(a)
Answer to Problem 14.1P
Static survey
Explanation of Solution
Given information:
A baseline of 25 km with dual frequency receiver
There are two surveying methods; they are static surveying method and rapid static surveying method. Rapid static surveying method is limited for a length of 20 km, whereas the static surveying method is used for larger areas with good observation. So for the baseline length of 25 km we are using static surveying method.
Conclusion:
The surveying method used for baseline of 25 km is static method.
(b)
Time period for the baseline
Answer to Problem 14.1P
Explanation of Solution
Given:
A baseline of
Concept used:
Length of a session for baseline of
Calculation:
Conclusion:
The time period for the baseline should be observed is 70 minutes.
(c)
Epoch rate
Answer to Problem 14.1P
Explanation of Solution
Given:
A baseline of
The epoch rate should be
Conclusion:
The epoch rate should be used is
Want to see more full solutions like this?
Chapter 14 Solutions
Elementary Surveying, Global Edition
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning