Question
Book Icon
Chapter 12, Problem 3E

1.

To determine

Throughput time is the total time required for the completion of a process. For instance, the time required to manufacture machinery from the beginning till its end is the throughput time. The throughput time comprises process time, inspection time, move time, and queue time. Wait time is not a part of throughput time.

:

The throughput time.

2.

To determine

The manufacturing cycle refers to the amount of time in the manufacturing process that is spent on enriching or improving the product. Basically, it is the time taken by an organization in order to convert raw material into finished goods. Manufacturing cycle time includes material movement time, loading time, idle waiting time, machining and assembly time, inspection time, and so on.

:

The manufacturing cycle efficiency for the quarter.

3.

To determine

Throughput time is the elapsed time from the time of inception of the production process till the goods are dispatched to the customer. The throughput time is made up of four elements. It is the total of process time, inspection time, move time, and queue time.

:

The percentage of throughput time spent in non-value-added activities.

4.

To determine

Delivery cycle time is the total time required to produce as well as deliver the product to the customers. Basically, the elapsed time from the procurement of a client order until the final product is dispatched is the delivery cycle time.

:

The delivery cycle time.

5.

To determine

The manufacturing cycle refers to the amount of time in the manufacturing process that is spent on enriching or improving the product. Basically, it is the time taken by an organization in order to convert raw material into finished goods. Manufacturing cycle time includes material movement time, loading time, idle waiting time, machining and assembly time, inspection time, and so on.

:

The new MCE if by using Lean Production all queue time during production is eliminated.

Blurred answer
Students have asked these similar questions
1. Record the proper journal entry for each transaction. 2. By the end of​ January, was manufacturing overhead overallocated or​ underallocated? By how​ much?
Rocky River Fast Lube does oil changes on vehicles in 15 minutes or less. The variable cost associated with each oil change is $12 (oil, filter, and 15 minutes of employee time). The fixed costs of running the shop are $8,000 each month (store manager salary, depreciation on shop and equipment, insurance, and property taxes). The shop has the capacity to perform 4,000 oil changes each month.
The formula to calculate the amount of manufacturing overhead to allocate to jobs​ is:         Question content area bottom Part 1     A. predetermined overhead rate times the actual amount of the allocation base used by the specific job.   B. predetermined overhead rate divided by the actual allocation base used by the specific job.   C. predetermined overhead rate times the estimated amount of the allocation base used by the specific job.   D. predetermined overhead rate times the actual manufacturing overhead used on the specific job.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Pkg Acc Infor Systems MS VISIO CD
Finance
ISBN:9781133935940
Author:Ulric J. Gelinas
Publisher:CENGAGE L
Text book image
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning
Text book image
Managerial Accounting
Accounting
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:South-Western College Pub
Text book image
Financial And Managerial Accounting
Accounting
ISBN:9781337902663
Author:WARREN, Carl S.
Publisher:Cengage Learning,