each type of panel to produce in order to maximize profit. i) Solve this LPP by using graphical analysis ii) What will be the slack at the optimal solution point? Show calculation.
qusestion 6. An electrical engineering company is designing two types of solar panel systems: Standard Panels (S) and High-Efficiency Panels (H). The company has certain constraints regarding the hours of labor and material available for production each week. Each Standard Panel requires 4 hours of labor and 2 units of material and each High-Efficiency Panel requires 3 hours of labor and 5 units of material. The company has a maximum of 60 hours of labor and 40 units of material available per week. The profit from each Standard Panel is GH¢80, and the profit from each High-Efficiency Panel is GH¢100. The company wants to determine how many of each type of panel to produce in order to maximize profit. i. Formulate a linear programming model of the problem for the company. ii Convert the linear programming model formulated in (a) to a standard form.
G ווח >>> Mind Tap Cengage Learning 1- CENGAGE MINDTAP Chapter 09 Excel Activity: Exponential Smoothing Question 1 3.33/10 e Submit 自 A ng.cengage.com C Excel Online Student Work G A retail store records customer demand during each sales period. 1. What is the f... Q Search this course ? ✓ Co Excel Online Tutorial Excel Online Activity: Exponential Smoothing A-Z A retail store records customer demand during each sales period. The data has been collected in the Microsoft Excel Online file below. Use the Microsoft Excel Online file below to develop the single exponential smoothing forecast and answer the following questions. Office Video X Open spreadsheet Questions 1. What is the forecast for the 13th period based on the single exponential smoothing? Round your answer to two decimal places. 25.10 2. What is the MSE for the single exponential smoothing forecast? Round your answer to two decimal places. 21.88 Activity Frame ? 3. Choose the correct graph for the single exponential…
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Management, Loose-Leaf Version
Management
ISBN:9781305969308
Author:Richard L. Daft
Publisher:South-Western College Pub
Text book image
Understanding Management (MindTap Course List)
Management
ISBN:9781305502215
Author:Richard L. Daft, Dorothy Marcic
Publisher:Cengage Learning
Text book image
Foundations of Business (MindTap Course List)
Marketing
ISBN:9781337386920
Author:William M. Pride, Robert J. Hughes, Jack R. Kapoor
Publisher:Cengage Learning
Text book image
Principles of Management
Management
ISBN:9780998625768
Author:OpenStax
Publisher:OpenStax College