The section code of the NEC that covers the necessary locations for Ground fault circuit interrupters in residential applications.

Explanation of Solution
NEC Section 210.8 deals with the locations needed for Ground fault circuit interrupters in residential applications. GFCI safety devices should be mounted in an immediately accessible location. GFCI security is necessary forthe residential electrical system in several regions outside and inside of the house.
GFCI receptacles are used to safeguard people from the dangers of electric shock. Ground fault circuit interrupter receptacles secure the places where they are mounted and may also secure standard duplex receptacles that are mounted farther along the circuit. A Ground fault circuit interrupter circuit breaker also protects ground-fault.
Conclusion:
NEC Section 210.8 with the locations needed for Ground Fault Circuit Interrupters in residential applications.
Want to see more full solutions like this?
Chapter 18 Solutions
EBK RESIDENTIAL CONSTRUCTION ACADEMY: H
- 1. For truss given in a figure below, determine reactions, and forces in all truss members. De- termine forces using two methods independently: (a) method of joints, and (b) method of sections. Compare your results and verify that your solutions are accurate. Assume that force F = 10kN. 2m 2m 2m ▼F ▼F 4m ▼F 4marrow_forward1) Determine if the existing sedimentation basins are sufficient to accommodate the projected future capacity. If not, design upgrades to the sedimentation basins. A) Current Capacity: 22.5 MGD B) Future Capacity: 34.5 MGD for 110,000 residents C) If not, design upgrades to the sedimentation basins. 2) Specify the design flow rate, the type of basin (circular vs. rectangular) 3) Specify the basin dimensions (length, width, water depth or diameter and water depth). 4) Specify the dimensions of the launders (if applicable) and the length of the weir.arrow_forwardThe capacity of a freeway lane with free-flow speed of 70mph and jam density average vehicle spacing 40ft assuming greenshields’s model applies. Please explain step by step and show formulaarrow_forward
- 3. For problems given below, determine all the reaction forces and plot force diagrams for normal forces (N), shear force (T), and moments (M). 150 lb/ft 10 ft C B 2 ft 2 ft -4 ft D 250 lb/ft 50 lb/ft B 150 lb-ft 150 lb-ft -20 ft 10 ft -20 ft 200 lb-ftarrow_forwardPlease explain step by step and show all the formula usedarrow_forwardBy using the yield line theory, determine the moment (m) for an isotropic reinforced concrete two- way slab shown in figure under a uniformly distributed load. Using moment method 5 2 7.0m 1 A I c.g. * B c.g 5 2 B c. g. ㄨˋ A A 2.5 2.0 2.5 5.0marrow_forward
- Residential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781337402415Author:Gregory W FletcherPublisher:Cengage LearningResidential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage Learning