Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
4th Edition
ISBN: 9781337399395
Author: Pratt, David J.
Publisher: Cengage,
Question
Book Icon
Chapter 2, Problem 10RQ
To determine

The reason and importance of why an estimator needs to visit the site even when extensive site information is provided in bid document.

Blurred answer
Students have asked these similar questions
Which of the following statements is not true when considering precision in surveying?A. Measuring angles to the nearest minute and distances to the nearest hundredth of a foot is usually sufficient for locating theroute of a highway.B. A very accurate survey provides a very high degree of precision.C. Precision is defined as the degree of correctness applied in instruments.D. The most precise instruments can produce inaccurate results i f subjected to mechanical or human error.
Which of the following is not desirable when marking a transit point for conducting a survey?A. Embedding a nail into soft concreteB. Driving a tack flush with the top o f a wooden hubC. Chiseling a cross on an embedded rockD. Driving a nail with flagging into undisturbed earth
A one-story building as shown in the plan, if the height of the concrete floor is 320 m, the width of the wall is 0.24 and the roof is made of reinforced concrete, the amount of iron for the roof is 100 kg m3 and there are downward depressions with a depth of 0.40 and a width of 0.25 along the wall and the amount of reinforcing iron is 89 kg m3 and there are 14 columns with dimensions of 0.500.30 and a height of 2.80, the amount of reinforcing iron is 120 kg m3 Find The amount of bricks used for construction The amount of mortar used for construction (cement + sand) -1 -2 The amount of plaster for the building from the inside is 2 cm thick (cement + sand) -3 Quantity of floor tiles for the room Quantity of concrete for the ceiling and beams. Ceiling thickness: 0.20 m. Total amount of reinforcing steel for the roof (tons) Quantity of reinforcing steel for columns (tons) Total amount of reinforcing steel for balls (tons) -4 -5 -6 -7 -8
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,