Concept explainers
Convert the given sources data in the Table accompanied for the problems 13.14 to 13.20 in the textbook from Billions of kilowatt-hours to Billions of Btu.

Answer to Problem 16P
The given sources data in the Table accompanied for the problems 13.14 to 13.20 in the textbook from Billions of kilowatt-hours to Billions of Btu are tabulated in Table 1.
Explanation of Solution
Given data:
Refer to the problem 13.16 in textbook for the accompanying table.
Formula used:
The value of the
Convert 1 hr into seconds,
Rearrange the equation,
Calculation:
Substitute equation (2) in equation (1),
Rearrange the equation for the relation between kWhr to Btu.
For coal:
All the following calculations of conversion are in Billions.
Coal for the year 1980 is,
Substitute
Coal for the year 1990 is,
Substitute
Coal for the year 2000 is,
Substitute
Coal for the year 2005 is,
Substitute
Coal for the year 2010 is,
Substitute
Coal for the year 2020 is,
Substitute
The coal for the year 2030 is,
Substitute
For petroleum:
All the following calculations of conversion are in Billions.
Petroleum for the year 1980 is,
Substitute
Petroleum for the year 1990 is,
Substitute
Petroleum for the year 2000 is,
Substitute
Petroleum for the year 2005 is,
Substitute
Petroleum for the year 2010 is,
Substitute
Petroleum for the year 2020 is,
Substitute
Petroleum for the year 2030 is,
Substitute
For Natural gas:
All the following calculations of conversion are in Billions.
Natural gas for the year 1980 is,
Substitute
Natural gas for the year 1990 is,
Substitute
Natural gas for the year 2000 is,
Substitute
Natural gas for the year 2000 is,
Substitute
Natural gas for the year 2010 is,
Substitute
Natural gas for the year 2020 is,
Substitute
Natural gas for the year 2030 is,
Substitute
For Nuclear:
All the following calculations of conversion are in Billions.
Nuclear of the year 1980 is,
Substitute
Nuclear of the year 1990 is,
Substitute
Nuclear of the year 2000 is,
Substitute
Nuclear of the year 2005 is,
Substitute
Nuclear of the year 2010 is,
Substitute
Nuclear of the year 2020 is,
Substitute
Nuclear of the year 2030 is,
Substitute
For Renewable/Others:
All the following calculations of conversion are in Billions.
Renewable of the year 1980 is,
Substitute
Renewable of the year 1990 is,
Substitute
Renewable of the year 2000 is,
Substitute
Renewable of the year 2005 is,
Substitute
Renewable of the year 2010 is,
Substitute
Renewable of the year 2020 is,
Substitute
Renewable of the year 2030 is,
Substitute
Therefore, the conversion from the Billions of kilowatt-hours to Billions of Btu is tabulated in Table 1 as below,
Table 1
Year | Coal | Petroleum | Natural Gas | Nuclear | Renewable/Other |
1980 | 3964364.644 | 839568.365 | 1181702.929 | 857047.498 | 971629.780 |
1990 | 5440295.783 | 432152.749 | 1272232.717 | 1968805.908 | 1219239.346 |
2000 | 6710783.794 | 379592.824 | 2051319.335 | 2573006.312 | 1216647.203 |
2005 | 6965554.432 | 393945.686 | 2565927.833 | 2641878.821 | 1282816.647 |
2010 | 7568426.513 | 357740.324 | 2641028.311 | 2760043.005 | 1623692.512 |
2020 | 8548734.427 | 364094.232 | 3763682.596 | 2971657.446 | 1758194.194 |
2030 | 11538105.135 | 391378.116 | 3388286.347 | 2971291.918 | 1908300.270 |
Conclusion:
Hence, the conversion for the energy sources from billions kilowatt-hours to billion Btu has been explained.
Want to see more full solutions like this?
Chapter 13 Solutions
LMS Integrated for MindTap Engineering, 2 terms (12 months) Printed Access Card for Moavni's Engineering Fundamentals: An Introduction to Engineering, 5th
- Q2: Design an activated sludge process to treat a waste flow of 15000 m³/day with a BODs of 180 mg/L following primary treatment. The effluent BOD, and SS are to be 20 m mg/L. Assume Xr = 15000 mg/L, X = 2500 mg/L, 0c = 10 day, Y = 0.60, kd=0.05. Determine 1- the reactor volume, 2- the Sludge production rate, 3- the circulation rate, 4- the hydraulic retention time, and 5- the oxygen required? C₁-Ce C 1 XV = 1 +0.532 QxC₁₂ VXF F= - 1+r (1+0.1r)² = Qr= dt Өс Qx Xr-X V R = [= Q YQ(So-S) Oc dx XV 1+Kd0c O₂demand =1.47 (So-S)Q-[1.14Xr(Qw)] Qw total sludge production/X, S = BOD, effluent - 0.63 * SS Warrow_forwardمارت حولة ملانول 60 Design Deceleration tank and screen for W.W.T.P of flow-144000 m² day Design Data: D.T=1-3 min 1-3b, d=1-1.5 m 60 Design Data: velocity= 0.6: 1.5 m/sec . A-Qdfv=b.d, b=2d 233 Design Data: bars used circular of p= 1.5:3 cm. rec. of (1:2 cm) x (2:6 cm) spacing between bars 2.5:5.0 cm fine screen, 2.5 7.5 cm coarse screen Sloping angle on hz (6)=45:60 = depth of water depth in approaching channel=d = ⚫nbars nspacings +1 ⚫b=nbars xo+nspacings I spacing net inclined area = 2 Aapproach channel=nspacing. spacing. L. 1=d/ sin Check: = 1.13 C 2.56 1134(6.05 P. 45.30 *velocity just befor the screen=v₁ = Qa(m³/sec) screen-b.d ≥ 0.6 m/sec. * velocity through the screen=v2 16mm use 2 Qa(m³/sec) nscreens (spacings Spacing).d ≤1.5 m/sec IsP. 22-65 12²² head losses = Ah = 1.4 x ≤0.1 m 2g bav usp = Ubar Q 23.65 k 148.72arrow_forwardCan you please explain the steps of this problem especially the variables for Q when solving for the shear force? Thanks.arrow_forward
- Please show all your steps. Thank you.arrow_forwardThe solution to this problem is 10.5kip. Please explain all the steps.arrow_forwardQ1: Design of trickling filter system single-stage with 3m depth, effluent BOD, of 20 mg/l, influent BODs =250mg/l, flow = 2.63 m³/min and hydraulic flow rate or hydraulic loading rate 25 m/day, r=3arrow_forward
- 04 Q4 A waste effluent of 1.25 m/s with BOD, 183 mg/L, DO=0 mg/L and T = 20 °C is to be discharged into a river of 8 m³/s flow, BOD, = 2mg/L, DO -9.14 mg/L and T= 15 °C. At 20 °C, (K₁) is 0.3/day and (K2) is 0.9/day. The average velocity of the river is 0.8 m/s. 1) Is DO min within the environmental limitations? 2) At what distance is the maximum deficit located. 3) Draw the oxygen sag curve? Given the saturation concentration at 15 °C and at mixed temperature = 10.15 mg/Larrow_forwardCalculate 1- the effluent BOD, of a two-stage trickling filter with the following flows, BOD, and dimensions? Q-5000 m³/day, influent BOD,-280 mg/L, volume of first filter-1000 m³, volume of second filter-800 m³, filter depth-2 m, r₁=1, z=1.25. Also, 2- calculate organic loading rate (BOD, kg/day) 3- Hydraulic loading (m³/m²/d), 4- efficiency of each stage 5- overall removal efficiency.arrow_forwardQ3: Determine the force in each member of the shown truss, and state whether they are tension or compression. 40 kN 3 m 10 kN A 25-1.25 m m -3.5 m- 3 m Barrow_forward
- Q3 Design a secondary clarifier for an activated sludge process with a recycle rate of 25 percent, a MLSS conc. 2500 mg/L, peak flow 9,000 m²/day, depth of tank 3 m and solid loading rate = 4 kg/m²/hrarrow_forwardA- Design grit removal chamber for a W.W.P with hourly flow equal 5000 m'h 410 markarrow_forward05 An average operating data for conventional activated sludge treatment plant is as follows: (1) Wastewater flow, Q-50000m/d (2) Volume of aeration tank, V-12000m (3) Influent BOD, Y.- 300 mg/1 (4) Effluent BOD, YE - 25 mg/1 (5) Mixed liquor suspended solids (MLSS), X₁ = 2500mg/1 (6) Effluent suspended solids, Xg30mg/1 (7) Waste sludge suspended solids, X-9700mg/1 (8) Quantity of waste sludge, Q., -220m³/d Based on the information above data, determine: (a) Aeration period (hrs.) (b) Food to microorganism ratio (F/M) (kg BOD per day/kg MLSS) (c) Percentage efficiency of BOD removal (d) Sludge age (days)arrow_forward
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning