The structure stiffness matrix for the frame.

Answer to Problem 16.1P
The structure stiffness matrix for the frame is shown below.
Explanation of Solution
Concept Used:
Write the expression for direction cosine in x-direction.
Here, coordinate of x at near end of the member is
Write the expression for direction cosine in x-direction.
Here, coordinate of y at near end of the member is
Write the global stiffness matrix for the member.
Here, cross-sectional area of the member is
Calculation:
The free body diagram of the frame is shown below.
Figure (1)
Consider the member-1.
Calculate direction cosine in x-direction.
Substitute
Calculate direction cosine in y-direction.
Substitute
The stiffness matrix for member-1 is shown below.
Substitute
Calculate the value of
Substitute
Calculate the value of
Substitute
Calculate the value of
Substitute
Calculate the value of
Substitute
Calculate the value of
Substitute
Substitute
Consider the member-2.
Calculate direction cosine in x-direction.
Substitute
Calculate direction cosine in y-direction.
Substitute
The stiffness matrix for member-1 is shown below.
Substitute
Calculate the value of
Substitute
Calculate the value of
Substitute
Calculate the value of
Substitute
Calculate the value of
Substitute
Calculate the value of
Substitute
Substitute
The final matrix of the frame by assembling matrices (III) and (IV) is shown below.
Conclusion:
The structure stiffness matrix for the frame is shown below.
Want to see more full solutions like this?
- As shown in the figure below, a 1.5 m × 1.5 m footing is carrying a 400 kN load. P Depth (m) 0.0 1.0 2.0 Df Groundwater table (Yw = 9.81 kN/m³) 3.5 Yt = 16.5 kN/m³ E = 9,000 kPa Sandy soil Ysat 17.5 kN/m³ E = 15,000 kPa 6.0 Stiff Clay (OCR = 2) Bedrock Ysat 18.0 kN/m³ eo = 0.8 Cc = 0.15, Cr = 0.02 Eu =40,000 kPa (a) Estimate the immediate settlement beneath the center of the footing. Assuming that Poisson's ratios of sand and soft clay are 0.3 and 0.5, respectively. Use numerical integration approach. For the calculations, use layers (below the bottom of the footing) of thicknesses: 1 m; 1.5 m, and 2.5 m. (b) Determine the primary consolidation settlement beneath the center of the footing. (c) Redo Part (b) if OCR=1.1. Note: Use the 2:1 method to determine the stress increase below the footing. For parts (b) and (c), use the one-dimensional consolidation theory.arrow_forwardAssuming that the whole DMV is only handled by one queue and one server and both the arrival rate (20 customer per hour) and the service rate (30 customers per hour) random variables are Markovian. (a) What is the mean queue length? [3 pts] (b) Percentage of Idle time of the server? [3 pts] (c) Average number in the queue? [3 pts] (d) Average number in the system? [3 pts] (e) The average wait time in the queue? [3 pts] (f) The average wait time in the system? [3 pts] (g) The probability that no one is in the system. [2 pts]arrow_forwardA toll booth on the Thruway experiences an average inter-arrival time of 3 minutes between each vehicle. As an operator, you want to have a mean queue length of at most 2 vehicles. What mean service rate (per hour) will the toll booth need to provide?arrow_forward
- A freeway is to be designed at a location on level terrain for an annual average daily traffic (AADT) of 45,000 vehicles per day. For a conversion of AADT to an annual hourly volume, assume that the K-factor is 0.10 (i.e., the 30th highest hourly volume of the year). In addition, 55% of the peak-hour traffic volume is expected to travel in the peak direction (D = 0.55). This freeway segment will be for regular commuters. Other estimates include: PHF of 0.95, free-flow speed of 65 mph, and 20% trucks of the traffic stream. In order to determine the number of lanes required to provide at least LOS C, answer the following questions. (a) Determine Free Flow Speed (FFS) [4 pts] (b) Find the directional design-hour volume (DDHV) [4 pts] (c) Find fHv [4 pts] (d) Determine the number of lanes required. [4 pts] (e) Check the expected LOS for 2-directional lanes on this freeway segment. [4 pts]arrow_forwardObserving a deterministic queue in 3 hours, suppose vehicles arrive at a rate of 500 vph for the first hour and 150 vph for the second and third hours. The service rate is 150 vph for the first two hours. The server can discharge 500 vehicles for the last hour. (a) What is the queue length after 30 minutes? [4 pts] (b) What is the maximum queue length? [4 pts] (c) When does the maximum queue happen? [4 pts] (d) What is the total delay? [4 pts] (e) Describe how the queue grows and discharges in this queuing process. [4 pts]arrow_forwardPlease explain step by step and show the formula usedarrow_forward
- Find the increase of pressure at points A and B due to a loading q=400 kPa placed on the givenfoundation.arrow_forwardThe 4-story building has a floor dead load D = 80 psf, floor live load , L = 100 psf, roof dead load Dr = 40 psf, roof live load Lr = 60 psf, and snow load S = 50 psf. The length of columns is 18 ft and the column ends are pins (Lx = Ly = 18 ft). 1) Determine Pu on interior columns B2-4 and B2-1 2) Use Table 4-1a (pg 4-12 to 4-24) in AISC to select the lightest W shapes for these columns 3) Use Table 4-4 (pg 4-69 to 4-83) in AISC to select lightest square HSS shape for the columns.arrow_forward1:08 Il LTE Individual Assignment CEQ 31... CIVIL ENGINEERING ROANTICLO (Earthworks Quantities) (Due Date: Friday, 28/03/2025) Done Thumbi Irrigation Scheme in Mzimba district is under threat of flooding. In order to mitigate against the problem, authorities have decided to construct a flood protection bund (Dyke). Figure 1 is a cross section of a 300m long proposed dyke; together with its foundation (key). Survey data for the proposed site of the dyke are presented in Table 1. Table 2 provides swelling and shrinkage factors for the fill material that has been proposed. The dyke dimensions that are given are for a compacted fill. (1) Assume you are in the design office, use both the Simpson Rule and Trapezoidal Rule to compute the total volume of earthworks required. (Assume both the dyke and the key will use the same material). (2) If you are a Contractor, how many days will it take to finish hauling the computed earthworks using 3 tippers of 12m³ each? Make appropriate assumptions.…arrow_forward
- Thumbi Irrigation Scheme in Mzimba district is under threat of flooding. In order to mitigate against the problem, authorities have decided to construct a flood protection bund (Dyke). Figure 1 is a cross section of a 300m long proposed dyke; together with its foundation (key). Survey data for the proposed site of the dyke are presented in Table 1. Table 2 provides swelling and shrinkage factors for the fill material that has been proposed. The dyke dimensions that are given are for a compacted fill. (1) Assume you are in the design office, use both the Simpson Rule and Trapezoidal Rule to compute the total volume of earthworks required. (Assume both the dyke and the key will use the same material). (2) If you are a Contractor, how many days will it take to finish hauling the computed earthworks using 3 tippers of 12m³ each? Make appropriate assumptions. DIKE CROSS SECTION OGL KEY (FOUNDATION) 2m 1m 2m 8m Figure 1: Cross section of Dyke and its foundation 1.5m from highest OGL 0.5m…arrow_forwardthis is from CE-192arrow_forwardThe head-vs-capacity curves for two centrifugal pumps A and B are shown below: Which of the following is a correct statement at a flow rate of 600 ft3/min? Assuming a pump efficiency of 80%. Head [ft] 50 45 40 35- 30 25 20 15 10 5. 0 0 Pump B Pump A 100 200 300 400 500 600 700 800 900 1000arrow_forward
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning