
Applied Statistics and Probability for Engineers
6th Edition
ISBN: 9781118539712
Author: Douglas C. Montgomery
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Question
Chapter 15.6, Problem 58E
a.
To determine
Identify the control chart which is more suitable for the given data.
Construct the control chart.
b.
To determine
Comment on the control of the process.
c.
To determine
Revise the control limits if needed by assuming that assignable causes were present in the given data and eliminate those data points.
d.
To determine
Construct the individual chart and compare this chart with the control chart built in part (a).
Expert Solution & Answer

Want to see the full answer?
Check out a sample textbook solution
Students have asked these similar questions
The U.S. Bureau of Labor Statistics reports that 11.3% of U.S. workers belong to unions (BLS website, January 2014). Suppose a sample of 400 U.S. workers is collected in 2014 to determine whether union efforts to organize have increased union membership.
a. Formulate the hypotheses that can be used to determine whether union membership increased in 2014.H 0: p H a: p
b. If the sample results show that 52 of the workers belonged to unions, what is the p-value for your hypothesis test (to 4 decimals)?
A company manages an electronic equipment store and has ordered
200200
LCD TVs for a special sale. The list price for each TV is
$200200
with a trade discount series of
6 divided by 10 divided by 2.6/10/2.
Find the net price of the order by using the net decimal equivalent.
According to flightstats.com, American Airlines flights from Dallas to Chicago are on time 80% of the time. Suppose 10 flights are randomly selected, and the number
of on-time flights is recorded.
(a) Explain why this is a binomial experiment.
(b) Determine the values of n and p.
(c) Find and interpret the probability that exactly 6 flights are on time.
(d) Find and interpret the probability that fewer than 6 flights are on time.
(e) Find and interpret the probability that at least 6 flights are on time.
(f) Find and interpret the probability that between 4 and 6 flights, inclusive, are on time.
Chapter 15 Solutions
Applied Statistics and Probability for Engineers
Ch. 15.3 - 15-1. Control charts for and R are to be set up...Ch. 15.3 - 15-2. Twenty-five samples of size 5 are drawn from...Ch. 15.3 - 15-3. Control charts are to be constructed for...Ch. 15.3 - 15-4. Samples of size n = 6 are collected from a...Ch. 15.3 - 15-5. The level of cholesterol (in mg/dL) is an...Ch. 15.3 - 15-6. An control chart with three-sigma control...Ch. 15.3 - 15-7. An extrusion die is used to produce aluminum...Ch. 15.3 - 15-8. The copper content of a plating bath is...Ch. 15.3 - 15-9. The pull strength of a wire-bonded lead for...Ch. 15.3 - 15-10. The following data were considered in...
Ch. 15.3 - 15-11. The thickness of a metal part is an...Ch. 15.3 - 15-12. Apply the Western Electric Rules to the...Ch. 15.3 - 15-13. Apply the Western Electric Rules to the...Ch. 15.3 - 15-14. Web traffic can be measured to help...Ch. 15.3 - 15-15. Consider the data in Exercise 15-9....Ch. 15.3 - 15-16. Consider the data in Exercise 15-10....Ch. 15.3 - 15-17. An X control chart with 3-sigma control...Ch. 15.3 - 15-18. An article in Quality & Safety in Health...Ch. 15.4 - 15-19. Twenty successive hardness measurements are...Ch. 15.4 - 15-20. In a semiconductor manufacturing process,...Ch. 15.4 - 15-21. O An automatic sensor measures the diameter...Ch. 15.4 - 15-22. The viscosity of a chemical intermediate is...Ch. 15.4 - 15-23. The following table of data was analyzed in...Ch. 15.4 - 15-24. Pulsed laser deposition technique is a thin...Ch. 15.4 - 15-25. The production manager of a soap...Ch. 15.4 - 15-26. An article in Quality & Safety in Health...Ch. 15.4 - 15-27. An article in Journal of the Operational...Ch. 15.5 - 15-28. Suppose that a quality characteristic is...Ch. 15.5 - 15-29. Suppose that a quality characteristic is...Ch. 15.5 - 15-30. Suppose that a quality characteristic is...Ch. 15.5 - 15-31. A normally distributed process uses 66.7%...Ch. 15.5 - 15-32. A normally distributed process uses 85% of...Ch. 15.5 - 15-33. Reconsider Exercise 15-1. Suppose that the...Ch. 15.5 - 15-34. Reconsider Exercise 15-2 in which the...Ch. 15.5 - 15-35. Reconsider Exercise 15-3. Suppose that the...Ch. 15.5 - 15-36. Reconsider Exercise 15-4(a). Assuming that...Ch. 15.5 - 15-37. Reconsider the diameter measurements in...Ch. 15.5 - 15-38. Reconsider the copper-content measurements...Ch. 15.5 - 15-39. Reconsider the pull-strength measurements...Ch. 15.5 - 15-40. Reconsider the syringe lengths in Exercise...Ch. 15.5 - 15-41. Reconsider the hardness measurements in...Ch. 15.5 - 15-42. Reconsider the viscosity measurements in...Ch. 15.5 - 15-43. Suppose that a quality characteristic is...Ch. 15.5 - 15-44. Suppose that a quality characteristic is...Ch. 15.5 - 15-45. An control chart with 3-sigma control...Ch. 15.5 - 15-46. A control chart for individual observations...Ch. 15.5 - 15-47. A process mean is centered between the...Ch. 15.5 - 15-48. The PCR for a measurement is 1.5 and the...Ch. 15.6 - 15-49. An early example of SPC was described in...Ch. 15.6 - 15-50. Suppose that the following fraction...Ch. 15.6 - 15-51. The following are the numbers of defective...Ch. 15.6 - 15-52. The following represent the number of...Ch. 15.6 - 15-53. The following represent the number of...Ch. 15.6 - 15-54. Consider the data on the number of...Ch. 15.6 - 15-55. In a semiconductor manufacturing company,...Ch. 15.6 - Prob. 56ECh. 15.6 - Prob. 57ECh. 15.6 - Prob. 58ECh. 15.7 - Prob. 59ECh. 15.7 - Prob. 60ECh. 15.7 - 15-61. Consider the control chart in Fig. 15-3....Ch. 15.7 - Prob. 62ECh. 15.7 - Prob. 63ECh. 15.7 - Prob. 64ECh. 15.7 - Prob. 65ECh. 15.7 - Prob. 66ECh. 15.7 - Prob. 67ECh. 15.7 - Prob. 68ECh. 15.7 - Prob. 69ECh. 15.7 - 15-70. Consider an control chart with UCL =...Ch. 15.7 - Prob. 71ECh. 15.7 - Prob. 72ECh. 15.8 - Prob. 73ECh. 15.8 - Prob. 74ECh. 15.8 - Prob. 75ECh. 15.8 - Prob. 76ECh. 15.8 - Prob. 77ECh. 15.8 - Prob. 78ECh. 15.8 - Prob. 79ECh. 15.8 - Prob. 80ECh. 15.8 - Prob. 81ECh. 15.8 - 15-82. A process has a target of μ0 = 100 and a...Ch. 15.8 - 15-83. Heart rate (in counts/minute) is measured...Ch. 15.8 - Prob. 84ECh. 15.8 - Prob. 85ECh. 15.8 - Prob. 86ECh. 15.9 - Prob. 87ECh. 15.9 - Prob. 88ECh. 15.9 - Prob. 89ECh. 15.9 - Prob. 90ECh. 15 - Prob. 91SECh. 15 - 15-92. Rework Exercise 15-91 with and S...Ch. 15 - Prob. 93SECh. 15 - Prob. 94SECh. 15 - 15-95. An article in Quality Engineering [“Is the...Ch. 15 - Prob. 96SECh. 15 - Prob. 97SECh. 15 - Prob. 98SECh. 15 - Prob. 99SECh. 15 - Prob. 100SECh. 15 - Prob. 101SECh. 15 - Prob. 102SECh. 15 - Prob. 103SECh. 15 - Prob. 104SECh. 15 - Prob. 105SECh. 15 - Prob. 106SECh. 15 - Prob. 107SECh. 15 - Prob. 108SECh. 15 - 15-109. The depth of a keyway is an important part...Ch. 15 - Prob. 110SECh. 15 - Prob. 111SECh. 15 - Prob. 112SECh. 15 - Prob. 113SECh. 15 - Prob. 114SECh. 15 - Prob. 115SECh. 15 - Prob. 117SECh. 15 - Prob. 118SECh. 15 - 15-119. Consider an control chart with UCL =...Ch. 15 - Prob. 120SECh. 15 - Prob. 121SECh. 15 - Prob. 122SECh. 15 - Prob. 123SECh. 15 - Prob. 124SECh. 15 - Prob. 125SECh. 15 - Prob. 126SECh. 15 - Prob. 127SECh. 15 - Prob. 128SECh. 15 - Prob. 129SECh. 15 - Prob. 130SECh. 15 - Prob. 131SECh. 15 - 15-132. Consider an control chart with k-sigma...Ch. 15 - Prob. 133SECh. 15 - Prob. 134SECh. 15 - Prob. 135SECh. 15 - Prob. 136SECh. 15 - 15-137. Consider a process whose specifications on...Ch. 15 - Prob. 138SECh. 15 - Prob. 139SECh. 15 - Prob. 140SECh. 15 - Prob. 141SE
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, statistics and related others by exploring similar questions and additional content below.Similar questions
- Show how you get critical values of 1.65, -1.65, and $1.96 for a right-tailed, left- tailed, and two-tailed hypothesis test (use a = 0.05 and assume a large sample size).arrow_forwardSuppose that a sports reporter claims the average football game lasts 3 hours, and you believe it's more than that. Your random sample of 35 games has an average time of 3.25 hours. Assume that the population standard deviation is 1 hour. Use a = 0.05. What do you conclude?arrow_forwardSuppose that a pizza place claims its average pizza delivery time is 30 minutes, but you believe it takes longer than that. Your sample of 10 pizzas has an average delivery time of 40 minutes. Assume that the population standard deviation is 15 minutes and the times have a normal distribution. Use a = 0.05. a. What are your null and alternative hypotheses? b. What is the critical value? c. What is the test statistic? d. What is the conclusion?arrow_forward
- Table 5: Measurement Data for Question 9 Part Number Op-1, M-1 Op-1, M-2 | Op-2, M-1 Op-2, M-2 | Op-3, M-1 Op-3, M-2 1 21 20 20 20 19 21 2 24 23 24 24 23 24 3 4 5 6 7 8 9 10 11 21 12 8222332 201 21 20 22 20 22 27 27 28 26 27 28 19 18 19 21 24 21 22 19 17 18 24 23 25 25 23 26 20 20 18 19 17 13 23 25 25 2 3 3 3 3 2 3 18 18 21 21 23 22 24 22 20 19 23 24 25 24 20 21 19 18 25 25 14 24 24 23 25 24 15 29 30 30 28 31 16 26 26 25 26 25 17 20 20 19 20 20 843882388 20 18 25 20 19 25 25 30 27 20 18 19 21 19 19 21 23 19 25 26 25 24 25 25 20 19 19 18 17 19 17 Question 9 A measurement systems experiment involving 20 parts, three operators (Op-1, Op-2, Op-3), and two measure- ments (M-1, M-2) per part is shown in Table 5. (a) Estimate the repeatability and reproducibility of the gauge. (b) What is the estimate of total gauge variability?" (c) If the product specifications are at LSL = 6 and USL 60, what can you say about gauge capability?arrow_forwardQuestion 5 A fraction nonconforming control chart with center line 0.10, UCL = 0.19, and LCL = 0.01 is used to control a process. (a) If three-sigma limits are used, find the sample size for the control charte 2 (b) Use the Poisson approximation to the binomial to find the probability of type I error. (c) Use the Poisson approximation to the binomial to find the probability of type II error if the process fraction defective is actually p = 0.20.arrow_forwardQuestion 8 Ten parts are measured three times by the same operator in a gauge capability study. The data are shown in Table 4. (a) Describe the measurement error that results from the use of this gauge. I (b) Estimate total variability and product variability. (c) What percentage of total variability is due to the gauge? (d) If specifications on the part are at 100±15, find the P/T ratio for this gauge. Comment on the adequacy of the gauge. 3 Table 4: Measurement Data for Question 8 Part Number Measurement 1 Measurement 2 Measurement 3 1 2 100 95 101 100 93 97 3 101 103 100 4 96 95 97 5 98 98 96 6 99 98 98 7889 95 97 98 100 99 98 100 100 97 10 100 98 98 99arrow_forward
- Question 6 The data shown in Table 3 are and R values for 24 samples of size n = 5 taken from a process producing bearings. The measurements are made on the inside diameter of the bearing, with only the last three decimals recorded (i.e., 34.5 should be 0.50345). Perform a process capability analysis using and R charts for the data from Table 3. Table 3: Data for Question 6 Sample Number R | Sample Number I Ꭱ 1 34.5 3 13 35.4 8 2 34.2 4 14 34.0 6 ∞∞ 31.6 15 37.1 5 4 31.5 4 16 34.9 7 56789 35.0 5 17 33.5 4 34.1 6 18 31.7 3 32.6 4 19 34.0 8 33.8 3 20 35.1 4 34.8 7 10 33.6 8 11 31.9 3 12 38.6 9 2232 21 33.7 2 32.8 1 33.5 24 34.2 2 32 3arrow_forwardQuestion 1 The commercial loan operation of a financial institution has a standard for processing new loan applications in 24 hours. Table 1 shows the number of applications processed each day for the last 20 days and the number of applications that required more than 24 hours to complete. Table 1: Loan Application Data for Question 1 Day Applications Late Day Applications Late 1 200 3 11 219 0 2 250 4 12 238 10 3 240 2 13 250 4 4 300 5 14 302 6 5 200 2 15 219 20 6 250 4 16 246 3 7 246 3 17 251 6 8 258 5 18 273 7 9 275 2 19 245 3 10 274 1 20 260 (a) Set up the fraction nonconforming control chart for this process. Use the variable-width control limit approach. Plot the preliminary data in Table 1 on the chart. Is the process in statistical control? (b) Assume that assignable causes can be found for any out-of-control points on this chart. What center line should be used for process monitoring in the next period, and how should the control limits be calculated?arrow_forwardhelp me with ab please. please handwrite if possible. please don't use AI tools to answerarrow_forward
- help me with ab please. please handwrite if possible. please don't use AI tools to answerarrow_forwardhelp me with abcd please. please handwrite if possible. please don't use AI tools to answerarrow_forwardhelp me with abc please. please handwrite if possible. please don't use AI tools to answerarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- MATLAB: An Introduction with ApplicationsStatisticsISBN:9781119256830Author:Amos GilatPublisher:John Wiley & Sons IncProbability and Statistics for Engineering and th...StatisticsISBN:9781305251809Author:Jay L. DevorePublisher:Cengage LearningStatistics for The Behavioral Sciences (MindTap C...StatisticsISBN:9781305504912Author:Frederick J Gravetter, Larry B. WallnauPublisher:Cengage Learning
- Elementary Statistics: Picturing the World (7th E...StatisticsISBN:9780134683416Author:Ron Larson, Betsy FarberPublisher:PEARSONThe Basic Practice of StatisticsStatisticsISBN:9781319042578Author:David S. Moore, William I. Notz, Michael A. FlignerPublisher:W. H. FreemanIntroduction to the Practice of StatisticsStatisticsISBN:9781319013387Author:David S. Moore, George P. McCabe, Bruce A. CraigPublisher:W. H. Freeman

MATLAB: An Introduction with Applications
Statistics
ISBN:9781119256830
Author:Amos Gilat
Publisher:John Wiley & Sons Inc

Probability and Statistics for Engineering and th...
Statistics
ISBN:9781305251809
Author:Jay L. Devore
Publisher:Cengage Learning

Statistics for The Behavioral Sciences (MindTap C...
Statistics
ISBN:9781305504912
Author:Frederick J Gravetter, Larry B. Wallnau
Publisher:Cengage Learning

Elementary Statistics: Picturing the World (7th E...
Statistics
ISBN:9780134683416
Author:Ron Larson, Betsy Farber
Publisher:PEARSON

The Basic Practice of Statistics
Statistics
ISBN:9781319042578
Author:David S. Moore, William I. Notz, Michael A. Fligner
Publisher:W. H. Freeman

Introduction to the Practice of Statistics
Statistics
ISBN:9781319013387
Author:David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:W. H. Freeman
What Are Research Ethics?; Author: HighSchoolScience101;https://www.youtube.com/watch?v=nX4c3V23DZI;License: Standard YouTube License, CC-BY
What is Ethics in Research - ethics in research (research ethics); Author: Chee-Onn Leong;https://www.youtube.com/watch?v=W8Vk0sXtMGU;License: Standard YouTube License, CC-BY