Sustainable Energy, Si Edition
2nd Edition
ISBN: 9781337551670
Author: DUNLAP, Richard A.
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 2, Problem 12P
(a)
To determine
Calculate the lifetime of the resource.
(b)
To determine
Calculate the lifetime of the resource.
(c)
To determine
Calculate the lifetime of the resource.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Using In M = n ln b, what annual growth rate (b) in percent, leads to the mathematically convenient
factor of M = 10 growth every century (n =
100).
Consider one farmer using an aquifer. The volume of water in the aquifer is described by Xt+1 = Xt – Yt + Qt where Xt is the volume of water in period t, Yt is the extraction of water in period t and Qt is precipitation. The marginal net benefits of the farmer in each period are described by
MNBt = 20 - Yt
There are two periods. The amount of water in the first period is X0 = 7 and Q0 = 1.5. The farmer cannot use more water than available at the beginning of each period such that Yt ≤ Xt. With a discount rate of 10%, what is the efficient water use in the first period?
Solve the problem with complete solution.
2. If 60,000 is due at the end of 4 years at 5% compounded annually. What is its present value?
Chapter 2 Solutions
Sustainable Energy, Si Edition
Ch. 2 - A quantity has a doubling time of 110 years....Ch. 2 - The population of a particular country has a...Ch. 2 - Prob. 4PCh. 2 - Prob. 5PCh. 2 - The total world population in 2012 was about 7...Ch. 2 - The population of a state is 25,600 in the year...Ch. 2 - The population of a country as a function of time...Ch. 2 - Prob. 9PCh. 2 - Prob. 10PCh. 2 - Prob. 11P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- The Shell Oil Refinery developed an oil well which is estimated to contain 5,000,000 barrels of oil at an initial cost of P 50,000,000. What is the depletion charge during the year where it produces half million barrels of oil? Use Unit or Factor method in computing depletionarrow_forwardAS1. NO4 DATA ANALYSISarrow_forward04:- The amount of water flowing from a certain catchment area at the proposed dam site are tabulated blow, if water is to be used to feed the turbines of hydropower plant at uniform rate. Determine the initial storage required to maintain the uniform demand as above Months Inflow at the proposed Average Demand site ( x10 m') (X10 m') January 2.83 10.8533 February 4.25 10.8533 March 5.66 10.8533 April 18.4 10.8533 May 22.64 10.8533 June 22.64 10.8533 July 19.81 10.8533 August 8.49 10.8533 September 7.1 10.8533 October 7.1 10.8533 November 5.66 10.8533 December 5.66 10.8533arrow_forward
- The activity duration (days) and resource requirements (units) are shown in the figure below. What is the maximum resource required in a day? A (4 days) Resource: 6 units B (6 days) Resource: 5 units C (10 days) Resource: 4 units D (5 days) Resource: 8 units E (6 days) Resource: 2 unitsarrow_forwardcompare theaccumlated values at the end of 10year if P100 is invested at a rate of 12% compounded annually, semi-annually , quartely, monthly, daily and continuouslyarrow_forwardA gasoline driven pump and an electric pump are being considered for a use in a mine. If the minimum rate, of return is 12%. Annual taxes all in 3%. Gas Elect Gas Elect First cost 12000 25000 Life in Years 5 10 Salvage Value 1000 2000 Annual O.Cost 3200 1800 Annual Repairs 600 400arrow_forward
- Determine the amount of coagulant required per day (kg/day).• Assume that the optimum dosage of alum at 25 mg/L was used and that the density of alum was 600kg/m3, Power = 1736.3 watt, Volume= 10.83 m^3 , water temperature is 20 oC, and velocity Gradient is 400 1/s.• Amount of alum = ? (kg/month)• Volume of alum = ? (m3/month)arrow_forwardQ2: Water is delivered from a reservoir to an irrigation project through an earthen canal at a rate of flow of 5 cumecs. The seepage losses in canal were estimated to be 0.1 cumecs/km, length of canal is 10 km, area of project is 1000 donum, and the depth of water to be applied and stored in the field is 10 cm. What is the application efficiency taking into account that water is applied on the field one day for irrigation? Assume that net area equal to gross area and tg = tn.arrow_forwardQ2: Water is delivered from a reservoir to an irrigation project through an earthen canal at a rate of flow of 5 cumecs. The seepage losses in canal were estimated to be 0.1 cumecs/km, length of canal is 10 km, area of project is 1000 donum, and the depth of water to be applied and stored in the field is 10 cm. What is the application efficiency taking into account that water is applied on the field one day for irrigation? Assume that net area equal to gross area and t, = tn.arrow_forward
- 5. one km^2-cm of volume is equal to O 10 ha-m O 100 ha-m O 1 ha-m O 1000 ha-marrow_forwardThe Saudi Arabian Oil Refinery developed an oil well which is estimated to contain5,000,000 barrels of oil at an initial cost of $ 50,000,000. What is the depletion charge during the year where it produces half million barrels of oil? Use Unit or Factor method in computing depletionarrow_forwardA drum contains a roll of copper wire 15 mm in diameter and 1 KM long. Calculate 1- the volume of wire in cubic m (m3) on the drum. 2- the cost of the drum of wire if copper costs $ 23,941 per cubic m (m3).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you